Resumption of Construction of the Bataan Nuclear Power Plant
On September 15, 1980, Letter of Instructions No. 1065 was issued to various government officials regarding the Bataan Nuclear Power Plant's safety following a report from a commission created by Executive Order No. 539. The report recommended significant design changes and safety upgrades, influenced by the Three-Mile Island incident and U.S. Nuclear Regulatory Commission guidelines. The Philippine Atomic Energy Commission (PAEC) subsequently concluded that the plant could operate safely under the updated regulations and recommended lifting the construction suspension. Additionally, the National Power Corporation and Westinghouse agreed to amend their contract to enhance oversight and increase performance liabilities. The National Power Corporation was directed to resume construction of the plant.
Quick Answers
- What is Resumption of Construction of the Bataan Nuclear Power Plant about?
- On September 15, 1980, Letter of Instructions No. 1065 was issued to various government officials regarding the Bataan Nuclear Power Plant's safety following a report from a commission created by Executive Order No. 539. The report recommended significant design changes and safety upgrades, influenced by the Three-Mile Island incident and U.S. Nuclear Regulatory Commission guidelines. The Philippine Atomic Energy Commission (PAEC) subsequently concluded that the plant could operate safely under the updated regulations and recommended lifting the construction suspension. Additionally, the National Power Corporation and Westinghouse agreed to amend their contract to enhance oversight and increase performance liabilities. The National Power Corporation was directed to resume construction of the plant.
- What type of law is Letter of Instructions No. 1065?
- Resumption of Construction of the Bataan Nuclear Power Plant (Letter of Instructions No. 1065) is a Philippine Presidential Issuances enacted by the Congress of the Philippines.
- When was Resumption of Construction of the Bataan Nuclear Power Plant enacted?
- Resumption of Construction of the Bataan Nuclear Power Plant (Letter of Instructions No. 1065) was enacted on Sep 15, 1980.
- What is the citation for Resumption of Construction of the Bataan Nuclear Power Plant?
- Resumption of Construction of the Bataan Nuclear Power Plant, Letter of Instructions No. 1065, Sep 15, 1980 (Philippines)
Law Information
- Reference Number
- Letter of Instructions No. 1065
- Date Enacted
- Category
- Presidential Issuances
- Subcategory
- Letters of Instructions
- Jurisdiction
- Philippines
- Enacting Body
- Congress of the Philippines
Full Law Text
September 15, 1980
LETTER OF INSTRUCTIONS NO. 1065
| TO | : | The Minister of Justice |
| The Minister of Finance | ||
| The Minister of Energy | ||
| The Solicitor General | ||
| The President, National Power Corporation |
On November 13, 1979, the Commission created by Executive Order No. 539 to conduct an inquiry into the safety to the public of the proposed nuclear plant, submitted its report to the President and recommended that changes in design and additional, adequate and acceptable safety upgrades be incorporated in the Bataan nuclear power plant so that the plant shall not pose a potential hazard to the health and safety of the public. acd
In view thereof, the President, under LOI No. 957 dated November 13, 1979, directed the above-mentioned ministers to take immediate and appropriate steps to safeguard the interest of the Government. Accordingly, steps were taken to re-evaluate the plant's safety as well as to renegotiate the NPC-Westinghouse contract:
1. The design and safety features of the plant were re-evaluated in the light of additional safety requirements required as a consequence of the Three-Mile Island nuclear plant incident as well as safety upgrades and other requirements as contained in US Nuclear Regulatory Commission (USNRC) regulatory guides. After its re-evaluation, the Philippine Atomic Energy Commission (PAEC) in its report to the President dated 15 August 1980 said:
xxx xxx xxx
"The Philippine Atomic Energy Commission (PAEC), in pursuance of its nuclear regulatory function, has adopted U.S. NRC regulatory guides that are pertinent and applicable for the first Philippine Nuclear Power Plant. If the National Power Corporation (NPC) had applied for a construction permit in the U.S. at the same time it filed the application in the Philippines, a total of one hundred two (102) regulatory guides on nuclear power plants would have been required by the U.S. NRC. All of these 102 regulatory guides were required of NPC by PAEC before PAEC issued a construction permit for PNPP-1. After the issuance of the construction permit, PAEC required NPC an additional thirty-three (33) regulatory guides, nine (9) TMI-related requirements, and two (2) concerns raised by the International Atomic Energy Agency (IAEA)."
xxx xxx xxx
"With the regulatory guides, the TMI-2 learned lessons and IAEA requirements imposed, as indicated in the Appendix, the PAEC considers that, under the present state of the technology on nuclear power reactors, the PNPP-1 can be built and operated without causing undue risk to public health and safety and thereby respectfully recommends to the President that the suspension order on the construction of the PNPP-1 be lifted."
xxx xxx xxx
The Commission created by Executive Order No. 539 to which the PAEC report was endorsed for comment has expressed the view that the nuclear plant, as updated, would be as reasonably safe as any nuclear plant can be under the present state of technology.
2. The National Power Corporation and Westinghouse have also re-evaluated their relationship and are willing to amend their contract to introduce some changes which would enable NPC to better monitor, audit and administer the contract as well as increase certain liabilities of Westinghouse for performance warranties.
In view thereof, the National Power Corporation is hereby directed to take the necessary steps, upon notice to its contractor, Westinghouse, to resume construction of the plant.
For immediate implementation.
DONE in the City of Manila, this 15th day of September, in the year of Our Lord, Nineteen Hundred and Eighty. cd
Cite This Law
Resumption of Construction of the Bataan Nuclear Power Plant, Letter of Instructions No. 1065, Sep 15, 1980 (Philippines)
Resumption of Construction of the Bataan Nuclear Power Plant, Letter of Instructions No. 1065 (Phil. 1980)
Related Laws
- Stopping the Construction of the Bataan Nuclear Power PlantLetter of Instructions No. 957 • Nov 13, 1979 • Presidential Issuances
- Questions to be Answered Re: Inquiry on the Safety of the Bataan Nuclear Power PlantLetter of Instructions No. 876 • Jun 16, 1979 • Presidential Issuances
- Exclusive Use in Construction and Erection of Nuclear Reactor Plant and Its Civil WorksLetter of Instructions No. 517 • Mar 16, 1977 • Presidential Issuances
- Study of the Legal Implications of the Bataan Nuclear Power Reactor ContractLetter of Instructions No. 875 • Jun 16, 1979 • Presidential Issuances
- Evaluation of the NPC-WIPCO Contract Re: Nuclear Power Plant ProjectLetter of Instructions No. 893 • Jul 20, 1979 • Presidential Issuances
- Conduct of Formal Inquiry on Possible Dangers That May Arise from Operation of Proposed Nuclear PlantLetter of Instructions No. 906 • Aug 8, 1979 • Presidential Issuances
Browse More Presidential Issuances
Explore other laws in the Presidential Issuances category.
View All Presidential IssuancesNeed Help Understanding This Law?
Ask our AI assistant to explain provisions, implications, or related laws.
Ask AI About This Law