Appropriations for Public Works
Act No. 3912, enacted on November 20, 1931, appropriates funds for various public works projects in the Philippines, totaling P5,272,347. The act allocates funds for the construction, maintenance, and repair of public buildings, agricultural schools, roads, bridges, irrigation systems, and other infrastructures. Notably, it emphasizes the use of government-manufactured cement in construction projects, while also outlining specific amounts designated for educational institutions across various provinces. The act establishes a framework for future appropriations and mandates that unspent funds revert to the Insular Treasury after specified deadlines.
Quick Answers
- What is Appropriations for Public Works about?
- Act No. 3912, enacted on November 20, 1931, appropriates funds for various public works projects in the Philippines, totaling P5,272,347. The act allocates funds for the construction, maintenance, and repair of public buildings, agricultural schools, roads, bridges, irrigation systems, and other infrastructures. Notably, it emphasizes the use of government-manufactured cement in construction projects, while also outlining specific amounts designated for educational institutions across various provinces. The act establishes a framework for future appropriations and mandates that unspent funds revert to the Insular Treasury after specified deadlines.
- What type of law is Act No. 3912?
- Appropriations for Public Works (Act No. 3912) is a Philippine Statutes enacted by the Congress of the Philippines.
- When was Appropriations for Public Works enacted?
- Appropriations for Public Works (Act No. 3912) was enacted on Nov 20, 1931.
- What is the citation for Appropriations for Public Works?
- Appropriations for Public Works, Act No. 3912, Nov 20, 1931 (Philippines)
Law Information
- Reference Number
- Act No. 3912
- Date Enacted
- Category
- Statutes
- Subcategory
- Acts
- Jurisdiction
- Philippines
- Enacting Body
- Congress of the Philippines
Full Law Text
November 20, 1931
ACT NO. 3912
AN ACT MAKING APPROPRIATIONS FOR PUBLIC WORKS
SECTION 1. The following sums, or so much thereof as may be necessary, are hereby appropriated out of any funds in the Insular Treasury not otherwise appropriated, to be at the disposal of the Director of Public Works, subject to the approval of the Secretary of Commerce and Communications and the provisions hereinafter set forth, for the purposes mentioned hereunder:
| A. | CONSTRUCTION, IMPROVEMENT, REPAIR, AND MAINTENANCE OF | |||
| PUBLIC BUILDINGS AND OTHER UNCLASSIFIED PROJECTS | ||||
| (a) | For the maintenance, alteration, improvement and | |||
| repair of public buildings and monuments, including | ||||
| upkeep of adjacent grounds: Provided, That this | ||||
| fund shall not be used to improve, alter, or repair a | ||||
| building in such manner, as to make it appear | ||||
| practically new: Provided, further, That P5,000 of | ||||
| this sum shall be disbursed for repairing the buildings | ||||
| and upkeep of grounds of Regan Barracks at | ||||
| Legaspi, Albay; P5,000 for the repair and upkeep of | ||||
| Laoag Normal School, Ilocos Norte, and P5,000 for | ||||
| the repair and upkeep of Cabanatuan Constabulary | ||||
| Barracks, Nueva Ecija | P370,000.00 | |||
| (b) | For the construction, improvement, and repair of the | |||
| following agricultural schools in regularly organized | ||||
| provinces: | ||||
| 1. | Agricultural school of Central Luzon, Muñoz, | |||
| Nueva Ecija | 5,000.00 | |||
| 2. | Agricultural school of Lagangilang, Abra including | |||
| purchase of land and irrigation system | 5,000.00 | |||
| 3. | Agricultural school of Guinobatan, Albay: Provided, | |||
| That any portion of this sum may also be used for the | ||||
| completion of the Guinobatan Central School, on | ||||
| recommendation of the division superintendent | 5,000.00 | |||
| 4. | Agricultural school of Bilar, Bohol | 5,000.00 | ||
| 5. | Agricultural school of Piat, Cagayan | 5,000.00 | ||
| 6. | Agricultural school of Pili, Camarines Sur, | |||
| including purchase of land | 2,000.00 | |||
| 7. | Agricultural school of Banga, Capiz, including | |||
| purchase of land | 5,000.00 | |||
| 8. | Agricultural school of Jones, Isabela | 3,000.00 | ||
| 9. | Agricultural school of Indang, Cavite | 5,000.00 | ||
| 10. | Agricultural school of Cabagan, Isabela | 5,000.00 | ||
| 11. | Agricultural school of San Marcelino, Zambales | 5,000.00 | ||
| ––––––––– | ||||
| Total | 50,000.00 | |||
| ======== | ||||
| (c) | For the construction, improvement, and repair of | |||
| agricultural schools in specially organized provinces: | ||||
| 1. | Agricultural school of Malaybalay, Bukidnon | 4,000.00 | ||
| 2. | Agricultural school of Upi (Awang), Cotabato | 4,000.00 | ||
| 3. | Agricultural school of Lumbatan, Lanao | 4,000.00 | ||
| 4. | Agricultural school of Lapak, Sulu | 4,000.00 | ||
| 5. | Agricultural school of Trinidad, Mountain Province | 4,000.00 | ||
| –––––––––– | ||||
| Total | 20,000.00 | |||
| ========= | ||||
| (d) | For the construction of high schools, normal schools | |||
| and carpentry shops: | ||||
| 1. | High school of Cavite | 14,500.00 | ||
| 2. | Bukidnon Normal Training School and Malaybalay | |||
| Trade School | P8,500.00 | |||
| 3. | For the intermediate school shop, Bucay, Abra | 2,000.00 | ||
| 4. | For the shop building, Bocaue, Bulacan | 2,000.00 | ||
| 5. | For the Indang carpentry shop, Camarines Norte | 2,000.00 | ||
| 6. | For the Talisay carpentry shop, Camarines Norte | 2,000.00 | ||
| 7. | For the Paete School Shop Building, Laguna | 2,000.00 | ||
| 8. | For the Carpentry Shop Building, Tetuan | |||
| Elementary Building, Zamboanga | 3,000.00 | |||
| 9. | For the Carpentry Shop Building, Dipolog, Zamboanga | 3,000.00 | ||
| ––––––––– | ||||
| Total | 39,000.00 | |||
| ======== | ||||
| (e) | For aid to municipalities for the construction, reconstruction, | |||
| alteration, repair, extension and completion of the following | ||||
| elementary and intermediate schools: | ||||
| ABRA | ||||
| 1. | For the Baay barrio school, Langiden | 2,000.00 | ||
| 2. | For the Pilar Elementary School | 4,000.00 | ||
| 3. | For the Langiden Elementary School | 1,500.00 | ||
| 4. | For the Danglas Elementary School | 1,500.00 | ||
| 5. | For the Lagangilang Elementary School | 2,000.00 | ||
| 6. | For the Sal-lapadan Elementary School | 1,000.00 | ||
| 7. | For the Villaviciosa Elementary School | 2,000.00 | ||
| 8. | For the Bucay Domestic Science Building | 1,000.00 | ||
| 9. | For the San Jose Elementary School, Bucay | 1,000.00 | ||
| ––––––––– | ||||
| Total | 16,000.00 | |||
| ======== | ||||
| ALBAY | ||||
| 1. | For the Pinagbobong Elementary School, Tabaco | 2,000.00 | ||
| 2. | For the Matagbac Elementary School, Tabaco | 2,000.00 | ||
| 3. | For the Panoypoy Primary School, Camalig | 2,500.00 | ||
| 4. | For the Maopi Primary School, Daraga | 2,500.00 | ||
| 5. | For the Tabogoc School, Pandan | 5,000.00 | ||
| 6. | For the Supang School, Pandan | 4,500.00 | ||
| 7. | For the Palawig School, Calolbon | 4,000.00 | ||
| 8. | For the Magpanambo school, Polangui | 2,000.00 | ||
| ––––––––– | ||||
| Total | 24,500.00 | |||
| ======= | ||||
| ANTIQUE | ||||
| 1. | For the Bagtasan Primary School, Bugasong | 2,000.00 | ||
| 2. | For the Tiblao Elementary School | 9,000.00 | ||
| 3. | For the Malandog Primary School, San Jose | P2,000.00 | ||
| 4. | For the Santa Justa Primary School, Tibiao | 1,000.00 | ||
| 5. | For the Villar Elementary School | 1,000.00 | ||
| 6. | For the Dao Elementary School, Dao | 3,000.00 | ||
| 7. | For the Diclum Elementary School, Dao | 1,000.00 | ||
| 8. | For the Hamtik Elementary School, San Jose | 2,000.00 | ||
| 9. | For the Solong Primary School, Sibalom | 1,000.00 | ||
| 10. | For the San Pedro Elementary School | 2,000.00 | ||
| 11. | For the Valderrama Elementary School | 2,000.00 | ||
| 12. | For the Gulsihan school, Laua-an | 1,000.00 | ||
| ––––––––– | ||||
| Total | 27,000.00 | |||
| ======== | ||||
| BATAAN | ||||
| 1. | For the Saysain Elementary School, Bagac | 1,000.00 | ||
| 2. | For the Caparangan, Orani Elementary School | 2,000.00 | ||
| 3. | For the Daan-Pare, Orion Elementary School | 1,000.00 | ||
| 4. | For the School of Cupang, Balanga | 1,000.00 | ||
| ––––––––– | ||||
| Total | 5,000.00 | |||
| ======== | ||||
| BATANES | ||||
| 1. | For the Ivanna Elementary School | 7,000.00 | ||
| 2. | For the Basco Elementary School | 3,000.00 | ||
| ———— | ||||
| Total | 10,000.00 | |||
| ======= | ||||
| BATANGAS | ||||
| 1. | For the Munlawing school, Taal | 2,500.00 | ||
| 2. | For the Sampa school, San Luis | 2,500.00 | ||
| 3. | For the Taal Elementary School | 4,000.00 | ||
| 4. | For the San Andres school, Bauan | 3,000.00 | ||
| 5. | For the Laiya school, Bolbok | 2,000.00 | ||
| 6. | For the Lodlod Elementary School, Lipa | 2,500.00 | ||
| 7. | For the Talisay Elementary School | 5,000.00 | ||
| 8. | For the Tambo Elementary School, Lipa | 2,500.00 | ||
| 9. | For the Sulpok Elementary School, Tanawan | 2,000.00 | ||
| 10. | For the barrio school of Banaybanay 2º, San Jose | 2,500.00 | ||
| ———— | ||||
| Total | 28,500.00 | |||
| ======= | ||||
| BOHOL | ||||
| 1. | For the Cortes Central School | 8,000.00 | ||
| 2. | For the Bungahan school, Antequera | 2,000.00 | ||
| 3. | For the Biking school, Dauis | 2,000.00 | ||
| 4. | For the Nueva Vida Elementary School, Carmen | 1,000.00 | ||
| 5. | For the Buenos Aires Elementary School, Carmen | P1,000.00 | ||
| 6. | For the Villarcayo Elementary School, Carmen | 1,000.00 | ||
| 7. | For the Sevilla Elementary School | 2,000.00 | ||
| 8. | For the Triple Union Elementary School, Loboc | 1,000.00 | ||
| 9. | For the Calunasan Norte Elementary School, Loboc | 1,000.00 | ||
| 10. | For the Canlimpong Elementary School, Alburquerque | 1,000.00 | ||
| 11. | For the Boncocan Elementary School, Lila | 1,000.00 | ||
| 12. | For the Cogon-Malinao Elementary School, Lila | 1,000.00 | ||
| 13. | For the Datag Elementary School, Balilihan | 1,000.00 | ||
| 14. | For the Campagao Elementary School | 1,000.00 | ||
| 15. | For the Naatang school, Jagna | 2,000.00 | ||
| 16. | For the Guinsulasan school, Duero | 2,000.00 | ||
| 17. | For the Cayan school, Garcia-Hernandez | 1,000.00 | ||
| 18. | For the Aguining school, Ubay | 1,000.00 | ||
| 19. | For the Cansiwang school, Guindulman | 1,000.00 | ||
| 20. | For the Danicop school, Sierra-Bullones | 1,000.00 | ||
| 21. | For the La Hacienda school, Mabini | 1,000.00 | ||
| 22. | For the Banlas school, Mabini | 1,000.00 | ||
| 23. | For the Tambo school, Mabini | 1,000.00 | ||
| 24. | For the Linawan school, Anda | 1,000.00 | ||
| 25. | For the Guindulman Home Economics Building | 4,000.00 | ||
| 26. | For the Tagbilaran Central School Building | 4,000.00 | ||
| 27. | For the Dimiao Home Economics | 3,000.00 | ||
| 28. | For the primary school, Barrio Katugasan, Dimiao, Bohol | 2,000.00 | ||
| 29. | For the extension of Loay Intermediate School | 4,000.00 | ||
| 30. | For one barrio school, Tocdog, Loay, Bohol | 6,000.00 | ||
| 31. | For one barrio school, Las Salinas, Loay, Bohol | 3,000.00 | ||
| 32. | For the Limuson school, Dimiao | 1,000.00 | ||
| ———— | ||||
| Total | 63,000.00 | |||
| ======= | ||||
| BULACAN | ||||
| 1. | For the Pandi school, Bigaa | 3,000.00 | ||
| 2. | For the Iba and San Isidro schools, Hagonoy | 1,000.00 | ||
| 3. | For the Santa Lucia school, Calumpit | 1,000.00 | ||
| 4. | For the Dampol Segundo school, Pulilan | 1,500.00 | ||
| 5. | For the Dampol school, Quingua | 1,500.00 | ||
| 6. | For the San Pedro School, Bustos | 2,500.00 | ||
| 7. | For the Polo Central School | 2,000.00 | ||
| 8. | For the Calvario school, Meycawayan | 2,000.00 | ||
| 9. | For the Baliwag Central School | 4,000.00 | ||
| 10. | For the Laog school, Angat | 1,500.00 | ||
| 11. | For the Pitpitan barrio school, Bulacan | P2,500.00 | ||
| 12. | For the construction of Sabang barrio school, Baliwag | 1,000.00 | ||
| 13. | For the construction of the Tilapayong barrio | |||
| school, Baliwag | 2,000.00 | |||
| 14. | For the construction of additional rooms, Santa Isabel | |||
| Intermediate School, Malolos | 2,500.00 | |||
| 15. | For the construction of Hanga Barrio Elementary | |||
| School, Hagonoy | 2,500.00 | |||
| 16. | For the repair and maintenance of a schoolhouse in the | |||
| barrio of San Jose, Calumpit | 3,000.00 | |||
| 17. | For the Paombong Central School | 2,000.00 | ||
| ———— | ||||
| Total | 34,500.00 | |||
| ======= | ||||
| CAGAYAN | ||||
| 1. | Annafunan Primary School, Tuguegarao | 3,500.00 | ||
| 2. | Cataggamman Primary School, Tuguegarao | 1,000.00 | ||
| 3. | Libag Primary School, Tuguegarao | 1,000.00 | ||
| 4. | Dodan Primary School, Peñablanca | 1,000.00 | ||
| 5. | Iguig Home Economics Building, Iguig | 2,000.00 | ||
| 6. | Pacac Primary School, Amulung | 1,500.00 | ||
| 7. | Baybayog Primary School, Alcala | 1,000.00 | ||
| 8. | Baquilao Primary School, Alcala | 1,000.00 | ||
| 9. | Afusing Primary School, Alcala | 1,000.00 | ||
| 10. | Cattaran Central School, Gattaran | 1,500.00 | ||
| 11. | Bagumbayan Primary School, Lalloc | 2,000.00 | ||
| 12. | Ziminila Primary School, Camalaniugan | 1,500.00 | ||
| 13. | Aparri Central School, Aparri | 3,000.00 | ||
| 14. | Buguey Central School, Buguey | 2,000.00 | ||
| 15. | Marede Primary School, Gonzaga | 1,000.00 | ||
| 16. | Palauig Primary School, Gonzaga | 1,000.00 | ||
| 17. | Mungo school, Tuao | 2,500.00 | ||
| 18. | Andarayan school, Solana | 3,000.00 | ||
| 10. | Namuccayan school, Faire | 2,500.00 | ||
| 20. | Sanchez-Mira school, Sanchez-Mira | 1,500.00 | ||
| 21. | Ballesteros school, Ballesteros | 1,500.00 | ||
| 22. | Piat Home Economics Building, Piat | 2,000.00 | ||
| 23. | San Jose Primary School, Baggao | 1,500.00 | ||
| ———— | ||||
| Total | 39,500.00 | |||
| ======= | ||||
| CAMARINES NORTE | ||||
| 1. | For the Indan Elementary School | 3,000.00 | ||
| ———— | ||||
| Total | 3,000.00 | |||
| ======= | ||||
| CAMARINES SUR | ||||
| 1. | For the construction, of Maagnas barrio school, Lagonoy | 1,500.00 | ||
| 2. | For the Sabang Barrio Elementary School, Naga | 7,500.00 | ||
| 3. | For the San Gabriel-San Isidro Barrio Elementary | |||
| School, Pamplona | P2,500.00 | |||
| 4. | For the Bical school, Libmanan | 1,000.00 | ||
| 5. | For the Palangon school, Libmanan | 1,000.00 | ||
| 6. | For the Hoyonhoyon Elementary School, Tigaon | 5,000.00 | ||
| 7. | For the construction of Fundado barrio school, Libmanan | 1,500.00 | ||
| 8. | For the construction of Dahat barrio school, Lagonoy | 1,500.00 | ||
| 9. | For the completion of Sagnay Domestic Science | |||
| School, Sagnay | 2,500.00 | |||
| 10. | For the construction of Danawin barrio school, Ragay | 3,000.00 | ||
| 11. | For the construction of Magñiring barrio school, | |||
| Calabanga | 1,500.00 | |||
| 12. | For the construction of Guihalo barrio school, Caramoan | 1,500.00 | ||
| 13. | For the Bonbon school, Magarao | 1,000.00 | ||
| ———— | ||||
| Total | 31,000.00 | |||
| ======= | ||||
| CAPIZ | ||||
| 1. | For the completion of Rizal Elementary School, | |||
| Pontevedra | 6,000.00 | |||
| 2. | For the Santa Cruz Elementary School, Dumalag | 1,000.00 | ||
| 3. | For the Candelaria Elementary School, Tapaz | 1,000.00 | ||
| 4. | For the Agbalo Elementary School, Panay | 4,000.00 | ||
| 5. | For the Ilaya Elementary School, Capiz | 6,000.00 | ||
| 6. | For the Mangoso Elementary School, Sigma | 1,000.00 | ||
| 7. | For the Bilao Elementary School, Sapian | 1,500.00 | ||
| 8. | For the Ochando Elementary School, New Washington | 1,500.00 | ||
| 9. | For the Caidquid Elementary School, Mambusao | 1,000.00 | ||
| 10. | For the Linabuan Elementary School, Banga | 1,000.00 | ||
| 11. | For the Linayasan Elementary School, Altavas | 1,000.00 | ||
| 12. | For the San Ramon school, Malinao | 1,500.00 | ||
| 13. | For the San Roque school, Malinao | 1,500.00 | ||
| 14. | For the Gibong school, Navas | 1,000.00 | ||
| 15. | For the Camanci Norte school, Numancia | 1,000.00 | ||
| 16. | For the Macato Central School | 3,000.00 | ||
| 17. | For the Santander school, Buruanga | 1,000.00 | ||
| 18. | For the Alaminos school, Libacao | 1,000.00 | ||
| 19. | For the Estancia school, Calibo | 1,000.00 | ||
| 20. | For the Albasan school, Numancia | 1,000.00 | ||
| ———— | ||||
| Total | 37,000.00 | |||
| ======= | ||||
| CAVITE | ||||
| 1. | Naic Shop and Home Economics Building | P2,500.00 | ||
| 2. | Kawit Home Economics Building | 2,500.00 | ||
| 3. | Rosario School Building | 2,500.00 | ||
| 4. | Indang Domestic Science School | 3,000.00 | ||
| –––––––––– | ||||
| Total | 10,500.00 | |||
| ======== | ||||
| CEBU | ||||
| 1. | For the Cogon Primary School, Carmen | 3,000.00 | ||
| 2. | For the Tabogon Intermediate School | 2,500.00 | ||
| 3. | For the Tabonoc Primary School, Sogod | 2,500.00 | ||
| 4. | For the Daan Catmon school | 2,000.00 | ||
| 5. | For the Ginakot school, Danao | 2,000.00 | ||
| 6. | For the Subangdaku school, Mandawe | 5,500.00 | ||
| 7. | For the Tayud Elementary School, Liloan | 5,500.00 | ||
| 8. | For the Opaw Elementary School, Mandawe | 2,500.00 | ||
| 9. | For the Garing Elementary School, Consolacion | 2,500.00 | ||
| 10. | For the Compostela Home Economics Building | 3,000.00 | ||
| 11. | For the Cordoba Home Economics Building | 1,000.00 | ||
| 12. | For the Carcar Elementary School | 4,000.00 | ||
| 13. | For the Balud Elementary School, San Fernando | 5,000.00 | ||
| 14. | For the Pandan Elementary School, Naga | 5,000.00 | ||
| 15. | For the Tubud school, Minglanilla | 3,000.00 | ||
| 16. | For the Mohon school, Talisay | 5,000.00 | ||
| 17. | For the Mangyan school, Sibonga | 3,500.00 | ||
| 18. | For the Tubod school, Sibonga | 3,500.00 | ||
| 19. | For the Moalbual school | 4,200.00 | ||
| 20. | For the Valencia school, Alegria | 3,000.00 | ||
| 21. | For the Malabuyoc school | 3,500.00 | ||
| 22. | For the Suba school, Samboan | 3,000.00 | ||
| 23. | For the Alo school, Oslob | 3,000.00 | ||
| 24. | For the Ginatilan Elementary School | 3,500.00 | ||
| 25. | For the Dakit school, Barili | 3,000.00 | ||
| 26. | For the Mantayupan school, Barili | 2,500.00 | ||
| 27. | For the Cabcaban school, Barili | 2,000.00 | ||
| 28. | For the Cogon school, Dumanjug | 2,500.00 | ||
| 29. | For the Pawa school, Dumanjug | 2,500.00 | ||
| 30. | For the Medellin Elementary School | 3,000.00 | ||
| 31. | For the Bantayan Elementary School | 4,000.00 | ||
| 32. | For the Balamban Elementary School | 4,000.00 | ||
| 33. | For the Asturias Home Economics Building | 3,000.00 | ||
| 34. | For the Bunacan Central School, Madridejos | 2,000.00 | ||
| 35. | For the Alcoy Elementary School | 1,500.00 | ||
| 36. | For the Camposong Elementary School, Borbon | 3,000.00 | ||
| 37. | For the Saksak Elementary School, Dalaguete | 3,000.00 | ||
| 38. | For the Obo Elementary School, Dalaguete | P2,000.00 | ||
| 39. | For the Apo Elementary School, Argao | 1,500.00 | ||
| 40. | For the Banhigan Elementary School, Badian | 2,000.00 | ||
| 41. | For the Pinamungajan Central School | 2,500.00 | ||
| 42. | For the Ronda Elementary School | 2,500.00 | ||
| 43. | For the Matab-ang Elementary School, Toledo | 2,500.00 | ||
| 44. | For the Colonia Elementary School, Tuburan | 2,000.00 | ||
| ————— | ||||
| Total | 132,200.00 | |||
| ========= | ||||
| DAVAO | ||||
| 1. | For the Mulig Elementary School | 3,000.00 | ||
| ———— | ||||
| Total | 3,000.00 | |||
| ======= | ||||
| ILOCOS NORTE | ||||
| 1. | For the Home Economics and Shop Buildings of Bacara | 5,000.00 | ||
| 2. | For the Home Economics Building of Sarrat | 1,000.00 | ||
| 3. | For the Cabisculan school, Vintar | 500.00 | ||
| 4. | For the Lubnao school, Vintar | 500.00 | ||
| 5. | For the Ballas school, Vintar | 1,000.00 | ||
| 6. | For the Salpad school, Vintar | 1,000.00 | ||
| 7. | For the Burgos Central School | 1,000.00 | ||
| 8. | For the San Mateo school, Lacag | 1,000.00 | ||
| 9. | For the Bamban school, Bangui | 1,000.00 | ||
| 10. | For the Caestebanan school, Banna | 1,500.00 | ||
| 11. | For the Bangasan school, Banna | 1,500.00 | ||
| 12. | For the Bomitog school, Banna | 1,000.00 | ||
| 13. | For the Suyo school, Dingras | 1,000.00 | ||
| 14. | For the Bimmanga school, Currimao | 1,000.00 | ||
| 15. | For the Bagbag school, Solsona | 2,000.00 | ||
| 16. | For the Lipay school, Solsona | 1,000.00 | ||
| 17. | For the Darasdas school, Solsona | 1,000.00 | ||
| 18. | For the Nueva Era Central School | 2,000.00 | ||
| 19. | Home Economics Building, Currimao | 1,000.00 | ||
| 20. | Caraitan school, Badoc | 1,000.00 | ||
| 21. | For the Pugaoen school, Pinili | 1,000.00 | ||
| 22. | For the Santa Cruz school, Badoc | 1,000.00 | ||
| 23. | For the Binaratan school, Sarrat | 1,500.00 | ||
| 24. | For the Pagatpat barrio school, Sarrat | 1,000.00 | ||
| 25. | For the Pagudpud barrio school, Bangui | 1,000.00 | ||
| 26. | For the Marong barrio school, Badoc | 1,000.00 | ||
| 27. | For the Binacay barrio school, Banna | 1,000.00 | ||
| 28. | For the Salbang barrio school, Paoay | 1,000.00 | ||
| 29. | For the Babay barrio school, Pasuquin | 1,000.00 | ||
| ———— | ||||
| Total | 35,500.00 | |||
| ======= | ||||
| ILOCOS SUR | ||||
| 1. | For the completion of the barrio school at Bulala, Vigan | 2,000.00 | ||
| 2. | For the Santa Intermediate School | P3,000.00 | ||
| 3. | For the San Pedro Elementary School, Narvacan | 2,000.00 | ||
| 4. | For the San Esteban Elementary School | 2,000.00 | ||
| 5. | For the Olo-olo Elementary School, Santiago | 2,000.00 | ||
| 6. | For the Tamurong Intermediate School, Candon | 3,000.00 | ||
| 7. | For the Elementary School of Naguimba, Banayoyo | 1,000.00 | ||
| 8. | For the completion of the barrio school at | |||
| Nagsangalan, Vigan | 1,000.00 | |||
| 9. | For the completion of the barrio school at Paratong, | |||
| Santa Catalina | 1,000.00 | |||
| 10. | For the completion of the barrio school at | |||
| Callaguip, Caoayan | 1,000.00 | |||
| 11. | For the Gabao barrio school, Santiago | 3,000.00 | ||
| 12. | For the Puro barrio school, Caoayan | 2,000.00 | ||
| 13. | For the Lapting barrio school, Lapog | 2,000.00 | ||
| 14. | Completion of Sinait Central School, Sinait | 3,000.00 | ||
| 15. | For the Domestic Science Building, San Esteban | 2,000.00 | ||
| ———— | ||||
| Total | 30,000.00 | |||
| ======= | ||||
| ILOILO | ||||
| 1. | For the Balusan school | 3,000.00 | ||
| 2. | For the Cabanbanan and Butong schools, Oton | 4,000.00 | ||
| 3. | For the Partition school, Guimbal | 4,000.00 | ||
| 4. | For the Aguiawan school, Miagao | 4,000.00 | ||
| 5. | For the Pitogo school, San Joaquin | 4,000.00 | ||
| 6. | For the Igtalongon school, Igbaras | 4,000.00 | ||
| 7. | For the Atabayan-Barroc school, Tigbaman | 3,000.00 | ||
| 8. | For the Jordan Central School | 5,000.00 | ||
| 9. | For the Aguilar Elementary School, Jordan | 4,000.00 | ||
| 10. | For the Umilig Elementary School, Buenavista | 3,000.00 | ||
| 11. | For the Estancia Intermediate School | 10,000.00 | ||
| 12. | For the Culasi Primary School, Ajuy | 5,000.00 | ||
| 13. | For the Bagacay Primary School, San Dionisio | 2,500.00 | ||
| 14. | For the Janiuay Elementary School | 3,000.00 | ||
| ———— | ||||
| Total | 58,500.00 | |||
| ======= | ||||
| ISABELA | ||||
| 1. | For the Santo Tomas school, Cabagan | 3,000.00 | ||
| 2. | For the Palanan Elementary School | 2,000.00 | ||
| 3. | For the Naguillian Elementary School | 3,000.00 | ||
| 4. | For the Naguillian Home Economics Building | 1,000.00 | ||
| 5. | For the Ipil Primary School, Echague | 2,000.00 | ||
| 6. | For the Lullutan Primary School, Ilagan | 2,000.00 | ||
| 7. | For the San Mariano Central School, San Mariano | P4,000.00 | ||
| ———— | ||||
| Total | 17,000.00 | |||
| ======= | ||||
| LAGUNA | ||||
| 1. | For the Malaban school, Biñan | 5,000.00 | ||
| 2. | For the San Ildefonso school, Alaminos | 3,500.00 | ||
| 3. | For the Linga school, Pila | 4,000.00 | ||
| 4. | For the San Cristobal school, San Pablo | 2,000.00 | ||
| 5. | For the San Juan Elementary School, Longos | 3,000.00 | ||
| 6. | For the Siniloan Elementary School | 3,000.00 | ||
| 7. | For the Fanny Elementary School | 2,000.00 | ||
| 8. | For the Mabitac Elementary School | 2,000.00 | ||
| 9. | For the Patimbao Elementary School, Santa Cruz | 2,000.00 | ||
| 10. | For the Lumban Elementary School | 2,000.00 | ||
| 11. | For the Nanhaya Elementary School, Pila | 1,500.00 | ||
| 12. | For the San Roque Elementary School, Pila | 1,500.00 | ||
| 13. | For the completion of the barrio Layug school, Cavinti | 1,500.00 | ||
| 14. | For the completion of the San Roque and San Rafael | |||
| schools, Luisiana | 1,500.00 | |||
| 15. | For the completion of Plaridel school, Banago, | |||
| Nagcarlang | 1,500.00 | |||
| 16. | For an additional room in Lilio school | 3,000.00 | ||
| 17. | For an additional room in Pangil school | 2,000.00 | ||
| 18. | For the Duhat school, Santa Cruz | 1,500.00 | ||
| 19. | For the Taytay barrio school, Majayjay | 1,000.00 | ||
| ———— | ||||
| Total | 43,500.00 | |||
| ======= | ||||
| LA UNION | ||||
| 1. | For the Llones Elementary School, Tubao | 2,000.00 | ||
| 2. | For the Santa Lucia Elementary School | 2,000.00 | ||
| 3. | For the San Eugenio Elementary School, Aringay | 2,000.00 | ||
| 4. | For the Cubal Elementary School, Agoo | 4,000.00 | ||
| 5. | For the San Fermin Elementary School, Caba | 2,000.00 | ||
| 6. | For the Bacnotan Home Economics Building | 3,000.00 | ||
| 7. | For the elementary school of Masupe, Balaoan | 1,000.00 | ||
| 8. | For the elementary school of Masicong, San Fernando | 1,000.00 | ||
| 9. | For the completion of the elementary school of | |||
| Santiago, Bauang | 2,000.00 | |||
| 10. | For the completion of the elementary school, | |||
| Udiao, Rosario | 2,000.00 | |||
| 11. | For the barrio school of Salincob, Bacnotan | 1,000.00 | ||
| 12. | For the barrio school of Bangaoilan, Bangar | P2,000.00 | ||
| 13. | For the barrio school of Sinapangan, Balaoan | 1,000.00 | ||
| 14. | For the barrio school of Tanquigan, San Fernando | 1,000.00 | ||
| ———— | ||||
| Total | 26,000.00 | |||
| ======= | ||||
| LEYTE | ||||
| 1. | For the Hindang Domestic Science School | 3,500.00 | ||
| 2. | For the Bato Elementary School | 2,500.00 | ||
| 3. | For the Agay-ay school, Cabalian | 3,000.00 | ||
| 4. | For the Paco school, Sogod | 3,000.00 | ||
| 5. | For the San Joaquin school, Macrohon | 2,500.00 | ||
| 6. | For the Flor-deliz school, Macrohon | 2,500.00 | ||
| 7. | For the Tolosa Central School | 2,000.00 | ||
| 8. | For the San Jose Elementary School, Tacloban | 2,500.00 | ||
| 9. | For the Tarragona Elementary School, Abuyog | 2,500.00 | ||
| 10. | For the San Jose Elementary School, Dulag | 1,000.00 | ||
| 11. | For the Rizal Elementary School, Dulag | 1,000.00 | ||
| 12. | For the Domestic Science School, Abuyog | 1,000.00 | ||
| 13. | For the elementary school, Puerto Bello Merida | 2,000.00 | ||
| 14. | For the elementary school, Daja, San Isidro | 1,000.00 | ||
| 15. | For the Matalom school | 2,000.00 | ||
| ———— | ||||
| Total | 32,000.00 | |||
| ======= | ||||
| MANILA | ||||
| 1. | For the Gagalangin Elementary School | 8,000.00 | ||
| 2. | For the Santa Clara Primary School | 8,000.00 | ||
| ———— | ||||
| Total | 16,000.00 | |||
| ======= | ||||
| MARINDUQUE | ||||
| 1. | For the Bitik School, Santa Cruz | 3,000.00 | ||
| 2. | For the Dayquitin Barrio School, Buenavista | 500.00 | ||
| ———— | ||||
| Total | 3,500.00 | |||
| ======= | ||||
| MASBATE | ||||
| 1. | For the Daragat Elementary School, Cataingan | 2,000.00 | ||
| 2. | For the Placer Elementary School, Cataingan | 1,500.00 | ||
| 3. | For the San Agustin Elementary School, Aroroy | 1,500.00 | ||
| 4. | For the Hintutulo Elementary School, Milagros | P1,000.00 | ||
| 5. | For the Pulanduta Elementary School, Milagros | 1,000.00 | ||
| ———— | ||||
| Total | 7,000.00 | |||
| ======= | ||||
| MINDORO | ||||
| 1. | For the barrio Lumangbayan school, Pinamalayan | 2,000.00 | ||
| 2. | For the Paluan School, including the purchase of land | 3,000.00 | ||
| 3. | For the Sabang school, Puerto Galera | 2,000.00 | ||
| 4. | For the Santa Cruz school, Mamburao | 2,000.00 | ||
| 5. | For the San Agustin school, Naujan | 2,000.00 | ||
| 6. | For the Baco school | 1,500.00 | ||
| 7. | For the Vigo school, Lubang | 1,500.00 | ||
| 8. | For the San Jose school, Naujan | 2,000.00 | ||
| ———— | ||||
| Total | 16,000.00 | |||
| ======= | ||||
| NUEVA ECIJA | ||||
| 1. | For the Santa Barbara school, San Antonio | 1,000.00 | ||
| 2. | For the Bulrinon school, San Antonio | 2,500.00 | ||
| 3. | For the San Jose school, Talavera | 1,000.00 | ||
| 4. | For the Muñoz Primary and Intermediate School | 1,000.00 | ||
| 5. | For the Maturanoc-Faigal school, Guimba | 1,000.00 | ||
| 6. | For the Santo Tomas school, Aliaga | 1,500.00 | ||
| 7. | For the Zaragoza Central School | 1,000.00 | ||
| 8. | For the Sinipit school, Cabiao | 3,000.00 | ||
| 9. | For the Pambuan school, Gapan | 3,000.00 | ||
| 10. | For the Pulo school, San Isidro | 1,000.00 | ||
| 11. | For the Cenizahan school, Peñaranda | 3,000.00 | ||
| 12. | For the Papaya Central School | 4,000.00 | ||
| 13. | For the Cabanatuan Elementary School | 7,000.00 | ||
| ———— | ||||
| Total | 30,000.00 | |||
| ======= | ||||
| NUEVA VIZCAYA | ||||
| 1. | For the Bayombong Domestic Science School | 2,000.00 | ||
| 2. | For the Aritao Central School | 2,000.00 | ||
| ———— | ||||
| Total | 4,000.00 | |||
| ======= | ||||
| OCCIDENTAL MISAMIS | ||||
| 1. | For the Malaubang school, Misamis | 2,500.00 | ||
| 2. | For the Tipan Elementary School, Jimenez | 2,500.00 | ||
| 3. | For the Culpan Elementary School, Aloran | 2,500.00 | ||
| 4. | For the Sinian Elementary School, Baliangao | P2,500.00 | ||
| 5. | For the Lupagan Elementary School, Baliangao | 2,000.00 | ||
| 6. | For the Panaon Elementary School, Jimenez | 1,000.00 | ||
| 7. | Oroquieta Elementary School Building, construction of | |||
| additional room | 3,000.00 | |||
| 8. | Tudela School Building, construction of additional wing | 2,000.00 | ||
| 9. | For one barrio school Kinangay, Clarin | 4,000.00 | ||
| 10. | For the extension of Pines School, Oroquieta | 2,000.00 | ||
| 11. | For one home economics school, Oroquieta | 1,000.00 | ||
| ———— | ||||
| Total | 25,000.00 | |||
| ======= | ||||
| ORIENTAL MISAMIS | ||||
| 1. | For the Baliñguan Elementary School, Talisayan | 2,500.00 | ||
| 2. | For the San Martin Elementary School, Tagoloan | 2,500.00 | ||
| ———— | ||||
| Total | 5,000.00 | |||
| ======= | ||||
| OCCIDENTAL NEGROS | ||||
| 1. | For the Sarabia Elementary School | 2,500.00 | ||
| 2. | For the Tanza Primary School | 2,500.00 | ||
| 3. | For the Victorias Elementary School | 10,000.00 | ||
| 4. | For the Sum-ag Elementary School, Bacolod | 6,000.00 | ||
| 5. | For the San Enrique Elementary School | 3,000.00 | ||
| 6. | For the Pulupandan Elementary School | 3,000.00 | ||
| 7. | For the Guintubhan school, Isabela | 3,000.00 | ||
| 8. | For the Aranda school, Hinigaran | 3,000.00 | ||
| 9. | For the Guinpana-an school, Isabela | 2,000.00 | ||
| 10. | For the Binalbagan school | 8,000.00 | ||
| 11. | Bagacay barrio school, Ginigaran | 2,000.00 | ||
| 12. | Isabela Central School | 6,000.00 | ||
| 13. | For additional rooms, Talaban Elementary | |||
| School, Himamaylan | 3,000.00 | |||
| 14. | For additional rooms, Pontevedra Elementary School | 3,000.00 | ||
| ———— | ||||
| Total | 57,000.00 | |||
| ======= | ||||
| ORIENTAL NEGROS | ||||
| 1. | For the Bulak barrio school, Dauin | 2,000.00 | ||
| 2. | For the Sibulan Elementary School | 2,000.00 | ||
| 3. | For the Ayungon school | 3,000.00 | ||
| 4. | For the Tanjay school | 3,000.00 | ||
| 5. | For the La Libertad school | 4,000.00 | ||
| 6. | For the Maria Elementary School, Siquijor | 5,000.00 | ||
| 7. | For the Bitaog Primary School, Talingting | P3,000.00 | ||
| 8. | For the Talingting Central School | 3,000.00 | ||
| 9. | For the Bacong Central School | 3,000.00 | ||
| ———— | ||||
| Total | 28,000.00 | |||
| ======= | ||||
| PALAWAN | ||||
| 1. | For the Coron Central School | 4,000.00 | ||
| 2. | For the Capunayan school, Cuyo | 1,500.00 | ||
| 3. | For the Linapacan school, Coron | 2,000.00 | ||
| 4. | For the Taytay Domestic Science School | 1,000.00 | ||
| 5. | For the Aborlan Elementary School | 1,500.00 | ||
| 6. | For the Cuyo Domestic Science School | 1,000.00 | ||
| 7. | For the Bacuit Domestic Science School | 1,000.00 | ||
| ———— | ||||
| Total | 12,000.00 | |||
| ======= | ||||
| PAMPANGA | ||||
| 1. | For the Batasan school, Macabebe | 2,500.00 | ||
| 2. | For the Caingin school, Masantol | 2,500.00 | ||
| 3. | For the Maquiapo school, Guagua | 2,000.00 | ||
| 4. | For the Diladila school, Santa Rita | 2,000.00 | ||
| 5. | For the Lubao Elementary School | 3,000.00 | ||
| 6. | For the San Matias Elementary School, San Fernando | 1,500.00 | ||
| 7. | For the San Fernando Carpentry School | 2,500.00 | ||
| 8. | For the Balutucan Elementary School, Magalang | 2,000.00 | ||
| 9. | For the Batasan Elementary School, Arayat | 2,000.00 | ||
| 10. | For the Calulut Elementary School, San Fernando | 2,500.00 | ||
| 11. | For the construction of elementary school, | |||
| barrio La Paz, San Simon | 3,000.00 | |||
| 12. | For one additional room to Minalin Elementary | |||
| School, Minalin | 2,000.00 | |||
| 13. | For one additional room, Apalit Intermediate | |||
| School, Apalit | 3,000.00 | |||
| 14. | For the construction of elementary school, barrio | |||
| Santo Tomas, Sexmoan | 2,000.00 | |||
| 15. | For one additional room, Betis Elementary School | 3,000.00 | ||
| 16. | For the construction of one additional room to Arayat | |||
| Central School, Arayat | 3,000.00 | |||
| ———— | ||||
| Total | 38,500.00 | |||
| ======= | ||||
| PANGASINAN | ||||
| 1. | For the San Juan Elementary School, Agno | 1,000.00 | ||
| 2. | For the Balinguit Elementary School, San Carlos | 1,000.00 | ||
| 3. | For the Pogo Elementary School, Dagupan | 4,000.00 | ||
| 4. | For the Bunu-an Boquig school, Dagupan | 2,000.00 | ||
| 5. | For the Linoc Elementary School, Binmaley | P4,000.00 | ||
| 6. | For the Nancasalan Elementary School, Mangatarem | 3,000.00 | ||
| 7. | For the Ano Elementary School, San Carlos | 2,000.00 | ||
| 8. | For the Salinap Elementary School, San Carlos | 2,000.00 | ||
| 9. | For the Wawa school, Bayambang | 2,000.00 | ||
| 10. | For the Carungay school, Bayambang | 1,000.00 | ||
| 11. | For the Pasima school, Malasiqui | 2,000.00 | ||
| 12. | For the Tuliao school, Santa Barbara | 2,000.00 | ||
| 13. | For the Banawang school, Santa Barbara | 1,000.00 | ||
| 14. | For the Malabago school, Calasiao | 2,000.00 | ||
| 15. | For the Macabitu school, Calasiao | 1,000.00 | ||
| 16. | For the Luyan school, Mapandan | 1,000.00 | ||
| 17. | For the Malabago school, Mangaldan | 2,000.00 | ||
| 18. | For the David school, Mangaldan | 1,000.00 | ||
| 19. | For the Sison Home Economics Building | 1,000.00 | ||
| 20. | For the Mabilao school, San Fabian | 2,000.00 | ||
| 21. | For the completion of the elementary school, barrio of | |||
| Zaragosa, Bolinao | 5,000.00 | |||
| 22. | For the completion of the elementary school, barrio | |||
| of Lipit, Manaoag | 2,000.00 | |||
| 23. | For the completion of the elementary school, barrio of | |||
| Santa Catalina, Binalonan | 1,000.00 | |||
| 24. | For the completion of the elementary school, barrio of | |||
| Sumabnit, Binalonan | 1,000.00 | |||
| 25. | For the completion of the elementary school, barrio of | |||
| San Felipe, Binalonan | 1,000.00 | |||
| 26. | For the completion of the barrio school building of | |||
| Bachelor, Natividad | 2,000.00 | |||
| 27. | For the completion and repair of the barrio school | |||
| building of Pindahan, Alcala | 1,000.00 | |||
| 28. | For the completion and repair of the school building of | |||
| San Pedro, Alcala | 1,000.00 | |||
| 29. | For the construction of a barrio school building of | |||
| Bersamin, Alcala | 1,000.00 | |||
| 30. | For the construction of a home economics building | |||
| in Bautista | 2,000.00 | |||
| 31. | For the completion of the barrio school building of | |||
| La Paz, Umingan | 2,000.00 | |||
| 32. | For the Bobonan Elementary School, Pozorrubio | 3,000.00 | ||
| 33. | For the Rosario Elementary School, Pozorrubio | 2,000.00 | ||
| 34. | For the Malasin school, Pozorrubio | 2,000.00 | ||
| 35. | For the Nangtangalan Elementary School, Pozorrubio | 1,500.00 | ||
| 36. | For the Nama Elementary School, Pozorrubio | 3,500.00 | ||
| 37. | For the Evangelista Elementary School, Umingan | 1,500.00 | ||
| 38. | For the carpentry school, San Quintin | 1,500.00 | ||
| 39. | For the Rizal Elementary School, Natividad | 1,000.00 | ||
| 40. | For the San Juan Elementary School, Agno | P1,000.00 | ||
| 41. | For the Pilar-Zamon School, Santa Maria | 1,000.00 | ||
| 42. | For the Polo Elementary School, Alaminos | 1,000.00 | ||
| 43. | For the Pilar Elementary School, Bolinao | 1,000.00 | ||
| 44. | For the Ilioilio Elementary School, Burgos | 1,000.00 | ||
| 45. For the Lisbong Elementary School, Lingayen | 1,000.00 | |||
| ———— | ||||
| Total | 78,000.00 | |||
| ======= | ||||
| RIZAL | ||||
| 1. | For the Angono school, Binangonan | 3,000.00 | ||
| 2. | For the Domestic Science school of Mandaluyong | 3,500.00 | ||
| 3. | For the additional room to the Elementary School of Pasay | 4,000.00 | ||
| 4. | For the Marikina Elementary School | 5,000.00 | ||
| 5. | For the San Isidro barrio school, Taytay | 2,500.00 | ||
| 6. | For the Teresa Home Economics Building | 2,000.00 | ||
| 7. | For the Alabang Domestic Science School, Muntinlupa | 2,500.00 | ||
| 8. | For the construction of a new school building, Cainta | 2,000.00 | ||
| 9. | For the Cupang school, Muntinlupa | 3,000.00 | ||
| 10. | For the Jolo school, Mandaluyong | 2,000.00 | ||
| 11. | For the San Francisco Del Monte School, San | |||
| Juan del Monte | 2,500.00 | |||
| 12. | For the Caloocan Domestic Science | 4,000.00 | ||
| 13. | For the Navotas Elementary School | 2,500.00 | ||
| 14. | For the schools of Ibaba and Panghulo, Malabon | 500.00 | ||
| 15. | For the Tinajeros school, Malabon | 500.00 | ||
| 16. | For the Bagumbayan school, Taguig | 1,000.00 | ||
| 17. | For the construction of Cardona Elementary School | 4,000.00 | ||
| 18. | For the completion of San Guillermo Primary | |||
| School, Morong | 2,000.00 | |||
| ———— | ||||
| Total | 46,500.00 | |||
| ======= | ||||
| SAMAR | ||||
| 1. | For the Lapinig and Bangon schools, Palapag | 2,000.00 | ||
| 2. | For the Burabud and Vigo schools, Laoang | 1,800.00 | ||
| 3. | For the Hibobullao, San Vicente and | |||
| San Miguel schools, Catubig | 3,500.00 | |||
| 4. | For the Bobon and Rosario schools, Bobon | 3,000.00 | ||
| 5. | For the Cervantes Sumuhi and Curry schools, Catarman | 3,000.00 | ||
| 6. | For the Borobaybay and Villa schools, Lavezares | 2,500.00 | ||
| 7. | For the Balocawe Elementary School, Almagro | P2,000.00 | ||
| 8. | For the Pinabacdao Elementary School, Calbiga | 3,000.00 | ||
| 9. | For the San Pelayo and Piñaplata Elementary | |||
| Schools, Gandara | 2,000.00 | |||
| 10. | For the Santa Rita Domestic Science School | 3,000.00 | ||
| 11. | For the San Isidro Elementary School, Zumarraga | 1,000.00 | ||
| 12. | For the Lamingao Elementary School, Villareal | 2,000.00 | ||
| 13. | Semi-permanent elementary school, Gasandig, Wright | 2,000.00 | ||
| 14. | Semi-permanent elementary school, Villahermosa, | |||
| Tarangnan | 1,000.00 | |||
| 15. | For the completion of the elementary school, Nouvilas | |||
| Oriental, Basey | 1,000.00 | |||
| 16. | For the Mag-ubay and Tarabucan schools, Oquendo | 3,000.00 | ||
| 17. | For the San Joaquin and Malaga schools, Tinambacan | 1,000.00 | ||
| 18. | For the Santa Margarita school | 3,000.00 | ||
| 19. | For the La Paz, Migara, Limarayon school, Calbayog | 2,000.00 | ||
| 20. | For the San Policarpo, Trinidad, and Nijaga schools, | |||
| Calbayog | 3,000.00 | |||
| 21. | For the Laoangan and Bantayan schools, Pambuhan | 1,000.00 | ||
| ———— | ||||
| Total | 45,800.00 | |||
| ======= | ||||
| SORSOGON | ||||
| 1. | For the construction of Caditaan barrio school, Magallanes | 3,000.00 | ||
| 2. | For the construction of Namo barrio school, Bulan | 1,500.00 | ||
| ———— | ||||
| Total | 4,500.00 | |||
| ======= | ||||
| SURIGAO | ||||
| 1. | For a new semipermanent school building at Loreto | |||
| (Poblacion) | 3,000.00 | |||
| 2. | For the Tago Intermediate School, Surigao | 8,000.00 | ||
| 3. | For the Bad-as barrio school, Placer | 2,000.00 | ||
| ———— | ||||
| Total | 13,000.00 | |||
| ======= | ||||
| TARLAC | ||||
| 1. | For the Bantog school, Victoria | 1,000.00 | ||
| 2. | For the Pitao Primary School, San Clemente | 2,000.00 | ||
| 3. | For the Surgui Primary School, Camiling | 2,000.00 | ||
| 4. | For the Pindangan Primary School, Camiling | 2,000.00 | ||
| 5. | For the Mapapandan school, Mayantoc | 2,000.00 | ||
| 6. | For the Borbotones Primary School, Santa Ignacia | P1,000.00 | ||
| 7. | For the Legaspi Primary School, San Manuel | 2,000.00 | ||
| 8. | For the Pance Primary School, Ramos | 1,000.00 | ||
| 9. | For the Buenavista Primary School, Pura | 1,000.00 | ||
| 10. | For the Magaspac Primary School, Gerona | 1,000.00 | ||
| 11. | For the Anao Intermediate School | 3,000.00 | ||
| 12. | For the Santa Rosa Primary School, Concepcion | 2,500.00 | ||
| 13. | For the Bana Primary School, Gerona | 1,000.00 | ||
| 14. | For the Bangcu school, Bamban | 2,000.00 | ||
| 15. | For the Manga school, Capas | 2,000.00 | ||
| 16. | For the San Bartolome school, Concepcion | 2,000.00 | ||
| 17. | For the Lomboy school, La Paz | 2,000.00 | ||
| 18. | For the Mangolago school, Victoria | 1,500.00 | ||
| 19. | For the Canarem school, Victoria | 1,500.00 | ||
| 20. | For the Sula school, Tarlac | 1,000.00 | ||
| 21. | For the Villa Aglipay school | 1,000.00 | ||
| ———— | ||||
| Total | 34,500.00 | |||
| ======= | ||||
| TAYABAS | ||||
| 1. | For the Infanta Elementary School | 3,000.00 | ||
| 2. | For the Polillo Elementary School | 3,000.00 | ||
| 3. | For the Sampaloc Elementary School | 3,000.00 | ||
| 4. | For the Mulanay Elementary School | 6,000.00 | ||
| 5. | For the Macalelco Elementary School | 3,000.00 | ||
| 6. | For the Catanauan Elementary School | 3,000.00 | ||
| 7. | For the Mauban Domestic Science School Building | 10,000.00 | ||
| 8. | For the Baler School Building | 2,000.00 | ||
| 9. | For the San Narciso School Building | 2,500.00 | ||
| 10 | For the Perez School Building | 2,500.00 | ||
| ———— | ||||
| Total | 38,000.00 | |||
| ======= | ||||
| ZAMBALES | ||||
| 1. | For the Castillejos Elementary School | 1,500.00 | ||
| 2. | For the Botolan Elementary School | 12,000.00 | ||
| 3. | For the Candelaria Elementary School | 1,500.00 | ||
| 4. | For the Guisguis school, Santa Cruz | 1,000.00 | ||
| 5. | For the Lauis school, Candelaria | 1.000.00 | ||
| 6. | For the Bolitoc school, Santa Cruz | 1,000.00 | ||
| ———— | ||||
| Total | 18,000.00 | |||
| ————— | ||||
| Grand total | 1,227,500.00 | |||
| ========= | ||||
| (f) | For the construction and completion of the following projects: | |||
| 1. | For the completion of the laboratory and office building | |||
| for the Bureau of Animal Industry, Pandacan, Manila | 31,000.00 | |||
| 2. | For the construction of a nurses' dormitory for the | |||
| Southern Islands Hospital, Cebu | P25,000.00 | |||
| 3. | For the construction of additional buildings for the | |||
| Culion Leper Colony | 4,000.00 | |||
| Provided, That the unexpended balance of the | ||||
| appropriation made in item (f-15), subsection (a), | ||||
| section 1 of Act 3460, is hereby made available for | ||||
| expenditure up to July 31, 1932, any provision of | ||||
| existing laws to the contrary notwithstanding. | ||||
| 4. | For the improvement of Rizal Park in Dapitan, | |||
| Zamboanga, including lighting, sewerage system of | ||||
| Dapitan Hospital | 2,000.00 | |||
| 5. | For the construction of a maternity building in | |||
| Urdaneta, Province of Pangasinan | 5,000.00 | |||
| ————––– | ||||
| Total | 67,000.00 | |||
| ––––––––––– | ||||
| Total available for the construction, improvement, | ||||
| alteration, repair and maintenance of public buildings | ||||
| and other unclassified projects | 1,773,500.00 | |||
| ========= | ||||
| B. | INVESTIGATION, CONSTRUCTION AND MAINTENANCE OF ROADS | |||
| AND BRIDGES | ||||
| (g) | For the maintenance and improvement of the Kennon | |||
| and Naguilian roads, subprovince of Benguet, and the | ||||
| road from Camp One to Damortis, Province of La Union: | ||||
| Provided, That the toll collection from Kennon road shall | ||||
| be expended for the improvement of said road, the | ||||
| provisions of existing laws to the contrary notwithstanding | 60,000.00 | |||
| (h) | For aid for the construction, maintenance, reconstruction, | |||
| and improvement of trails, roads, and bridges in the | ||||
| following special provinces, provided they comply with | ||||
| the provisions of section 2115 of Act No. 2711 and, by a | ||||
| resolution of the provincial board, guarantee by continuing | ||||
| annual appropriations the establishment of such a system | ||||
| of maintenance as may be necessary in the judgment of the | ||||
| Director of Public Works on all trails, roads, and bridges | ||||
| now constructed or which may be constructed in the future: | ||||
| 1. | Province of Agusan | 8,600.00 | ||
| 2. | Province of Bukidnon | 8,600.00 | ||
| 3. | Province of Cotabato | 8,600.00 | ||
| 4. | Province of Davao | P8,600.00 | ||
| 5. | Province of Lanao | 8,600.00 | ||
| 6. | Mountain Province: | |||
| a. | Subprovince of Apayao | 8,700.00 | ||
| b. | Subprovince of Benguet | 8,700.00 | ||
| c. | Subprovince of Bontoc | 8,700.00 | ||
| d. | Subprovince of Ifugao | 8,700.00 | ||
| e. | Subprovince of Kalinga | 8,700.00 | ||
| f. | Maintenance of Abra-Kalinga trail, Province of Abra | 8,700.00 | ||
| 7. | Province of Nueva Vizcaya | 8,700.00 | ||
| 8. | Province of Palawan | 8,700.00 | ||
| 9. | Province of Sulu | 8,700.00 | ||
| 10. | Province of Zamboanga | 8,700.00 | ||
| ————— | ||||
| Total | 130,000.00 | |||
| ========= | ||||
| (i) | For the investigation and survey of special road and | |||
| bridge projects to be designated by the Secretary of | ||||
| Commerce and Communications, including the purchase, | ||||
| operation and maintenance of test boring apparatus, | ||||
| Provided, That P5,000 of this amount shall be spent for | ||||
| the investigation and survey of the Capas, Tarlac Iba, | ||||
| Zambales interprovincial road | 15,000.00 | |||
| (j) | For experimental work in connection with the design and | |||
| construction of hard surface pavements | 10,000.00 | |||
| (k) | For aid for the construction and improvement of the | |||
| following special road projects in the provinces where such | ||||
| projects are situated and which comply with the provisions of | ||||
| section 2113 of Act No. 2711 and, by resolution of the | ||||
| provincial board, shall guarantee by continuing annual | ||||
| appropriations the establishment of such a system of | ||||
| maintenance as may be necessary in the judgment of the | ||||
| Director of Public Works, on all first-class roads now | ||||
| constructed or which may be constructed in the future | ||||
| and declared as such by the Director of Public Works: | ||||
| 1. | Bataan-Zambales interprovincial road: | |||
| a. | Province of Bataan | 15,000.00 | ||
| b. | Province of Zambales | 20,000.00 | ||
| 2. | Batangas-Cavite interprovincial road and bridges: | |||
| a. | Province of Batangas | 20,000.00 | ||
| b. | Province of Cavite | 20,000.00 | ||
| 3. | Baybay-Abuyog coast-to-coast road: | |||
| a. | Province of Leyte | 15,000.00 | ||
| 4. | Palompon-Ormoc-Carigara road: | |||
| a. | Province of Leyte | 5,000.00 | ||
| 5. | Cagayan Valley road and bridges: | |||
| a. | Province of Nueva Ecija | P20,000.00 | ||
| b. | Province of Nueva Vizcaya | 20,000.00 | ||
| c. | Province of Isabela | 20,000.00 | ||
| d. | Province of Cagayan | 20,000.00 | ||
| 6. | Cagayan-Mountain Province interprovincial road: | |||
| a. | Province of Cagayan | 20,000.00 | ||
| b. | Mountain Province | 10,000.00 | ||
| 7. | Calapan-Pinamalayan coast-to-coast road: | |||
| a. | Province of Mindoro | 6,000.00 | ||
| 8. | Tilik-Tagbag-Lubang road: | |||
| a. | Province of Mindoro | 10,000.00 | ||
| 9. | Camarines Norte-Camarines Sur interprovincial road: | |||
| a. | Province of Camarines Norte | 11,000.00 | ||
| b. | Province of Camarines Sur | 16,000.00 | ||
| 10. | Capiz-Antique interprovincial road: | |||
| a. | Province of Capiz (Ivisan-Banga section) | 15,000.00 | ||
| b. | Province of Antique (Pandan-Union section) | 5,000.00 | ||
| 11. | Capiz-Iloilo interprovincial road (Dumalag-Lambunao, | |||
| via Calinog): | ||||
| a. | Province of Capiz | 20,000.00 | ||
| b. | Province of Iloilo (Tapaz-Calinog section) | 10,000.00 | ||
| c. | Province of Iloilo (Balasan-Barotac Viejo section) | 10,000.00 | ||
| 12. | Catbalogan-Taft coast-to-coast road: | |||
| a. | Province of Samar | 20,000.00 | ||
| 13. | Cotabato-Lanao interprovincial road: | |||
| a. | Province of Lanao | 12,500.00 | ||
| b. | Province of Cotabato | 12,500.00 | ||
| 14. | Davao-Cotabato interprovincial road: | |||
| a. | Province of Davao | 12,000.00 | ||
| b. | Province of Cotabato | 12,000.00 | ||
| 15. | Ilocos Norte-Abra interprovincial road: | |||
| a. | Province of Abra | 8,000.00 | ||
| 16. | Ilocos Norte-Cagayan interprovincial road: | |||
| a. | Province of Ilocos Norte | 20,000.00 | ||
| b. | Province of Cagayan | 20,000.00 | ||
| 17. | Samar-Leyte interprovincial road (Calbiga, | |||
| Samar-Tacloban, Leyte section) | ||||
| a. | Province of Samar | 20,000.00 | ||
| 18. | Calbayog-Catarman coast-to-coast road: | |||
| a. | Province of Samar | 10,000.00 | ||
| 19. | Mountain Province-Nueva Vizcaya interprovincial | |||
| road (Banawe): | ||||
| a. | Mountain Province | 14,000.00 | ||
| 20. | Nueva Ecija-Tayabas interprovincial road (formerly | |||
| Bongabong-Baler trail): | ||||
| a. | Province of Nueva Ecija | 16,000.00 | ||
| b. | Province of Tayabas | 16,000.00 | ||
| 21. | Occidental Misamis Zamboanga interprovincial road | |||
| (Oroquieta-Dapitan): | ||||
| a. | Province of Occidental Misamis | P15,000.00 | ||
| b. | Province of Zamboanga | 15,000.00 | ||
| 22. | Oriental Misamis-Lanao interprovincial road: | |||
| a. | Province of Oriental Misamis | 20,000.00 | ||
| 23. | Oriental Negros-Occidental Negros interprovincial road: | |||
| a. | Province of Oriental Negros | |||
| (Guihulngan-Vallehermoso section) | 16,000.00 | |||
| b. | Province of Occidental Negros (Escalante- | |||
| Vallehermoso section) | 15,000.00 | |||
| 24. | Rizal-Laguna interprovincial road: | |||
| a. | Province of Rizal | 15,000.00 | ||
| b. | Province of Laguna | 15,000.00 | ||
| 25. | Tagudin-Bontoc interprovincial road: | |||
| a. | Province of Ilocos Sur | 20,000.00 | ||
| b. | Mountain Province | 10,000.00 | ||
| 26. | Tayabas-Camarines Norte interprovincial road: | |||
| a. | Province of Tayabas | 20,000.00 | ||
| b. | Province of Camarines Norte | 15,000.00 | ||
| 27. | Gumaca-Pitogo-Catanawan coast-to-coast road: | |||
| a. | Province of Tayabas | 20,000.00 | ||
| 28. | Zamboanga-Occidental Misamis interprovincial | |||
| (Pagadian-Misamis road): | ||||
| a. | Province of Zamboanga | 12,847.00 | ||
| b. | Province of Occidental Misamis | 12,500.00 | ||
| 29. | Agusan-Surigao interprovincial road (Alegria- | |||
| Tubod section): | ||||
| a. | Province of Surigao | 10,000.00 | ||
| 30. | Agusan-Oriental Misamis interprovincial road: | |||
| a. | Province of Oriental Misamis | 10,000.00 | ||
| 31. | Bukidnon-Oriental Misamis interprovincial road: | |||
| a. | Province of Bukidnon | 10,000.00 | ||
| 32. | Lugo-Tuburan (via Tabuelan) coast-to-coast road: | |||
| a. | Province of Cebu | 20,000.00 | ||
| 33. | Panganiran-Ligao coast-to-coast road: | |||
| a. | Province of Albay | 14,000.00 | ||
| 34. | Supang-Panganiban coast-to-coast road: | |||
| a. | Province of Albay | 8,000.00 | ||
| 35. | Manila-Rizal interprovincial road: (Tondo-Navotas section): | |||
| a. | Province of Rizal | 20,000.00 | ||
| 36. | Tayabas-Laguna interprovincial road: | |||
| a. | Province of Tayabas (Infanta-Famy section) | 3,000.00 | ||
| b. | Province of Laguna (Luisiana-Lucban section) | 8,000.00 | ||
| 37. | Bulacan-Nueva Ecija interprovincial road | |||
| (San Miguel-San Isidro section): | ||||
| a. | Province of Nueva Ecija | P5,000.00 | ||
| 38. | Camarines Sur-Albay interprovincial road | |||
| (Sañgay-Tiwi section): | ||||
| a. | Province of Camarines Sur | 9,000.00 | ||
| b. | Province of Albay | 9,000.00 | ||
| 39. | Pangasinan-Zambales interprovincial road | |||
| (Urbiztondo-Mangatarem Santa Cruz Section), | ||||
| Province of Pangasinan | 7,000.00 | |||
| 40. | Province of Sorsogon: | |||
| a. | Gate-Matnog road | 3,000.00 | ||
| b. | Prieto-Diaz road | 3,000.00 | ||
| c. | Siuton-Magallanes road | 4,000.00 | ||
| ————— | ||||
| Total | 865,347.00 | |||
| ========= | ||||
| (l) | For the construction, completion, reconstruction and | |||
| improvement of the following roads and bridges in the | ||||
| regularly organized provinces, provided they comply with | ||||
| the provisions of section 2113 of Act No. 2711, and, by | ||||
| resolution of the provincial board, guarantee by continuing | ||||
| annual appropriations the establishment of such a system of | ||||
| maintenance as may be necessary in the judgment of the | ||||
| Director of Public Works, on all first-class roads now | ||||
| constructed or which may be constructed in the future and | ||||
| declared as such by the Director of Public Works: | ||||
| ALBAY | ||||
| 1. | For the Bato-Baras road | 2,000.00 | ||
| 2. | For the Babay-Malinao road | 4,000.00 | ||
| 3. | For the Tiwi-Joroan roads | 4,000.00 | ||
| 4. | For the Camalig-Daraga (via Catmon-Gapo) road | 5,000.00 | ||
| 5. | For the Legaspi-Manito road | 4,000.00 | ||
| 6. | For the Mayon-Canaron road, Daraga | 4,000.00 | ||
| 7. | For the Polangui-Buhi road via Gotog | 10,000.00 | ||
| 8. | For the Calolbon-Codong road | 5,000.00 | ||
| ———— | ||||
| Total | 38,000.00 | |||
| ======= | ||||
| ANTIQUE | ||||
| 1. | For the San Jose south provincial road | |||
| (Dao-Anini-Casy section) | 2,000.00 | |||
| ======= | ||||
| BATANGAS | ||||
| 1. | For the Lian-Calatagan road | P3,000.00 | ||
| 2. | For the Bauan-Alitagtag (via barrio Ilat) road | 4,500.00 | ||
| 3. | For the Bolbok-Laiya road | 4,000.00 | ||
| ———— | ||||
| Total | 11,500.00 | |||
| ======= | ||||
| BULACAN | ||||
| 1. | For the construction of various small bridges in the | |||
| municipality of Paombong | 2,000.00 | |||
| 2. | For the construction of wooden bridge connecting | |||
| the barrio of Tabang, Guiguinto, and the barrio of | ||||
| Santol, Santa Isabel, Malolos | 1,500.00 | |||
| ———— | ||||
| Total | 3,500.00 | |||
| ======= | ||||
| CAMARINES SUR | ||||
| 1. | For the construction of road from Sagnay (poblacion), | |||
| via Iraya, to the Nato Port | 2,500.00 | |||
| 2. | For the construction of Magarao-Boro-baybay, | |||
| or Botonga, Magarao road | 2,000.00 | |||
| ———— | ||||
| Total | 4,500.00 | |||
| ======= | ||||
| CAPIZ | ||||
| 1. | For the Panay-Pontevedra road | 5,000.00 | ||
| 2. | For the completion of Panitan-Mainay-Sigma road | 20,000.00 | ||
| ———— | ||||
| Total | 25,000.00 | |||
| ======= | ||||
| CEBU | ||||
| 1. | For the Sibonga-Dumanjug coast-to-coast road | |||
| (Sibonga section) | 5,000.00 | |||
| 2. | For the Cayoan-Tabogon-Guadalupe-Bogo road | 2,000.00 | ||
| ———— | ||||
| Total | 7,000.00 | |||
| ======= | ||||
| ILOILO | ||||
| 1. | For the Barotac-Nuevo Talisay road | 4,000.00 | ||
| 2. | For the Alimodian-Maasin road | 2,000.00 | ||
| 3. | For the Leganes-Santa Barbara road, via Lapayan | 3,000.00 | ||
| 4. | For the continuation of the Pavis-Jibauan road | 6,000.00 | ||
| ———— | ||||
| Total | 15,000.00 | |||
| ======= | ||||
| LEYTE | ||||
| 1. | For the Palompon road, Valencia | P4,000.00 | ||
| 2. | For the Bato-Sogod road | 4,000.00 | ||
| 3. | For the Calubian-San Isidro road | 3,000.00 | ||
| 4. | For the Merida-Matlong road | 7,000.00 | ||
| 5. | For the Caibiran-Naval road | 3,500.00 | ||
| 6. | For the, Maripipi-Viga road | 3,500.00 | ||
| 7. | For the Carigara-Capoocan road | 9,000.00 | ||
| ———— | ||||
| Total | 34,000.00 | |||
| ======= | ||||
| MARINDUQUE | ||||
| 1. | For the Santa-Cruz Mogpog coast-to-coast road | 8,500.00 | ||
| 2. | For the Napo-Tauiran bridge, Santa Cruz | 3,000.00 | ||
| ———— | ||||
| Total | 11,500.00 | |||
| ======= | ||||
| MASBATE | ||||
| 1. | For the Masbate-Dimasalang road | 5,500.00 | ||
| 2. | For the Milagros-Aroroy road | 2,500.00 | ||
| ———— | ||||
| Total | 8,000.00 | |||
| ======= | ||||
| NUEVA ECIJA | ||||
| 1. | For the San Antonio-Jaen-Zaragoza road | 3,000.00 | ||
| ======= | ||||
| NUEVA VIZCAYA | ||||
| 1. | For the Aritao-Dupaz road | 2,000.00 | ||
| ======= | ||||
| ORIENTAL MISAMIS | ||||
| 1. | For the Bonbon-Agojo provincial road | 2,000.00 | ||
| 2. | For the Agojo-Bonbon coast-to-coast road, | |||
| Camiguin Island | 7,000.00 | |||
| ———— | ||||
| Total | 9,000.00 | |||
| ======= | ||||
| OCCIDENTAL NEGROS | ||||
| 1. | For the Madalag-Saravia road | 3,000.00 | ||
| ======= | ||||
| ORIENTAL NEGROS | ||||
| 1. | For the Tolon-Siaton road | 3,000.00 | ||
| ======= | ||||
| PALAWAN | ||||
| 1. | For the Igabas road, Cuyo | 2,000.00 | ||
| 2. | For the Coron-Busuanga road | 3,000.00 | ||
| ———— | ||||
| Total | 5,000.00 | |||
| ======= | ||||
| PAMPANGA | ||||
| 1. | For the San Fernando-Minalin road | 1,500.00 | ||
| ======= | ||||
| ROMBLON | ||||
| 1. | For the Lo-oc-Odiongan-Carmen road, Tablas Island | P8,000.00 | ||
| 2. | For the San Fernando-Magallanes road, Sibuyan Island | 5,000.00 | ||
| ———— | ||||
| Total | 13,000.00 | |||
| ======= | ||||
| SAMAR | ||||
| 1. | For the Tambacan-Calbayog road | 3,000.00 | ||
| 2. | For the Salcedo-Pambujan-Hernani road | 12,000.00 | ||
| 3. | For the Balangiga-Giporlos road | 5,000.00 | ||
| 4. | For the Dolores-Oras road | 3,000.00 | ||
| ———— | ||||
| Total | 23,000.00 | |||
| ======= | ||||
| SURIGAO | ||||
| 1. | For the Numancia-Dapa-General Luna road, | |||
| Surigao Island | 4,000.00 | |||
| ======= | ||||
| SORSOGON | ||||
| 1. | For the Gate-Matnog road | 7,000.00 | ||
| 2. | For the Bulan-San Francisco-Magallanes road | 4,000.00 | ||
| 3. | For the Prieto-Diaz-Gubat road | 4,000.00 | ||
| 4. | For the Baconsugod-Prieto-Diaz road | 4,000.00 | ||
| 5. | For the Putiao-Pilar road | 10,000.00 | ||
| 6. | For the Juban-Magallanes road | 4,000.00 | ||
| ———— | ||||
| Total | 33,000.00 | |||
| ======= | ||||
| TARLAC | ||||
| 1. | For the completion of the Concepcion-La Paz road | 10,000.00 | ||
| ======= | ||||
| TAYABAS | ||||
| 1. | For the Dolores, Tayabas-San Pablo, Laguna | |||
| interprovincial road (Dolores section): | 1,000.00 | |||
| 2. | For the Tayabas-Mainit road | 2,000.00 | ||
| ––––––––––– | ||||
| Total | 3,000.00 | |||
| ––––––––––– | ||||
| Grand total | 272,500.00 | |||
| ––––––––––– | ||||
| Total available for the investigation, construction, | ||||
| maintenance and improvement of roads and bridges | 1,352,847.00 | |||
| ========= | ||||
| C. | INVESTIGATION, CONSTRUCTION, AND MAINTENANCE OF | |||
| IRRIGATION SYSTEMS | ||||
| (ll) | For making preliminary investigations and surveys | |||
| of irrigation, water supply, and water power and river | ||||
| control projects | P20,000.00 | |||
| (m) | For gaging streams, including salaries of gagekeepers | 30,000.00 | ||
| Provided, That officers and employees of the Government | ||||
| may be appointed as gagekeepers and rain observers under | ||||
| these projects and may receive extra compensation therefor, | ||||
| in addition to what they receive as Government employees. | ||||
| And provided, further, That persons appointed as gagekeepers | ||||
| and rain observers under these projects who are not | ||||
| Government employees may be allowed to accept other | ||||
| Government employment, upon recommendation of the | ||||
| Director of Public Works, approved by the Secretary of | ||||
| Commerce and Communications, and may receive | ||||
| compensation therefor. | ||||
| (n) | For the investigation of applications for the use of water | |||
| for irrigation, water supply and water power projects, and | ||||
| for adjudication of water rights on streams designated | ||||
| by the Secretary of Commerce and Communications | 25,000.00 | |||
| (o) | For the maintenance and operation of the San Miguel | |||
| Irrigation System, Province of Tarlac | 4,000.00 | |||
| ———— | ||||
| Total available for the construction, maintenance and | ||||
| investigation of irrigation system | 79,000.00 | |||
| ======= | ||||
| D. | ARTESIAN WELLS AND WATERWORKS | |||
| (p) | For the drilling of artesian wells by the Bureau of Public | |||
| Works, including the purchase and maintenance of well- | ||||
| drilling equipment and expenses incurred in previous years | 130,000.00 | |||
| Provided, That funds shall be appropriated by the | ||||
| province or municipality concerned to cover one-third | ||||
| of the cost of each well requested before drilling operations | ||||
| are undertaken by the Bureau of Public Works, and that | ||||
| upon certification by the Director of Public Works of the | ||||
| cost of a well, the province or municipality concerned | ||||
| shall pay each share into the Insular Treasury: Provided, | ||||
| further, That any province or municipality, which, by virtue | ||||
| of the provisions of this Act, shall incur the expense of an | ||||
| artesian well resulting in a failure, shall have the amount | ||||
| expended reimbursed from this appropriation. | ||||
| (q) | For the construction of insular, provincial, and municipal | |||
| waterworks, drainage and sewer system projects, whenever | ||||
| the province or municipality concerned shall appropriate | ||||
| funds to cover the cost of one-third of the work prior to | ||||
| the release of the Insular aid authorized by this Act: | ||||
| Provided, That no municipality shall be entitled to receive | ||||
| more than P25,000 a year as aid: Provided, further, That in | ||||
| the case of a provincial or municipal project benefiting or | ||||
| covering two or more municipalities, each municipality | ||||
| concerned shall be entitled to said P25,000 aid: And provided, | ||||
| finally, That the sum of P10,000 shall be released for the | ||||
| construction of Bucay Waterworks, Abra, and P18,000 for | ||||
| the construction of the Bantayan Waterworks, Cebu, the | ||||
| above requirements notwithstanding; the sum of P25,000 | ||||
| shall be set aside for the construction of Malasiqui Waterworks, | ||||
| Pangasinan; the sum of P8,000 for the construction of Santa | ||||
| Maria Waterworks, Laguna; the sum of P12,000 for the | ||||
| extension of the waterworks system to the College of | ||||
| Agriculture at Los Baños, Laguna; the sum of P20,000 for | ||||
| the construction of Cabogao Waterworks, Ilocos Sur, and | ||||
| P25,000 for the construction of Narvacan Waterworks, | ||||
| Ilocos Sur | P350,000.00 | |||
| ————— | ||||
| Total available for artesian wells and waterworks | 480,000.00 | |||
| ========= | ||||
| E. | INVESTIGATION, CONSTITUTION AND IMPROVEMENT OF | |||
| PORT WORKS | ||||
| (r) | For the construction and improvement of port works, as follows: | |||
| 1. | Port of Legaspi, Albay | 85,000.00 | ||
| 2. | Port of Tabaco, Albay | 50,000.00 | ||
| 3. | Port of Batangas, Batangas | 20,000.00 | ||
| 4. | Port of Ivanna, Batanes | 5,000.00 | ||
| 5. | Port of Sabtang, Batanes | 2,000.00 | ||
| 6. | Port of Basco, Batanes | 5,000.00 | ||
| 7. | Port of Tagbilaran, Bohol | 10,000.00 | ||
| 8. | Port of Capiz, Capiz | 40,000.00 | ||
| 9. | Port of New Washington, Capiz | 20,000.00 | ||
| 10. | Port of Santa Fe, Bantayan Island, Cebu | 10,000.00 | ||
| 11. | Port of Opon, Cebu | 10,000.00 | ||
| 12. | Port of Cotabato, Cotabato | 30,000.00 | ||
| 13. | Port of Davao, Davao | 38,000.00 | ||
| 14. | Port of San Isidro, Leyte | P10,000.00 | ||
| 15. | Port of Appari, Cagayan | 40,000.00 | ||
| 16. | Port of Salvec, Narvacan, Ilocos Sur | 40,000.00 | ||
| 17. | Port of Cabugao, Ilocos Sur | 40,000.00 | ||
| 18. | Port of Tacloban, Leyte | 50,000.00 | ||
| 19. | Port of Maasin, Leyte | 10,000.00 | ||
| 20. | Port of Leyte, Leyte | 5,000.00 | ||
| 21. | Port of Iligan, Lanao | 10,000.00 | ||
| 22. | Port of Calapan, Mindoro | 20,000.00 | ||
| 23. | Port of Jimenez, Occidental Misamis | 25,000.00 | ||
| 24. | Port of Cagayan, Oriental Misamis | 20,000.00 | ||
| 25. | Port of Mambajao, Oriental Misamis | 30,000.00 | ||
| 26. | Naga Seawall, Cebu | 5,000.00 | ||
| 27. | Port of Pulupandan, Occidental Negros | 10,000.00 | ||
| 28. | Port of Dumaguete, Oriental Negros | 20,000.00 | ||
| 29. | Port of Lazi, Siquijor, Oriental Negros | 20,000.00 | ||
| 30. | Port of Coron, Palawan | 20,000.00 | ||
| 31. | Port of Cuyo, Palawan | 10,000.00 | ||
| 32. | Bacuit Wharf, Palawan | 5,000.00 | ||
| 33. | Navotas Seawall, Rizal | 5,000.00 | ||
| 34. | Port of Burongan, Samar | 40,000.00 | ||
| 35. | Port of Catbalogan, Samar | 20,000.00 | ||
| 36. | Port of Talalora, Samar | 20,000.00 | ||
| 37. | Port of Surigao, Surigao | 40,000.00 | ||
| 38. | Port of Jolo, Sulu | 10,000.00 | ||
| 39. | Port of Mauban, Tayabas | 30,000.00 | ||
| 40. | Atimonan Seawall, Tayabas | 20,000.00 | ||
| 41. | Port of Zamboanga, Zamboanga | 30,000.00 | ||
| 42. | Port of Pactoy-Odiongan (Tablas Island), Romblon | 10,000.00 | ||
| 43. | Sibonga Wharf, Cebu | 5,000.00 | ||
| Provided, That subject to the approval of the | ||||
| Secretary of Commerce and Communications and | ||||
| with such security as he may require, materials | ||||
| derived from dredging may be used for filling in | ||||
| private property at the request of any landowner | ||||
| upon the condition that the cost thereof shall be | ||||
| paid by the owner of the land in annual installments | ||||
| not to extend over more than five years: Provided, | ||||
| further, That payment of the claim of Madrigal Oil | ||||
| Company in the amount of P4,500 out of the "Port | ||||
| Works Fund" is hereby authorized and that in case | ||||
| of future marine accident caused by government- | ||||
| owned equipment, damages may be paid subject to | ||||
| the approval of the Secretary of Commerce and | ||||
| Communications; the total of such payments which | ||||
| shall not exceed P10,000, shall be paid out of the | ||||
| Port Works Fund. | ||||
| ————— | ||||
| Total | 975,000.00 | |||
| ========= | ||||
| (s) | For the investigation and survey of port works projects | |||
| and foreshore leases | P25,000.00 | |||
| ————— | ||||
| Total available for construction, improvement, and | ||||
| investigation of port works, to be paid out of the | ||||
| Port Works Fund under Act No. 3592 | 1,000,000.00 | |||
| ========= | ||||
| F. | RIVER CONTROL WORKS | |||
| (t) | For the construction, repair, and improvement of the | |||
| following river control works: | ||||
| 1. | For the construction, repair, and improvement of | |||
| Agno River control works, Province of Pangasinan | ||||
| including the filling and construction of the dams at | ||||
| Buling and Kirim gaps, San Carlos | 25,000.00 | |||
| 2. | For the construction, repair, and improvement of | |||
| Pampanga River and Sexmoan River control works, | ||||
| Province of Pampanga | 25,000.00 | |||
| 3. | For the construction of Clarin River control works, | |||
| Province of Occidental Misamis | 7,000.00 | |||
| 4. | For the improvement of the channel of the Angat | |||
| River, Province of Bulacan | 18,000.00 | |||
| 5. | For the construction of Dagami River Dyke, | |||
| Province of Leyte | 10,000.00 | |||
| 6. | For the construction of Hilongos River Dyke, | |||
| Province of Leyte | 10,000.00 | |||
| 7. | For the construction of Calumpang River Dyke, | |||
| Batangas, Batangas | 5,000.00 | |||
| 8. | For the dredging of Malolos River, Paombong River, | |||
| and Nagdasig River between Calumpit and Hagonoy, | ||||
| Province of Bulacan | 7,000.00 | |||
| 9. | For the San Isidro and Cabiao River Control Works, | |||
| Province of Nueva Ecija | 5,000.00 | |||
| 10. | For the Catarman River Dyke, Province of Samar | 5,000.00 | ||
| 11. | For the Calamay River Control Works, Dagupan, | |||
| Pangasinan | 5,000.00 | |||
| ————— | ||||
| Total available for River Control Works | 122,000.00 | |||
| ========= | ||||
| G. | MAINTENANCE, REPAIR, CONSTRUCTION, AND IMPROVEMENT | |||
| OF TELEGRAPH AND CABLE LINES AND RADIO STATIONS | ||||
| (u) | For the maintenance and repair of cables, telegraph lines | |||
| and radio stations | 155,000.00 | |||
| (v) | For the construction and improvement of telegraph and | |||
| cable lines and radio station: Provided, That the sum | ||||
| of P14,400 shall be expended for the installation of radio | ||||
| or telegraph stations at the municipalities of Sanchez- | ||||
| Mira and Faire, Cagayan | P80,000.00 | |||
| ————— | ||||
| Total available for the maintenance, repair, | ||||
| construction, and improvement of telegraph | ||||
| and cable lines and radio stations | 235,000.00 | |||
| ======== | ||||
| H. | MAINTENANCE, REPAIR, CONSTRUCTION, AND IMPROVEMENT | |||
| OF LIGHTHOUSES, BUOYS, AND BEACONS | ||||
| (w) | For the maintenance and repair of lighthouses, buoys, and | |||
| beacons, and for necessary repairs to lighthouse equipment | 150,000.00 | |||
| (x) | For the construction and improvement of lighthouses, | |||
| buoys, and other aids to navigation | 80,000 00 | |||
| ————— | ||||
| Total available for the maintenance, repair, | ||||
| construction, and improvement of lighthouses, | ||||
| buoys, and beacons | 230,000.00 | |||
| ========= | ||||
| Grand total of the appropriations made in this Act: | ||||
| FIVE MILLION, TWO HUNDRED SEVENTY- | ||||
| TWO THOUSAND, THREE HUNDRED AND | ||||
| FORTY-SEVEN PESOS | 5,272,347.00 | |||
| ========= |
SECTION 2. Item 5, paragraph (e), subsection A, section 1 of Act Numbered Thirty-eight hundred and thirteen for the Province of Oriental Negros, Public Works Act for nineteen hundred thirty-one, is hereby repealed and transferred to item 4, paragraph (e), subsection A, section 1, to read as follows: For the Larena Elementary School, Oriental Negros, fourteen thousand pesos (P14,000). AEDCHc
Items 3 and 4, paragraph (e), subsection A, section 1, for the Province of Occidental Misamis of Act Thirty-eight hundred and thirteen, known as the Public Works Act for nineteen hundred thirty-one, are hereby repealed and appropriated for the following school projects, to wit: For additional rooms to Oroquieta Elementary School, Occidental Misamis, three thousand pesos (P3,000); and for Oroquieta Home Economics Building, Occidental Misamis, four thousand pesos (P4,000). TIaCAc
SECTION 3. All balances of the several appropriations made by this Act the destination of which has not been determined by proper authority on December thirty-first, nineteen hundred and thirty-two, and all balances of appropriations remaining free or unexpended on July thirty-first, nineteen hundred and thirty-three, shall revert to the unappropriated funds in the Insular Treasury, and thereafter shall not be available for expenditure except upon appropriation by the Legislature.
SECTION 4. The sums appropriated in paragraphs (a), (i), (ll), (m), (u), (p), (q), (s), (u), (v), (w), and (x) shall be distributed in the discretion of the Secretary of Commerce and Communications, but those appropriated in the other paragraphs shall be available for immediate expenditure by the Director of Public Works: Provided, however, That in all construction works to be undertaken by the Government that require the use of cement, it shall be compulsory, the provisions of existing laws to the contrary notwithstanding, the use of cement manufactured by companies financed by the Government, except in those cases in which for reasons of cost, price and transportation, the use of other cement manufactured in the Philippines as verified by the Insular Auditor is more advantageous.
SECTION 5. This Act shall take effect on January first, nineteen hundred and thirty-two.
Approved, November 20, 1931, with the following exceptions: Section 1, paragraph (a): . . . P5,000 for the repair and upkeep of Laoag Normal School, Ilocos Norte, and P5,000 for the repair and upkeep of Cabanatuan Constabulary Barracks, Nueva Ecija.
Section 1, paragraph (d), Items 1 to 9, inclusive.
Section 1, paragraph (f), Items 4 and 5.
Section 1, paragraph (i), proviso as follows: Provided, That P5,000 of this amount shall be spent for the investigation and survey of the Capas, Tarlac-Iba, Zambales interprovincial road.
Section 1, paragraph (k), Items 4, 34, 36-c, 37-a, 39 and 40-a-b-c.
Section 1, paragraph (q), proviso as follows: And provided, finally, That the sum of P10,000 shall be released for the construction of Bucay Waterworks, Abra, and P18,000 for the construction of the Bantayan Waterworks, Cebu, the above requirements notwithstanding: the sum of P25,000 shall be set aside for the construction of Malasiqui Waterworks, Pangasinan; the sum of P8,000 for the construction of Santa Maria Waterworks, Laguna; the sum of P12,000 for the extension of the waterworks system to the College of Agriculture at Los Baños. Laguna; the sum of P20,000 for the construction of Cabugao Waterworks, Ilocos Sur; and P25,000 for the construction of Narvacan Waterworks, Ilocos Sur.
Section 1, paragraph (r), Items 5, 32, 33, 42, and 43.
Section 1, paragraph (t), Items 5, 6, 8, and 10.
Section 1, paragraph (v), proviso as follows: Provided, That the sum of P14,400 shall be expended for the installation of radio or telegraph stations at the municipalities of Sanchez-Mira and Faire, Cagayan.
All of section 2.
Section 4, proviso as follows: Provided, however, That in all construction works to be undertaken by the Government that require the list of cement, it shall be compulsory, the provisions of existing laws to the contrary notwithstanding, the use of cement manufactured by companies financed by the Government, except in those cases in which for reasons of cost, price, and transportation, the use of other cement manufactured in the Philippines as verified by the Insular Auditor is more advantageous." CASTDI
Cite This Law
Appropriations for Public Works, Act No. 3912, Nov 20, 1931 (Philippines)
Appropriations for Public Works, Act No. 3912 (Phil. 1931)
Related Laws
- Appropriations for Public WorksRepublic Act No. 5979 • Jul 24, 1969 • Statutes
- Appropriations for Public WorksAct No. 3258 • Dec 9, 1925 • Statutes
- An Act Making Appropriations for Public WorksAct No. 2059 • Feb 3, 1911 • Statutes
- An Act Making Appropriations for Public WorksAct No. 3113 • Mar 19, 1923 • Statutes
- Appropriations for Public WorksAct No. 3460 • Dec 7, 1928 • Statutes
- An Act Making Appropriations for Public WorksAct No. 3145 • Mar 9, 1924 • Statutes
Browse More Statutes
Explore other laws in the Statutes category.
View All StatutesNeed Help Understanding This Law?
Ask our AI assistant to explain provisions, implications, or related laws.
Ask AI About This Law