Public Works Act
Act No. 4180, enacted on December 6, 1934, appropriates funds from the Insular Treasury for various public works projects in the Philippines. The law allocates specific amounts for the construction, improvement, and maintenance of public buildings, particularly schools, agricultural institutions, and infrastructure such as roads and bridges. It emphasizes local government involvement by requiring municipalities to share costs and ensure maintenance funding for these projects. The act also outlines conditions for the distribution of funds and the handling of any unexpended balances. Overall, it aims to enhance public facilities and support local development through targeted financial appropriations.
Quick Answers
- What is Public Works Act about?
- Act No. 4180, enacted on December 6, 1934, appropriates funds from the Insular Treasury for various public works projects in the Philippines. The law allocates specific amounts for the construction, improvement, and maintenance of public buildings, particularly schools, agricultural institutions, and infrastructure such as roads and bridges. It emphasizes local government involvement by requiring municipalities to share costs and ensure maintenance funding for these projects. The act also outlines conditions for the distribution of funds and the handling of any unexpended balances. Overall, it aims to enhance public facilities and support local development through targeted financial appropriations.
- What type of law is Act No. 4180?
- Public Works Act (Act No. 4180) is a Philippine Statutes enacted by the Congress of the Philippines.
- When was Public Works Act enacted?
- Public Works Act (Act No. 4180) was enacted on Dec 6, 1934.
- What is the citation for Public Works Act?
- Public Works Act, Act No. 4180, Dec 6, 1934 (Philippines)
Law Information
- Reference Number
- Act No. 4180
- Date Enacted
- Category
- Statutes
- Subcategory
- Acts
- Jurisdiction
- Philippines
- Enacting Body
- Congress of the Philippines
Full Law Text
December 6, 1934
ACT NO. 4180
AN ACT MAKING APPROPRIATIONS FOR PUBLIC WORKS, AND FOR OTHER PURPOSES
SECTION 1. The following sums, or so much thereof as may be necessary, are hereby appropriated out of any funds in the Insular Treasury not otherwise appropriated, to be at the disposal of the Director of Public Works, subject to the approval of the Secretary of Public Works and Communications and the provisions hereinafter set forth, for the purposes mentioned hereunder:
A. CONSTRUCTION, IMPROVEMENT, REPAIR, AND MAINTENANCE OF PUBLIC BUILDINGS AND OTHER UNCLASSIFIED PROJECTS
| (a) | For the construction of the following insular building projects: | |||
| 1. | For the construction of two dormitory | |||
| buildings at the Culion Leper Colony | P6,000.00 | |||
| 2. | For the construction of three standard | |||
| barracks for the Bicol Treatment | ||||
| Station, Legaspi | 6,000.00 | |||
| (b) | For the construction, improvement and repair of the following | |||
| agricultural schools in regularly organized provinces: | ||||
| 1. | Santa Maria Agricultural School, Ilocos Sur | 2,000.00 | ||
| 2. | Agricultural School of Central Luzon, Muñoz, | |||
| Nueva Ecija | 2,000.00 | |||
| 3. | Agricultural School of Lagangilang, Abra, | |||
| including purchase of land and waterworks | ||||
| system | 2,000.00 | |||
| 4. | Agricultural school of Guinobatan, Albay | 2,000.00 | ||
| 5. | Agricultural school of Bilar, Bohol | 2,000.00 | ||
| 6. | Agricultural school of Piat, Cagayan | 2,000.00 | ||
| 7. | Agricultural school of Banga, Capiz, including | |||
| purchase of land | 2,000.00 | |||
| 8. | Agricultural school of Jones, Isabela | 2,000.00 | ||
| 9. | Agricultural school of Indang, Cavite | 2,000.00 | ||
| 10. | Agricultural school of Cabagan, Isabela | 2,000.00 | ||
| 11. | Agricultural school of San Marcelino, | |||
| Zambales | 2,000.00 | |||
| 12. | Agricultural school, Echague, Isabela | 2,000.00 | ||
| (c) | For aid to municipalities for the construction, reconstruction, | |||
| alteration, repair, extension and completion of the following | ||||
| elementary and intermediate schools: | ||||
| ABRA | ||||
| 1. | For the elementary school of Lagangilang | 1,500.00 | ||
| 2. | For the elementary school of Dolores | 2,000.00 | ||
| 3. | For the elementary school of San Juan | 2,000.00 | ||
| 4. | For the elementary school of Caupasan, Danglas | 1,500.00 | ||
| 5. | For the elementary school of La Paz | 1,500.00 | ||
| 6. | For the elementary school of San Quintin | 2,000.00 | ||
| 7. | For the elementary school of Pilar | 2,000.00 | ||
| 8. | For the elementary school of Villaviciosa | 2,000.00 | ||
| 9. | For the elementary school of San Gregorio, | |||
| La Paz | 1,000.00 | |||
| 10. | For the elementary school of Bagalay, | |||
| Tayum | 1,000.00 | |||
| 11. | For the completion of Ba-ac Elementary | |||
| School, Lañgiden | 500.00 | |||
| 12. | For the completion of the Intermediate School | |||
| Building, Tayum | 1,000.00 | |||
| ALBAY | ||||
| 1. | For the construction of Labnig barrio school | |||
| building, Malinao, Albay | 2,500.00 | |||
| 2. | For the repairs of the central school, Libog, | |||
| Albay | 700.00 | |||
| 3. | For the construction of the Legaspi Central | |||
| School | 20,000.00 | |||
| 4. | For the construction of Cabugao school, Bato, | |||
| Catanduanes | 3,350.00 | |||
| 5. | For the construction of additional room in the | |||
| central school, Malilipot, Albay | 3,500.00 | |||
| 6. | For the completion of Guinobatan school, Albay | 10,000.00 | ||
| 7. | For the reconstruction of San Miguel barrio | |||
| school, Tabaco, Albay | 2,500.00 | |||
| 8. | For the repairs of the central school building, | |||
| Bacacay, Albay | 1,000.00 | |||
| 9. | For the repairs of the Juroan barrio school | |||
| building, Tiwi, Albay | 700.00 | |||
| 10. | For the repairs of the central school building, | |||
| Tiwi, Albay | 1,000.00 | |||
| 11. | For the reconstruction of Tabiguian barrio school | |||
| building, Tabaco, Albay | 1,000.00 | |||
| 12. | For the repairs of the Cale barrio school building, | |||
| Tiwi, Albay | 800.00 | |||
| 13. | For the reconstruction of Tanagan barrio school | |||
| building, Bacacay, Albay | 1,000.00 | |||
| 14. | For the reconstruction of Cagraray barrio school | |||
| building, Bacacay, Albay | 1,000.00 | |||
| 15. | For the repairs of San Fernando barrio school | |||
| building, Libog, Albay | 1,500.00 | |||
| 16. | For the repairs of San Andres barrio school | |||
| building, Libog, Albay | 500.00 | |||
| 17. | For the repairs of San Isidro barrio school | |||
| building, Malilipot, Albay | 400.00 | |||
| 18. | For the repairs of San Pedro barrio school | |||
| building, Bacacay, Albay | 400.00 | |||
| 19. | For the repairs of the Estancia barrio school | |||
| building (annexed) Malinao, Albay | 1,000.00 | |||
| 20. | For the repairs of home economics building, | |||
| Malinao, Albay | 500.00 | |||
| 21. | For the construction of the home economics | |||
| building, Tiwi, Albay | 2,000.00 | |||
| 22. | For the Taplacon Elementary School, | |||
| Camalig, Albay | 2,000.00 | |||
| 23. | For the Bascaran Elementary School, Daraga | 3,000.00 | ||
| 24. | For the San Ramon Elementary School, | |||
| Daraga | 3,000.00 | |||
| 25. | For the Manito Elementary School | 3,000.00 | ||
| 26. | For the Taysan Elementary School, Albay | 2,000.00 | ||
| 27. | For the Isarado Elementary School, Daraga | 2,000.00 | ||
| 28. | For the construction of the Obo Elementary | |||
| School, Bato | 1,650.00 | |||
| 29. | For the construction of the Tilod Elementary | |||
| School, Baras | 1,650.00 | |||
| 30. | For the construction of the Codon Elementary | |||
| School, Calolbon | 1,650.00 | |||
| 31. | For the construction of the Tinago Elementary | |||
| School, Viga | 1,650.00 | |||
| 32. | For the construction of the Bugao Elementary | |||
| School, Panganiban | 1,650.00 | |||
| 33. | For the construction of the Tubli Elementary | |||
| School, Pandan | 1,650.00 | |||
| 34. | For the Taladong school, Camalig | 2,000.00 | ||
| ANTIQUE | ||||
| 1. | For the construction, alteration and repair of the | |||
| Sobasto Elementary School, Pandan | 1,000.00 | |||
| 2. | For the reconstruction, alteration and repair of the | |||
| Bacalan Elementary School, Culasi | 1,000.00 | |||
| 3. | For the repairs of the Santa Justa School, Tibiao | 1,000.00 | ||
| 4. | For the construction, alteration and repair of the | |||
| Capuywan Elementary School, Barbaza | 1,000.00 | |||
| 5. | For the repair of the San Remigio Primary | |||
| School | 1,000.00 | |||
| 6. | For the repair of the San Jose trade shop | 1,000.00 | ||
| BATAAN | ||||
| 1. | For the completion of the Saysain Elementary | |||
| School, Bagac | P1,000.00 | |||
| 2. | For the repair of the Wawang Pilar Elementary | |||
| School, Pilar | 1,000.00 | |||
| 3 | For the repair of the Cabcaben Elementary School, | |||
| Mariveles | 500.00 | |||
| 4. | For the repair of the Samal Elementary School | 500.00 | ||
| 5. | For the repair and completion of the Mariveles | |||
| Elementary School | 8,000.00 | |||
| 6. | For the completion of the Daang-Pare barrio | |||
| school building, Orion | 1,000.00 | |||
| 7. | For additional room in the Nagbalayong | |||
| barrio school, Moron | 1,500.00 | |||
| 8. | For the repair of Tortugas school, Balanga | 1,000.00 | ||
| 9. | For school shop building in Limay | 1,500.00 | ||
| 10. | For Saba barrio school building, Hermosa | 1,500.00 | ||
| 10a. | For the repair of Bataan barrio school, | |||
| Orion | 500.00 | |||
| 11. | For the completion of Tomas Pinpin Memorial | |||
| School, Abucay | 2,000.00 | |||
| BATANES | ||||
| 1. | For the primary school building at Chavayan, | |||
| Sabtang | 2,500.00 | |||
| 2. | For the repair of the elementary school at | |||
| Mahatao | 2,000.00 | |||
| 3. | For the repair of the elementary school of | |||
| Uyugan | 2,000.00 | |||
| 4. | For the repair of the elementary school of | |||
| Itbayat | 2,000.00 | |||
| 5. | For the repair of the elementary school of | |||
| Ivana | 4,500.00 | |||
| 6. | Basco Elementary School | 5,000.00 | ||
| BATANGAS | ||||
| 1. | For the extension of Ta-al Central School | 3,850.00 | ||
| 2. | For the San Nicolas Elementary School, Taal | 3,000.00 | ||
| 3. | For the Banoyo Elementary School, San Luis | 3,500.00 | ||
| 4. | For the Boboy Elementary School, San Luis | 2,000.00 | ||
| 5. | For the repair of San Luis Gabaldon | |||
| Elementary School | 500.00 | |||
| 6. | For the completion of the San Luis Domestic | |||
| Science Building | 250.00 | |||
| 7. | For the Aromahan Elementary School, Lemery | 3,000.00 | ||
| 8. | For the completion and repair of the Subic | |||
| Elementary School, Lemery | 1,000.00 | |||
| 9. | For the painting and repair of the Guitna | |||
| Elementary School, Lemery | 400.00 | |||
| 10. | For the Baha Elementary School, Balayan | 2,000.00 | ||
| 11. | For the Binubusan Elementary School, Lian | 2,500.00 | ||
| 12. | For the Caylaway Elementary School, | |||
| Nasugbu | 2,000.00 | |||
| 13. | For the Masaguitsit Primary School, Lobo | 2,000.00 | ||
| 14. | For the Pallocan Primary School, Batangas | 3,000.00 | ||
| 15. | For the Bilogo school building, Taysan | 500.00 | ||
| 16. | For the Pinagbayanan school building, Taysan | 500.00 | ||
| 17. | For the Sinala Elementary School, Bauan | 2,500.00 | ||
| 18. | For the Dagatan Elementary School, Taysan | 500.00 | ||
| 19. | For the barrio school of Malaking Pulo, Tanawan | 2,000.00 | ||
| 20. | For the construction of one domestic science | |||
| building in the barrio of Tingloy, Island of | ||||
| Maricaban, Bauan | 1,000.00 | |||
| 21. | For the construction of the Baguilawa school, | |||
| Bauan | 2,000.00 | |||
| 22. | For the construction of the Ayao barrio | |||
| school, Lemery | 2,000.00 | |||
| 23. | For the construction of the Dacanlao | |||
| barrio school, Calaca | 2,000.00 | |||
| 24. | For the reconstruction of the Sinala | |||
| barrio school, Bauan | 2,000.00 | |||
| 25. | For the reconstruction of the domestic | |||
| science building of Talaga, annex to the | ||||
| Mabini Memorial School, Tanauan | 2,000.00 | |||
| 26. | For the construction of an elementary school | |||
| in the barrio of Trapiche, Tanauan | 2,000.00 | |||
| 27. | For the construction of an elementary school | |||
| in the barrio of Maugat, Rosario | 2,000.00 | |||
| 28. | For the repair and completion of the Bolbok | |||
| barrio school, Lipa | 2,000.00 | |||
| 29. | For the completion of the Bayuyuñgan Elementary | |||
| School, Batangas | 2,000.00 | |||
| 30. | For the Santa Anastacia barrio school building | |||
| in Santo Tomas, Batangas | 3,000.00 | |||
| 31. | For the construction of the barrio school of | |||
| Bulihan, Rosario | 3,000.00 | |||
| 32. | For the San Isidro barrio school, Santo Tomas | 2,000.00 | ||
| 33. | For the Talisay Primary School | 5,000.00 | ||
| BOHOL | ||||
| 1. | For the completion of the Guiwanon Primary | |||
| School, Baclayon | 1,000.00 | |||
| 2. | For the completion of the Laya Primary School, | |||
| Baclayon | 1,000.00 | |||
| 3. | For the completion of the Cambanac Primary | |||
| School, Baclayon | 250.00 | |||
| 4. | For the completion of the Tanday Primary | |||
| School, Baclayon | 250.00 | |||
| 5. | For the completion of the Campatoc Primary | |||
| School, Baclayon | 1,000.00 | |||
| 6. | For the completion of the Cangawa Primary | |||
| School, Baclayon | 200.00 | |||
| 7. | For the completion of the Tuñga Primary School, | |||
| Baclayon | 200.00 | |||
| 8. | For the reconstruction of the Da-o Primary | |||
| School, Dawis | 500.00 | |||
| 9. | For the reconstruction of the Cangcatac | |||
| Primary School, Corella | 500.00 | |||
| 10. | For the reconstruction of the Canangka-an | |||
| Primary School, Corella | 500.00 | |||
| 11. | For the reconstruction of the Liba-ong | |||
| Primary School, Panglao | 500.00 | |||
| 12. | For the completion of the Bolod Primary | |||
| School, Panglao | 500.00 | |||
| 13. | For the completion of the Bilisan Primary | |||
| School, Panglao | 500.00 | |||
| 14. | For the reconstruction of the Tultugan | |||
| Primary School, Calape | 1,500.00 | |||
| 15. | For the Lila Home Economics Building | 3,000.00 | ||
| 16. | For the Baclayon Central School Building | 8,000.00 | ||
| 17. | For the Tangnan Elementary School, Panglao | 1,000.00 | ||
| 18. | For the Biking Elementary School, Dawis | 1,000.00 | ||
| 19. | For the Mansasa Elementary School, Tagbilaran | 2,000.00 | ||
| 20. | For the Botoc Elementary School, Loay | 500.00 | ||
| 21. | For the Bato Elementary School, Guindulman | 1,000.00 | ||
| 22. | For the Cogtong Elementary School, Candijay | 1,000.00 | ||
| 23. | For the repair of the Patrocinio Primary | |||
| School, Cortes | 700.00 | |||
| 24. | For the reconstruction of the Sungkulan | |||
| Primary School, Dawis | 800.00 | |||
| 25. | For the reconstruction of the Biñgag Primary | |||
| School, Dawis | 500.00 | |||
| 26. | For the reconstruction of the Dampas | |||
| Primary School, Tagbilaran | 500.00 | |||
| 27. | For the repair of the Taloto Primary School, | |||
| Tagbilaran | 1,300.00 | |||
| 28. | For the completion of the Da-o Primary | |||
| School, Tagbilaran | 500.00 | |||
| 29. | For the repair of the Gaboc Primary School, | |||
| Tagbilaran | 500.00 | |||
| 30. | For the repair of the Lincod Primary School, | |||
| Maribojoc | 200.00 | |||
| 31. | For the reconstruction of the Bayacabac | |||
| Primary School, Maribojoc | 300.00 | |||
| 32. | For the repair of the Cabawan Primary | |||
| School, Maribojoc | 300.00 | |||
| 33. | For the reconstruction of the Camyas | |||
| Primary School, Calape | 500.00 | |||
| 34. | For the reconstruction of the Candungao | |||
| Primary School, Calape | 500.00 | |||
| 35. | For the repair of the Tiptip Primary School, | |||
| Tagbilaran | 500.00 | |||
| 36. | For the repair of the Bagacay Primary | |||
| School, Lo-on | 500.00 | |||
| 37. | For the Sagbayan school building, Clarin | 1,000.00 | ||
| 38. | For the Colonia school building, Carmen | 1,500.00 | ||
| 39. | For the Sta. Cruz school building, Batuan | 1,500.00 | ||
| 40. | For the Toril school building, Alburquerque | 1,000.00 | ||
| 41. | For the Cambuac school building, Sikatuna | 1,000.00 | ||
| 42. | For the Magsija school building, Balilihan | 1,500.00 | ||
| 43. | For the Talenseras school building, Tubigon | 1,500.00 | ||
| 44. | For the Luyo school building, Inabanga | 1,500.00 | ||
| 45. | For the Lutao school building, Inabanga | 1,500.00 | ||
| 46. | For the Buenavista school building, Loboc | 1,500.00 | ||
| 47. | For the Macaas school building, Tubigon | 1,500.00 | ||
| 48. | For the Jagna Elementary School | 2,000.00 | ||
| 49. | For the Katungawan Elementary School, | |||
| Guindulman | 2,000.00 | |||
| 50. | For the Duero shop building, Duero | 1,000.00 | ||
| 51. | For the Ypil Elementary School, Talibon | 1,000.00 | ||
| 52. | For the Danao Elementary School, Talibon | 1,000.00 | ||
| 53. | For the Banakon Elementary School, Getafe | 1,000.00 | ||
| 54. | For the Cabul-an Elementary School, Getafe | 1,000.00 | ||
| 55. | For the Pitogo Elementary School, Ubay | 1,000.00 | ||
| 56. | For the Lungsud Da-an Elementary School, | |||
| Candijay | 1,000.00 | |||
| 57. | For the Cabulao Elementary School, Mabini | 1,000.00 | ||
| 58. | For the Tapa Elementary School, Ubay | 500.00 | ||
| 59. | For the Candabung Elementary School, Anda | 500.00 | ||
| 60. | For the Catagda-an Elementary School, | |||
| Sierra-Bullones | 500.00 | |||
| 61. | For the Valencia shop building, Valencia | 1,000.00 | ||
| 62. | For the Canayawon Elementary School, | |||
| Garcia Hernandez | 500.00 | |||
| 63. | For the construction of the Totolan barrio | |||
| School, Dawis | 1,000.00 | |||
| 64. | For the construction of the Bo-oy barrio | |||
| school, Tagbilaran | 1,000.00 | |||
| 65. | For the reconstruction of the Mabini | |||
| Home Economics Building | 1,000.00 | |||
| 66. | For the construction of the Tayong barrio | |||
| school, Loay | 1,000.00 | |||
| 67. | For the construction of the Sagnap barrio | |||
| school, Loay | 1,000.00 | |||
| 68. | For the construction of the Bagumbayan | |||
| barrio school, Loboc | 1,000.00 | |||
| 69. | For the construction of the Kinuguitan | |||
| barrio school, Loboc | 1,000.00 | |||
| 70. | For the construction of the Catungawan | |||
| barrio school, Guindulman | 1,000.00 | |||
| 71. | For the construction of the Tabuani barrio | |||
| school, Alburquerque | 1,000.00 | |||
| 72. | For additional room in the Jagna | |||
| Elementary School | 1,000.00 | |||
| 73. | For the construction of the Cambito-on | |||
| barrio school, Inabanga | 1,000.00 | |||
| 74. | For the construction of the Candontol | |||
| barrio school, Loay | 1,000.00 | |||
| 75. | For the construction of the Bolod barrio | |||
| school, Panglao | 1,000.00 | |||
| 76. | For the construction of the Kalunasan Sur | |||
| barrio school, Loboc | 1,000.00 | |||
| 77. | For the construction of the Tigbao barrio | |||
| school building, Loboc | 1,000.00 | |||
| 78. | For the construction of the Lapakan barrio | |||
| school, Inabanga | 500.00 | |||
| 79. | For the construction of the Bayawahan barrio | |||
| school, Sevilla | 1,000.00 | |||
| 80. | For the construction of the Cambagui | |||
| barrio school, Sevilla | 1,000.00 | |||
| 81. | For the completion of the central school, Loay | 1,000.00 | ||
| 82. | For the construction of Las Salinas barrio | |||
| school, Loay | 1,000.00 | |||
| 83. | For the completion of the Botoc barrio | |||
| school, Loay | 500.00 | |||
| 84. | For the construction of the barrio school | |||
| of Tambangan, Loay | 1,000.00 | |||
| 85. | For the construction of the Bagumbayan | |||
| barrio school, Loboc | 1,000.00 | |||
| 86. | For the construction of the Bo-ol barrio | |||
| school, Tagbilaran | 1,000.00 | |||
| 87. | For the Tiguis school, Lila | 1,000.00 | ||
| BUKIDNON | ||||
| 1. | For the construction of the Talakag | |||
| Elementary School | 8,000.00 | |||
| BULACAN | ||||
| 1. | For the Bocaue Domestic Science Building | 3,000.00 | ||
| 2. | For the Malibong-Matanda Elementary | |||
| School, Bigaa | 1,000.00 | |||
| 3. | For the repair of the Calizon Elementary | |||
| School, Calumpit | 1,000.00 | |||
| 4. | For the repair of the Santo Cristo | |||
| Elementary School, Pulilan | 800.00 | |||
| 5. | For the repair of the Culianin Elementary | |||
| School, Quingua | 800.00 | |||
| 6. | For the San Miguel Elementary School, | |||
| Hagonoy | 800.00 | |||
| 7. | For the repair of the Pulungubat Elementary | |||
| School, Guiguinto | 300.00 | |||
| 8. | For the San Pascual Elementary School, | |||
| Hagonoy | 1,000.00 | |||
| 9. | For the reconstruction of the Matungao | |||
| Elementary School, Bulacan | 2,000.00 | |||
| 10. | For the construction of the Bagong Barrio | |||
| Elementary School, Bigaa | 1,500.00 | |||
| 11. | For the repair of the Cacarong Elementary | |||
| School, Bigaa | 200.00 | |||
| 12. | For the repair of the Bagbagin Elementary | |||
| School, Bigaa | 200.00 | |||
| 13. | For the repair of the Siling-Bata Elementary | |||
| School, Bigaa | 200.00 | |||
| 14. | For the repair of the Siling-Matanda | |||
| Elementary School, Bigaa | 200.00 | |||
| 15. | For the repair of the Taal Elementary | |||
| School, Bocaue | 300.00 | |||
| 16. | For the completion and repair of the | |||
| Calumpang Elementary School, Calumpit | 350.00 | |||
| 17. | For the completion and repair of the Bambang | |||
| Elementary School, Bulacan | 1,000.00 | |||
| 18. | For the reconstruction and repair of the | |||
| San Marcos Elementary School, Calumpit | 800.00 | |||
| 19. | For the additional room in the Santa Rita | |||
| Primary School, Guiguinto | 200.00 | |||
| 20. | For the repair of the Tiaong Elementary | |||
| School, Guiguinto | 200.00 | |||
| 21. | For the completion of Longos, Pulilan School | 3,000.00 | ||
| 22. | For the repair of the Tabang Elementary | |||
| School, Guiguinto | 200.00 | |||
| 23. | For the reconstruction and repair of the | |||
| Hagonoy Elementary School | 1,000.00 | |||
| 24. | For the construction of the San Juan Domestic | |||
| Science Building, Hagonoy | 800.00 | |||
| 25. | For the repair of the Santo Rosario Elementary | |||
| School, Hagonoy | 300.00 | |||
| 26. | For the repair of the Abulalas Elementary | |||
| School, Hagonoy | 200.00 | |||
| 27. | For the repair of the San Roque Elementary | |||
| School, Hagonoy | 200.00 | |||
| 28. | For the construction and repair of the Mohon | |||
| Elementary School, Malolos | 700.00 | |||
| 29. | For the repair of the Malolos Elementary School | 800.00 | ||
| 30. | For one additional room in the Bulihan | |||
| Elementary School, Malolos | 300.00 | |||
| 31. | For the reconstruction and repair of the Capitangan | |||
| Elementary School, Paombong | 300.00 | |||
| 32. | For the repair of the Dampol Elementary | |||
| School, Pulilan | 300.00 | |||
| 33. | For the construction of the Pulilan Home | |||
| Economics Building | 1,000.00 | |||
| 34. | For the reconstruction or repair of the Balatong | |||
| Elementary School, Pulilan | 300.00 | |||
| 35. | For the construction of an additional room in the | |||
| Quingua Elementary School | 300.00 | |||
| 36. | For the construction of the Quingua carpentry shop | 800.00 | ||
| 37. | For the construction or repair of Iba Este | |||
| Elementary School, Calumpit | 350.00 | |||
| 38. | For the construction and repair of the Sta. Ines | |||
| Elementary School, Bulacan | 1,000.00 | |||
| 39. | For the repair of the San Nicolas Elementary | |||
| School, Hagonoy | 300.00 | |||
| 40. | For the repair and improvement of the Santa | |||
| Barbara Elementary School, Baliwag | 2,000.00 | |||
| 41. | For the repair and improvement of the Sabang | |||
| Elementary School, Baliwag | 1,000.00 | |||
| 42. | For the completion of the Paombong Intermediate | |||
| School Building | 500.00 | |||
| 43. | For the repair of the Salañgan Elementary School, | |||
| San Miguel | 500.00 | |||
| 44. | For the repair of the San Agustin Elementary | |||
| School, San Miguel | 1,500.00 | |||
| 45. | For the repair of the Pasolo Elementary | |||
| School, Polo | 500.00 | |||
| 46. | For the repair of the Kaypombo Elementary | |||
| School, Santa Maria | 500.00 | |||
| 47. | For the repair of the Panjolo Elementary | |||
| School, Obando | 500.00 | |||
| 48. | For the repair of the Obando Domestic | |||
| Science Building | 500.00 | |||
| 49. | For the repair of the Cambaog Elementary | |||
| School, Bustos | 500.00 | |||
| 50. | For the repair of the Banaban Elementary | |||
| School, Angat | 500.00 | |||
| 51. | For the repair of the Meycauayan | |||
| Elementary School | 1,000.00 | |||
| 52. | For the repair of the San Jose del Monte | |||
| Elementary School | 1,000.00 | |||
| 53. | For the repair of the San Ildefonso | |||
| Elementary School | 1,000.00 | |||
| 54. | For the La Loma de Gato Elementary | |||
| School, Marilao | 800.00 | |||
| 55. | For the Balaong barrio school, San Miguel, | |||
| Bulacan | 600.00 | |||
| 56. | For the Magmarali barrio school of San | |||
| Miguel, Bulacan | 600.00 | |||
| CAGAYAN | ||||
| 1. | For the repair of the Bulala Elementary | |||
| School, Aparri | 1,000.00 | |||
| 2. | For the repair of the Paddaya Elementary | |||
| School, Aparri | 1,000.00 | |||
| 3. | For the repair of the Linao Elementary | |||
| School, Aparri | 1,000.00 | |||
| 4. | For the repair of the Gulasing-Masi | |||
| Elementary School, Buguey | 1,000.00 | |||
| 5. | For the repair of the Libag Elementary | |||
| School, Tuguegarao | 1,000.00 | |||
| 6. | For the repair of the Catagaman Elementary | |||
| School, Tuguegarao | 2,000.00 | |||
| 7. | For the repair of the Caggay Elementary | |||
| School, Tuguegarao | 500.00 | |||
| 8. | For the repair of the Larion Elementary | |||
| School, Tuguegarao | 500.00 | |||
| 9. | For the repair of the Mamabbalan Elementary | |||
| School, Tuguegarao | 500.00 | |||
| 10. | For the repair of the Aguiguican Elementary | |||
| School, Gattaran | 500.00 | |||
| 11. | For the repair of the Calacagan-Bassi Elementary | |||
| School, Gattaran | 1,000.00 | |||
| 12. | For the repair of the Macatabang Elementary | |||
| School, Gattaran | 500.00 | |||
| 13. | For the repair of the Afusing Elementary | |||
| School, Alcala | 1,000.00 | |||
| 14. | For the repair of the Estefania Elementary | |||
| School, Amulung | 500.00 | |||
| 15. | For the repair of the Taytay Elementary | |||
| School, Baggao | 1,000.00 | |||
| 16. | For the repair of the Camalaniugan | |||
| Elementary School | 1,000.00 | |||
| 17. | For the repair of the Ziminila Elementary | |||
| School, Camalaniugan | 1,000.00 | |||
| 18. | For the repair of the Paddaya Elementary | |||
| School, Buguey | 500.00 | |||
| 19. | For the repair of the Aggumitan Elementary | |||
| School, Gattaran | 500.00 | |||
| 20. | For the repair of the Baquilao Elementary | |||
| School, Alcala | 500.00 | |||
| 21. | For the repair of the Cordoba Elementary | |||
| School, Amulung | 500.00 | |||
| 22. | For the completion of the Abulug | |||
| Elementary School | 2,000.00 | |||
| 23. | For the completion of the Sanchez-Mira | |||
| Elementary School | 3,000.00 | |||
| 24. | For the Pamplona Elementary School | 2,000.00 | ||
| 25. | For the Danaili Elementary School, Abulug | 1,500.00 | ||
| 25a. | For the Faire Elementary School | 1,500.00 | ||
| 25b. | For the Tuao Elementary School | 2,000.00 | ||
| 26. | For the reconstruction of Nanarian | |||
| school, Peñablanca | 500.00 | |||
| 27. | For the reconstruction of Aggugadan school, | |||
| Peñablanca | 500.00 | |||
| 28. | For the construction of one additional room | |||
| of Biduang school, Pamplona | 1,500.00 | |||
| 29. | For the reconstruction of Iraga school, | |||
| Solana | 1,000.00 | |||
| 30. | For the reconstruction of Gabuat school, | |||
| Amulung | 1,000.00 | |||
| 31. | For the repair of Abbeg school, Alcala | 500.00 | ||
| 32. | For the repair of Malalatan school, Alcala | 500.00 | ||
| 33. | For the repair of Baybayog school, Alcala | 500.00 | ||
| 34. | For the repair of Jurisdiccion school, Alcala | 500.00 | ||
| 35. | For the repair of Pinopoc school, Alcala | 500.00 | ||
| 36. | For the repair of Dalaoig school, Alcala | 500.00 | ||
| 37. | For the reconstruction of Ugac school, Iguig | 1,000.00 | ||
| 38. | For the repair of Minañga school, Piat | 500.00 | ||
| 39. | For the repair of Gumarueng school, Piat | 500.00 | ||
| 40. | For the repair of Maguiling school, Piat | 500.00 | ||
| 41. | For the reconstruction of Basi school, Solana | 1,000.00 | ||
| 42. | For the reconstruction of Madappian | |||
| school, Solana | 1,000.00 | |||
| 43. | For the reconstruction of Andarayan | |||
| school, Solana | 1,000.00 | |||
| 44. | For the reconstruction of Lanna school, Solana | 1,000.00 | ||
| 45. | For the reconstruction of Dassum school, Solana | 1,000.00 | ||
| 46. | For the Tabba Elementary School, Pamplona IDaEHS | 1,500.00 | ||
| 47. | For the Central Elementary School, | |||
| Claveria, Cagayan | 1,500.00 | |||
| CAMARINES NORTE | ||||
| 1. | For the construction of one additional room | |||
| in the Capalonga Elementary School | 2,000.00 | |||
| 2. | For the construction of one additional room in | |||
| the Mambulao Elementary School | 2,000.00 | |||
| 3. | For the construction of the Sabang barrio | |||
| school, Indan | 2,000.00 | |||
| 4. | For the construction of the Lalawigan | |||
| school, Daet | 2,000.00 | |||
| 5. | For the construction of the Paracale Home | |||
| Economics Building | 3,000.00 | |||
| 6. | For the repair of the two Paracale Elementary | |||
| School Buildings | 1,000.00 | |||
| 7. | For the repair of the Matango school | 500.00 | ||
| CAMARINES SUR | ||||
| 1. | For the reconstruction of the Pasacao | |||
| Elementary School | 3,000.00 | |||
| 2. | For the construction of the Camarines Sur | |||
| High School Home Economics Building | 5,000.00 | |||
| 3. | For the repair of the Minalabac Elementary | |||
| School | 1,000.00 | |||
| 4. | For the reconstruction of the Lupi Primary | |||
| School, Lupi | 1,500.00 | |||
| 5. | For the reconstruction of the Tabuco Primary | |||
| School, Naga | 1,000.00 | |||
| 6. | For the reconstruction of Camaligan | |||
| Central School | 1,000.00 | |||
| 7. | For the reconstruction of Sta. Cruz Primary | |||
| School, Naga | 1,000.00 | |||
| 8. | For the repair and reconstruction of Balongay | |||
| Primary School, Calabanga | 500.00 | |||
| 9. | For the repair and reconstruction of Union | |||
| Primary School, Calabanga | 500.00 | |||
| 10. | For the repair and reconstruction of Pamuquid | |||
| Primary School, San Fernando | 500.00 | |||
| 11. | For the repair, improvement and enlargement | |||
| of the Santo Domingo Elementary School, | ||||
| Iriga, Camarines Sur | 3,000.00 | |||
| 12. | For the construction of the Iriga Elementary | |||
| School Domestic Science Building | 4,500.00 | |||
| 13. | For the repair of the La Medalla barrio | |||
| school, Iriga, Camarines Sur | 500.00 | |||
| 14. | For the repair of the Santa Justina barrio | |||
| school, Buhi, Camarines Sur | 500.00 | |||
| 15. | For the repair of the Tambo barrio school | |||
| of Buhi, Camarines Sur | 500.00 | |||
| 16. | For the repair of the Cagliliog barrio school, | |||
| Tinambac, Camarines Sur | 500.00 | |||
| 17. | For the repair of the Buenavista barrio | |||
| school, Tinambac | 500.00 | |||
| 18. | For the construction of an additional room in | |||
| the Nabua Elementary School | 4,000.00 | |||
| CAPIZ | ||||
| 1. | For the reconstruction of Casanayan school | 2,000.00 | ||
| 2. | For the reconstruction of Dumolog School | |||
| Building, Capiz | 2,000.00 | |||
| 3. | For the reconstruction of Aranguel School | |||
| Building, Pilar | 2,000.00 | |||
| 4. | For Duran Primary School, Dumalag | 1,000.00 | ||
| 5. | For Candelaria Primary School, New | |||
| Washington | 1,500.00 | |||
| 6. | For the reconstruction of Jagnaya | |||
| Elementary School, Jamindan | 1,000.00 | |||
| 7. | For Mambusao Elementary School | 1,500.00 | ||
| 8. | For San Miguel Primary School, Tapaz | 1,000.00 | ||
| 9. | For the repair of the Dungon Elementary | |||
| School, Numancia | 1,000.00 | |||
| 10. | For the repair of the Naisud Elementary | |||
| School, Ibajay | 1,000.00 | |||
| 11. | For the repair of the Pooc Elementary | |||
| School, Kalibo | 1,000.00 | |||
| 12. | For the repair of the Nalook Elementary | |||
| School, Kalibo | 1,000.00 | |||
| 13. | For the repair of the Madalag Elementary | |||
| School, Libacao | 2,000.00 | |||
| 14. | For the repair of Tigayon Elementary | |||
| School, Kalibo | 500.00 | |||
| 15. | For the Linabuan Elementary School, Kalibo | 500.00 | ||
| 16. | For the Tagbaya Elementary School, Ibajay | 1,000.00 | ||
| 17. | For the Argao Elementary School, Buruanga | 2,000.00 | ||
| 18. | For the Ondoy Elementary School, Ibajay | 500.00 | ||
| 19. | For the Estancia Elementary School, Kalibo | 500.00 | ||
| 20. | For the Naile Elementary School, Ibajay | 500.00 | ||
| 21. | For the Aquino Elementary School, Ibajay | 500.00 | ||
| 22. | For the Maluco-Capilijan Elementary School, Ibajay | 800.00 | ||
| 23. | For the Agbago Elementary School, Ibajay | 500.00 | ||
| 24. | For the Rizal Elementary School, Ibajay | 500.00 | ||
| 25. | For the Tugas Elementary School, Makato | 500.00 | ||
| 26. | For the Cajilo Elementary School, Makato | 500.00 | ||
| 27. | For the Tangalan Elementary School | 500.00 | ||
| 28. | For the Silakat Nonoc Elementary School | 500.00 | ||
| 29. | For the Ibao Elementary School, Numancia | 500.00 | ||
| 30. | For the Bubog Elementary School, Numancia | 500.00 | ||
| 31. | For the Lezo Elementary School, Numancia | 500.00 | ||
| 32. | For the Camance Sur Elementary School, | |||
| Numancia | 500.00 | |||
| 33. | For the Tambuan Elementary School, Malinao | 900.00 | ||
| 34. | For the Rosario Elementary School, Malinao | 500.00 | ||
| 35. | For the San Roque Elementary School, | |||
| Malinao | 500.00 | |||
| 36. | For the Solido Elementary School, Nabas | 500.00 | ||
| 37. | For the Toledo Elementary School, Nabas | 500.00 | ||
| 38. | For the Unidos Elementary School, Nabas | 500.00 | ||
| 39. | For the Union Elementary School, Nabas | 500.00 | ||
| 40. | For the Unat-Bagacay Elementary School, | |||
| Ibajay | 800.00 | |||
| 41. | For the Balabag Elementary School, | |||
| Buruanga | 500.00 | |||
| 42. | For the Malay Elementary School, Buruanga | 500.00 | ||
| 43. | For the Agmailig Elementary School, Libacao | 500.00 | ||
| 44. | For the Sapian Elementary School | 1,000.00 | ||
| 45. | For the Camaligan, Ratan, Elementary School | 1,000.00 | ||
| CAVITE | ||||
| 1. | For the completion of Bailen Elementary | |||
| School | P3,000.00 | |||
| 2. | For the repair of Kawit Central School | |||
| (Aguinaldo Memorial School) | 1,000.00 | |||
| 3. | For the repair of the Binakayan school | 1,000.00 | ||
| 4. | For the construction of additional room in | |||
| Imus Elementary School | 4,000.00 | |||
| 5. | For the completion of the Home Economics | |||
| Building, Indang | 1,000.00 | |||
| 6. | For the construction of the Tanza Home | |||
| Economics Building | 3,000.00 | |||
| 7. | For the construction of Marigondon Home | |||
| Economics Building | 2,000.00 | |||
| 8. | For additional room in the Bacoor | |||
| Elementary School | 4,000.00 | |||
| 9. | For the repair of the Carmona Central School | 500.00 | ||
| 10. | For the repair of the Caridad Elementary | |||
| School | 500.00 | |||
| 11. | For the repair of the Naic Elementary School | 500.00 | ||
| 12. | For the repair of the Alfonso Elementary School | 500.00 | ||
| CEBU | ||||
| 1. | For the reconstruction and repair of the | |||
| Cabongaan Elementary School, Catmon | 2,000.00 | |||
| 2. | For the reconstruction and repair of the | |||
| Tabonan Elementary School, Borbon | 2,000.00 | |||
| 3. | For the reconstruction and repair of the Salag | |||
| Elementary School, Tabogon | 1,500.00 | |||
| 4. | For the reconstruction and repair of the Cajel | |||
| Elementary School, Borbon | 1,500.00 | |||
| 5. | For the repair and completion of the Liki | |||
| Elementary School, Sogod | 1,000.00 | |||
| 6. | For the repair and completion of the Polambato | |||
| Elementary School, Bogo | 1,000.00 | |||
| 7. | For the repair and completion of the Anonang | |||
| Elementary School, Bogo | 1,000.00 | |||
| 8. | For the repair and completion of the Lanao | |||
| Elementary School, Pilar | 1,000.00 | |||
| 9. | For the repair and completion of the Fuente | |||
| Elementary School, Carmen | 1,000.00 | |||
| 10. | For the repair and completion of the Suba | |||
| Elementary School, Danao | 1,000.00 | |||
| 11. | For the repair and completion of the Gairan | |||
| Elementary School, Bogo | 1,000.00 | |||
| 12. | For the construction of the Ibo Elementary | |||
| School, Opon | 2,500.00 | |||
| 13. | For the Talisay Home Economics Building, | |||
| municipality of Talisay | 3,000.00 | |||
| 14. | For the Talisay Intermediate School, | |||
| municipality of Talisay | 8,000.00 | |||
| 15. | For the Camp 7 Elementary School, | |||
| Minglanilla | 2,000.00 | |||
| 16. | For Napo Elementary School, Carcar | 2,500.00 | ||
| 17. | For the construction of the Nug-as Elementary | |||
| School, Alcoy | 2,000.00 | |||
| 18. | For the construction of the Taluot Elementary | |||
| School, Argao | 2,500.00 | |||
| 19. | For the construction of the Casay Elementary | |||
| School, Dalaguete | 5,000.00 | |||
| 20. | For the construction of the Tanke barrio | |||
| school, Talisay | 2,500.00 | |||
| 21. | For the reconstruction of the Pitalo barrio | |||
| school, San Fernando | 2,500.00 | |||
| 22. | For the reconstruction of the Sumaguan | |||
| Elementary School, Argao | 3,500.00 | |||
| 23. | For the repair of the Giwang Elementary | |||
| School, Alcoy | 500.00 | |||
| 24. | For the construction of the Samboan | |||
| Central School | 8,000.00 | |||
| 25. | For the completion of the Guiwanon barrio | |||
| school, Ginatilan | 1,000.00 | |||
| 26. | For the completion of the Madrilejos | |||
| barrio school, Alegria | 1,000.00 | |||
| 27. | For the construction of the Palanas barrio | |||
| school, Ginatilan | 2,500.00 | |||
| 28. | For the reconstruction of the Labrador barrio | |||
| school, Malabuyok | 2,500.00 | |||
| 29. | For the reconstruction of the Legaspi barrio | |||
| school, Alegria | 2,500.00 | |||
| 30. | For the reconstruction of the Santa Filomena | |||
| barrio school, Alegria | 2,500.00 | |||
| 31. | For the construction of the Saavedra barrio | |||
| school, Moalbual | 2,000.00 | |||
| 32. | For the completion of the Looc barrio school, | |||
| Malabuyok | 500.00 | |||
| 33. | For the completion of the Montañesa barrio | |||
| school, Malabuyok | 500.00 | |||
| 34. | For the reconstruction of the Mainit barrio | |||
| school, Oslob | 2,500.00 | |||
| 35. | For the reconstruction of Mandilikit barrio | |||
| school, Argao | 3,000.00 | |||
| 36. | For the repair and completion of the Malalag | |||
| Elementary School, Argao | 500.00 | |||
| 37. | For the Cabadiangan Elementary School, | |||
| Alcantara | 2,000.00 | |||
| 38. | For the Balabagon Elementary School, | |||
| Moalbual | 2,500.00 | |||
| 39. | For the Guadalupe Elementary School, | |||
| Alegria | 2,500.00 | |||
| 40. | For the Lepanto Elementary School, Alegria | 2,500.00 | ||
| 41. | For the Cerdeña Elementary School, | |||
| Malabuyok | 2,500.00 | |||
| 42. | For the Salamanca Elementary School, | |||
| Ginatilan | 2,500.00 | |||
| 43. | For the reconstruction of the San Sebastian | |||
| Elementary School, Samboan | 2,500.00 | |||
| 44. | For the Talisay barrio school, Santander | 3,000.00 | ||
| 45. | For the reconstruction of the Daanlungsod | |||
| Elementary School, Oslob | 2,500.00 | |||
| 46. | For the reconstruction of the El Pardo Elementary | |||
| School, Boljoon | 2,500.00 | |||
| 47. | For the Becerril Elementary School, Boljoon | 2,500.00 | ||
| 48. | For the extension of the Ronda Elementary | |||
| School | 2,500.00 | |||
| 49. | For the Punay Elementary School, Aloguinsan | 2,500.00 | ||
| 50. | For the extension of the Talavera Elementary | |||
| School, Toledo | 1,000.00 | |||
| 51. | For the Abocayan Elementary School, Balamban | 2,000.00 | ||
| 52. | For the Busugun Elementary School, San | |||
| Remigio | 2,000.00 | |||
| 53. | For the Loyang Elementary School, San | |||
| Remigio | 2,000.00 | |||
| 54. | For the Paypay Elementary School, | |||
| Daanbantayan | 2,000.00 | |||
| 55. | For the Hagnaya Elementary School, | |||
| San Remigio | 2,000.00 | |||
| 56. | For the Medellin carpentry shop | 3,500.00 | ||
| 57. | For the completion of the Santa Fe | |||
| Elementary School | 2,000.00 | |||
| 58. | For the Maravilla Elementary School, Tuburan | 2,000.00 | ||
| 59. | For the Bateria Elementary School, | |||
| Daanbantayan | 2,000.00 | |||
| 60. | For the Calape Elementary School, | |||
| Daanbantayan | 2,000.00 | |||
| 61. | For the Doong Elementary School, | |||
| Daanbantayan | 1,500.00 | |||
| 62. | For the completion of the Asturias Home | |||
| Economics Building | 2,000.00 | |||
| 63. | For the additional rooms of Dumanjug | |||
| Intermediate School | 3,000.00 | |||
| 64. | For the Cogon Elementary School, Dumanjug | 2,500.00 | ||
| 65. | For the completion of Bitoon Elementary School, | |||
| Dumanjug | 1,000.00 | |||
| 66. | For additional rooms for Toledo Intermediate | |||
| School | 3,000.00 | |||
| 67. | For the Ibo Elementary School, Toledo | 2,500.00 | ||
| 68. | For the Jiloctog Elementary School, Barili | 2,500.00 | ||
| 69. | For the Patupat Elementary School, Barili | 2,500.00 | ||
| 70. | For additional rooms for the Cabcaban | |||
| Elementary School, Barili | 1,000.00 | |||
| 71. | For repair of Langin Elementary School, Ronda | 1,000.00 | ||
| 72. | For the reconstruction of Gabi barrio | |||
| school, Cordova | 2,500.00 | |||
| 73. | For the Construction of Kabangkalan | |||
| Elementary School, Mandawe | 2,500.00 | |||
| COTABATO | ||||
| 1. | For the Kinimi school of Awang district | P2,500.00 | ||
| DAVAO | ||||
| 1. | For the construction of the Sta. Ana | |||
| Elementary School | 2,000.00 | |||
| 2. | For the construction of the elementary | |||
| School of Tigatto | 2,000.00 | |||
| ILOCOS NORTE | ||||
| 1. | For the Sarrat Home Economics Building | 3,000.00 | ||
| 2. | For the Dademan school, Pasuquin | 1,000.00 | ||
| 3. | For the Dibua school, Laoag | 1,000.00 | ||
| 4. | For the Navotas school, Laoag | 2,000.00 | ||
| 5. | For the Zamboanga school, Laoag | 1,000.00 | ||
| 6. | For the Buttong school, Laoag | 1,000.00 | ||
| 7. | For the Libnawan school, Piddig | 1,000.00 | ||
| 8. | For the Balacad school, Laoag | 1,000.00 | ||
| 9. | For the school of La Paz, Laoag | 1,000.00 | ||
| 10. | For the school of San Antonio, Sarrat | 1,000.00 | ||
| 11. | For the Baruyan barrio school, Bangui | 1,000.00 | ||
| 12. | For the Caooacan barrio school, Laoag | 1,000.00 | ||
| 13. | For the Magadang school, Piddig | 2,000.00 | ||
| 14. | For the Tanap school, Burgos | 1,000.00 | ||
| 15. | For the home economics and shop | |||
| school, Pasuquin | 1,500.00 | |||
| 16. | For the Pagudpud Elementary School | 1,000.00 | ||
| 17. | For the Polangi Elementary School | 1,000.00 | ||
| 18. | For the Cadaratan Elementary School, | |||
| Bacarra | 1,000.00 | |||
| 19. | For the Barat Elementary School, Burgos | 500.00 | ||
| 20. | For the construction of the Badoc Domestic | |||
| Science Building | 1,000.00 | |||
| 21. | For Pagsanaan barrio school, Badoc | 500.00 | ||
| 22. | For the Mabusag barrio school, Badoc | 500.00 | ||
| 23. | For the Caraitan barrio school, Badoc | 500.00 | ||
| 24. | For the San Mateo barrio school, Batac | 1,000.00 | ||
| 25. | For the Quiling barrio school, Batac | 500.00 | ||
| 26. | For the Culú barrio school, Batac | 500.00 | ||
| 27. | For the Bawa barrio school, Batac | 1,000.00 | ||
| 28. | For the Cubul barrio school, Batac | 500.00 | ||
| 29. | For the Tabtabangan barrio school, Banna | 1,000.00 | ||
| 30. | For the Lading barrio school, Banna | 500.00 | ||
| 31. | For the Pias barrio school, Currimao | 500.00 | ||
| 32. | For the Dimmanga barrio school, Currimao | 500.00 | ||
| 33. | For the Sidiran barrio school, Dingras | 500.00 | ||
| 34. | For the Alabaaan barrio school, Dingras | 500.00 | ||
| 35. | For the Nueva Era Central School | 500.00 | ||
| 36. | For the Suba barrio school, Paoay | 1,000.00 | ||
| 37. | For the Nalasin barrio school, Paoay | 500.00 | ||
| 38. | For the Bacsil barrio school, Paoay | 500.00 | ||
| 39. | For the Cabarcan barrio school, Pinili | 500.00 | ||
| 40. | For the Nagtrigoan barrio school, Pinili | 500.00 | ||
| 41. | For the Pusol barrio school, Pinili | 500.00 | ||
| 42. | For the Catuguing barrio school, San Nicolas | 1,000.00 | ||
| 43. | For the Bagobago barrio school Solsona | 500.00 | ||
| 44. | Morong school, Badoc | 500.00 | ||
| 45. | For the Pasoc Elementary School, Badoc | 500.00 | ||
| 46. | For the Home Economics Building, | |||
| municipality of Batac | 1,500.00 | |||
| 47. | For the Naguirangan Elementary School, Batac | 500.00 | ||
| 48. | For the Maglaoi Elementary School, Currimao | 500.00 | ||
| 49. | For the Suyo Elementary School, Dingras | 500.00 | ||
| 50. | For the Sagpatan Elementary School, Dingras | 500.00 | ||
| 51. | For the Pugaoan Elementary School, Pinili | 500.00 | ||
| 52. | For the San Nicolas, Payas barrio school | 500.00 | ||
| 53. | For the Maananting school, Solsona | 500.00 | ||
| 54. | For the Barcelona school, Solsona | 500.00 | ||
| 55. | For the Baboy Elementary School, Pasuquin | 1,000.00 | ||
| 56. | For the Central shop school building, Bangui | 1,000.00 | ||
| 57. | For the Parang-Sarrat Elementary School | 500.00 | ||
| 58. | For the Binaratan-Sarrat school | 500.00 | ||
| 59. | For the San Mateo Elementary School, Laoag | 1,000.00 | ||
| 60. | For the Bago Elementary School, Vintar | 1,000.00 | ||
| 61. | For the Tangaoan school, Piddig | 1,000.00 | ||
| 62. | For the Tononton school, Piddig | 1,000.00 | ||
| 63. | For the Agaga Elementary School, Burgos | 500.00 | ||
| 64. | For the Lanao Elementary School, Bangui | 1,000.00 | ||
| 65. | For the Cababaan Elementary School, Pasuquin | 1,000.00 | ||
| 66. | For the Burayuc Elementary School, Bangui | 500.00 | ||
| 67. | For the Santa Rosa Elementary School, Sarrat | 500.00 | ||
| 68. | For the Sagpatan Elementary School, Sarrat | 500.00 | ||
| 69. | For the home economics and shop buildings, | |||
| Bacarra | 500.00 | |||
| 70. | For the Gabu Elementary School, Laoag | 500.00 | ||
| 71. | For the Santa Maria Elementary School, Laoag | 500.00 | ||
| 72. | For the Barit Elementary School, Laoag | 500.00 | ||
| 73. | For the Tamdagan Elementary School, Vintar | 500.00 | ||
| 74. | For the Lub-nac Elementary School, Vintar | 500.00 | ||
| 75. | For the construction of the Laoag Central School | 3,000.00 | ||
| 76. | For the Banna school, Ilocos Norte | 2,000.00 | ||
| ILOCOS SUR | ||||
| 1. | For the repair and completion of the Mindoro | |||
| Elementary School | 2,000.00 | |||
| 2. | For the repair and completion of the Camangaan | |||
| Elementary School, Vigan | 1,500.00 | |||
| 3. | For the repair and completion of the Salindeg | |||
| Primary School, Vigan | 1,000.00 | |||
| 4. | For the repair and completion of the Bantay Laud | |||
| Primary School, Vigan | 500.00 | |||
| 5. | For the repair and completion of the Silang Primary | |||
| School, Bantay | 500.00 | |||
| 6. | For the repair and completion of the Santa Catalina | |||
| Primary School | 1,000.00 | |||
| 7. | For the repair and completion of the San Sebastian | |||
| Primary School, San Vicente | 500.00 | |||
| 8. | For the Pudoc Primary School, San Vicente | 500.00 | ||
| 9. | For the repair and completion of the San Ildefonso | |||
| Home Economics building | 500.00 | |||
| 10. | For the repair and completion of the Binalayangan | |||
| Primary School, Santo Domingo | 500.00 | |||
| 11. | For the repair and completion of the Puro Pingit | |||
| Primary School, Magsiñgal | 500.00 | |||
| 12. | For the repair and completion of the | |||
| Mansante Primary School, Magsiñgal | 500.00 | |||
| 13. | For the repair and completion of the | |||
| Saoang Primary School, Lapog | 500.00 | |||
| 14. | For the repair and completion of the | |||
| Namruangan Primary School, Cabugao | 500.00 | |||
| 15. | For the repair and completion of the | |||
| Masadag Primary School, Sinait | 500.00 | |||
| 16. | For the repair and completion of the | |||
| Callaguip Primary School, Caoayan | 500.00 | |||
| 17. | For the repair and completion of the | |||
| Pandan Elementary School, Caoayan | 1,000.00 | |||
| 18. | For the repair and completion of the | |||
| Ayusan Primary School, Vigan | 500.00 | |||
| 19. | For the repair and completion of the | |||
| Rugsuanan Primary School, Vigan | 500.00 | |||
| 20. | For the repair and completion of the | |||
| Nagsañgalan Primary School, Vigan | 500.00 | |||
| 21. | For the repair and completion of the | |||
| San Julian Sur Primary School, Vigan | 1,000.00 | |||
| 22. | For the repair and completion of the | |||
| Guimod Primary School, Bantay | 500.00 | |||
| 23. | For the repair and completion of the | |||
| Pa-ing Primary School, Bantay | 500.00 | |||
| 24. | For the repair and completion of the Ura | |||
| Primary School, Bantay | 500.00 | |||
| 25. | For the repair and completion of the Tayac | |||
| Primary School, Bantay | 1,000.00 | |||
| 26. | For the repair and completion of the Bulag | |||
| Primary School, Bantay | 1,000.00 | |||
| 27. | For the repair and completion of the Santa Catalina | |||
| Home Economics Building | 500.00 | |||
| 28. | For the repair and completion of the Cabittaoagan | |||
| Primary School, Santa Catalina | 500.00 | |||
| 29. | For the repair and completion of the San Vicente | |||
| Central School | 500.00 | |||
| 30. | For the repair and completion of the Maling | |||
| school, Bantay | 500.00 | |||
| 31. | For the repair and completion of the San | |||
| Vicente Home Economics Building | 500.00 | |||
| 32. | For the repair and completion of the | |||
| Pantay Tamurong school, Caoayan | 1,000.00 | |||
| 33. | For the repair and completion of the | |||
| Burgos Memorial School | 2,000.00 | |||
| 34. | For the repair and completion of the | |||
| Lapug Central School | 1,000.00 | |||
| 35. | For the repair and completion of the | |||
| Santa Catalina shop building | 500.00 | |||
| 36. | For the repair and completion of the | |||
| Lusoc Primary School, Santo Domingo | 500.00 | |||
| 37. | For the repair and completion of the Magsingal | |||
| Primary School | 500.00 | |||
| 38. | For the repair and completion of the San Vicente | |||
| shop building | 500.00 | |||
| 39. | For the repair and completion of the San Ildefonso | |||
| Central School | 500.00 | |||
| 40. | For the repair and completion of the Flora | |||
| Elementary School, Santo Domingo | 500.00 | |||
| 41. | For the repair and completion of the Sibel | |||
| Primary School, Santo Domingo | 500.00 | |||
| 42. | For the repair and completion of the Panay | |||
| Primary School, Magsiñgal | 500.00 | |||
| 43. | For the repair and completion of the Pagsanaan | |||
| Primary School, Magsiñgal | 500.00 | |||
| 44. | For the repair and completion of the Santa Monica | |||
| Primary School, Magsiñgal | 500.00 | |||
| 45. | For the repair and completion of the Silang | |||
| Primary School, Lapog | 500.00 | |||
| 46. | For the repair and completion of the Solotsolot | |||
| Primary School, Lapog | 500.00 | |||
| 47. | For the repair and completion of the Caellayan | |||
| Primary School, Cabugao | 1,000.00 | |||
| 48. | For the repair and completion of the Repaac | |||
| Primary School, Cabugao | 500.00 | |||
| 49. | For the repair and completion of the Catudaan | |||
| Primary School, Cabugao | 500.00 | |||
| 50. | For the repair and completion of the Maradodon | |||
| Primary School, Cabugao | 500.00 | |||
| 51. | For the repair and completion of the Pugos Primary | |||
| School, Sinait | 500.00 | |||
| 52. | For the repair and completion of the Zapat Primary | |||
| School, Sinait | 400.00 | |||
| 53. | For the repair and completion of the Dadalaguiten | |||
| school, Sinait | 400.00 | |||
| 54. | For the repair and completion of the Cabaranbanan | |||
| school, Sinait | 400.00 | |||
| 55. | For the repair and completion of the Binacud | |||
| school, Sinait | 400.00 | |||
| 56. | For the repair and completion of the Cadanglaan | |||
| school, Sinait | 400.00 | |||
| 57. | For the completion of the Santa Gabaldon | |||
| Elementary School | 1,000.00 | |||
| 58. | For the completion of the Revadavia Elementary | |||
| School, Narvacan | 500.00 | |||
| 59. | For the repair of the Santa Maria | |||
| Elementary School | 1,000.00 | |||
| 60. | For the completion of the Burgos | |||
| Elementary School | 500.00 | |||
| 61. | For the completion of the Tamorong Elementary | |||
| School, Candon | 1,000.00 | |||
| 62. | For the repair of the Balinacan Elementary | |||
| School, Candon | 500.00 | |||
| 63. | For the repair of the Baugen Elementary School | 500.00 | ||
| 64. | For the completion of the Luba Elementary | |||
| School, Santa Lucia | 500.00 | |||
| 65. | For the completion of the Sapang Elementary | |||
| School, Santa Lucia | 1,000.00 | |||
| 66. | For the completion of the Santa Cruz Central | |||
| Elementary School | 1,000.00 | |||
| 67. | For the completion of the San Antonio Elementary | |||
| School, Narvacan | 500.00 | |||
| 68. | For the Caoayan Central School | 3,000.00 | ||
| 69. | For the completion and repair of the | |||
| Bungro Primary School, Cabugao | 1,000.00 | |||
| 70. | For the completion and repair of the Sinait | |||
| Intermediate School | 1,000.00 | |||
| 71. | For the Puro Elementary School, Caoayan | 2,000.00 | ||
| 72. | For the Paypayad barrio school, Candon | 1,000.00 | ||
| 73. | For the construction of the Patpata barrio | |||
| school, Candon | 2,000.00 | |||
| ILOILO | ||||
| 1. | For the Talagutao Elementary School, | |||
| San Joaquin | 5,000.00 | |||
| 2. | For the Lumbuyan Elementary School, | |||
| San Joaquin | 3,000.00 | |||
| 3. | For the Cataan Elementary School, | |||
| San Joaquin | 4,000.00 | |||
| 4. | For the Bagumbayan Elementary School, | |||
| San Joaquin | 3,000.00 | |||
| 5. | For the Ticdalan Elementary School, Miagao | 4,000.00 | ||
| 6. | For the Santa Barbara Elementary | |||
| School, Igbaras | 3,000.00 | |||
| 7. | For the Nalundan Elementary School, | |||
| Guimbal | 4,000.00 | |||
| 8. | For the Nahapay Elementary School, Guimbal | 4,000.00 | ||
| 9. | For the Trapiche Elementary School, Oton | 5,000.00 | ||
| 10. | For the construction of additional rooms in | |||
| the Arevalo Elementary School | 5,000.00 | |||
| 11. | For the repair or reconstruction of the Dingle | |||
| Intermediate School | 3,500.00 | |||
| 12. | For the construction of Pototan Home | |||
| Economics Building | 2,500.00 | |||
| 13. | For the Cabudian Elementary School, Dueñas | 3,500.00 | ||
| 14. | For the San Fernando Elementary | |||
| School, Carles | 2,000.00 | |||
| 15. | For the completion of the Bagacay Elementary | |||
| School, San Dionisio | 500.00 | |||
| 16. | Repair and completion of the elementary school of | |||
| Cabugao, Santa Barbara, Iloilo | 500.00 | |||
| 17. | Repair and completion of the elementary school of | |||
| Calaboa, Santa Barbara, Iloilo | 250.00 | |||
| 18. | Repair and completion of the elementary school of | |||
| Dawis, Lucena, Santa Barbara, Iloilo | 500.00 | |||
| 19. | Repair and completion of the elementary school of | |||
| Talanghauan, Santa Barbara, Iloilo | 250.00 | |||
| 20. | Repair and completion of the elementary school of | |||
| Badiang, Lucena, Santa Barbara, Iloilo | 500.00 | |||
| 21. | Repair and completion of the elementary school of | |||
| Santa Barbara, Iloilo | 1,000.00 | |||
| 22. | Repair and completion of the elementary school of | |||
| Jilicuoun, Lucena, Santa Barbara | 500.00 | |||
| 23. | Repair and completion of elementary school of | |||
| Zarraga, Santa Barbara, Iloilo | 1,000.00 | |||
| 24. | Repair and completion of the elementary school of | |||
| Lucena, Santa Barbara, Iloilo | 1,000.00 | |||
| 25. | Repair and completion of the elementary school of | |||
| Manhayang, Santa Barbara, Iloilo | 500.00 | |||
| 26. | For the construction of elementary school | |||
| building for the barrio of Amorogtong, | ||||
| municipality of Igbaras | 2,000.00 | |||
| 27. | For the construction of elementary school | |||
| building for the municipality of Leon | 2,000.00 | |||
| 28. | For the construction of the primary school | |||
| building in the barrio of Bingauan, | ||||
| municipality of Calinog | 2,000.00 | |||
| 29. | For the construction of elementary school | |||
| building in the barrio of Lemery, | ||||
| municipality of Sara | 2,000.00 | |||
| 30. | For the construction of a primary school | |||
| building in the barrio of Binaba-an, | ||||
| Lambuano | 2,000.00 | |||
| 31. | For the continuation of the construction of | |||
| school building in the municipality of | ||||
| Calinog | 2,000.00 | |||
| 32. | For the elementary school building in the | |||
| barrio of Batad, Balasan | 2,000.00 | |||
| ISABELA | ||||
| 1. | For the elementary school of Carulay, Echague | 500.00 | ||
| 2. | For the elementary school of Camarag, Echague | 500.00 | ||
| 3. | For the elementary school of Malitao, Echague | 500.00 | ||
| 4. | For the Addalam elementary School, Jones | 1,000.00 | ||
| 5. | For the Disimpit Elementary School, Jones | 500.00 | ||
| 6. | For the Dibuluan Elementary School, Jones | 1,000.00 | ||
| 7. | For the Masaya Elementary School, Jones | 400.00 | ||
| 8. | For the Gordon Elementary School, Santiago | 1,500.00 | ||
| 9. | For the Oscaris Elementary School, Santiago | 400.00 | ||
| 10. | For the Pissay Elementary School, Angadanan | 300.00 | ||
| 11. | For Bunnay Elementary School, Angadanan | 300.00 | ||
| 12. | For Angadanan Viejo Elementary School, | |||
| Angadanan | 300.00 | |||
| 13. | For the Marasat Elementary School, Cauayan | 300.00 | ||
| 14. | For the Salinungan Elementary School, Cauayan | 300.00 | ||
| 15. | For the Cabatuan Elementary School, Cauayan | 2,500.00 | ||
| 16. | For the Reyna Mercedes School, Reyna | |||
| Mercedes | 500.00 | |||
| 17. | For the Awitan school, San Pablo | 2,000.00 | ||
| 18. | For the construction of the Tumawini school | 2,000.00 | ||
| 19. | For the construction of Cubag school, Cabagon | 1,500.00 | ||
| 20. | For the construction of Mabini school, Gamu | 1,500.00 | ||
| 21. | For the construction of the Naguilian school | 1,200.00 | ||
| 22. | For the construction of San Isidro Elementary | |||
| School, Santa Maria | 3,000.00 | |||
| LAGUNA | ||||
| 1. | For the construction of one room in the | |||
| Mamatid Elementary School, Cabuyao | 1,500.00 | |||
| 2. | For the completion of the Linga Elementary | |||
| School, Calamba | 1,000.00 | |||
| 3. | For the construction of the elementary school | |||
| of Los Baños | 2,000.00 | |||
| 4. | For the completion of the Noli Elementary | |||
| School, San Pablo | 3,000.00 | |||
| 5. | For the San Buenaventura barrio | |||
| school, Luisiana | 1,000.00 | |||
| 6. | For the completion of Taal Elementary | |||
| School, Taal, Pakil | 3,000.00 | |||
| 7. | For the general repairs of the Tranca | |||
| Primary School building in Bay | 1,000.00 | |||
| 8. | For the completion of the Luisiana Elementary | |||
| School, Luisiana | 10,000.00 | |||
| 9. | For the construction of one additional room | |||
| in the Bukal Elementary School, Cavinti | 1,500.00 | |||
| 10. | For the repair and painting of the Pagsanjan | |||
| Elementary School | 500.00 | |||
| 11. | For the completion of Suba school, Majayjay | 500.00 | ||
| 12. | For the Talaongan school, Cavinti | 1,000.00 | ||
| 13. | Banco school, Cavinti | 500.00 | ||
| LANAO | ||||
| 1. | For the construction of Pagalungan Elementary | |||
| School, Ramain | 2,000.00 | |||
| 2. | For the construction of the Panalawan | |||
| Elementary School, Ramain | 2,000.00 | |||
| LA UNION | ||||
| 1. | For the construction of the Lingsat Home | |||
| Economics Building, San Fernando | 2,000.00 | |||
| 2. | For the construction of the central school | |||
| building of Bangar, La Union | 10,000.00 | |||
| 3. | For the construction of an additional room | |||
| in the Pagudpud Elementary School, | ||||
| San Fernando | 2,000.00 | |||
| 4. | For the construction of the Luna Home | |||
| Economics Building | 4,000.00 | |||
| 5. | For the completion of the Sinapangan | |||
| Elementary School, Balaoan | 1,000.00 | |||
| 6. | For the completion of the Butubut Elementary | |||
| School, Balaoan | 1,000.00 | |||
| 7. | For the completion of the Bitalag Elementary | |||
| School, Bacnotan | 1,000.00 | |||
| 8. | For the completion of the Caggao Elementary | |||
| School, Bangar | 1,000.00 | |||
| 9. | For the completion of the Luzong Elementary | |||
| School, Bangar | 2,000.00 | |||
| 10. | For the completion of the School Shop central | |||
| elementary school of San Fernando | 1,000.00 | |||
| 11. | For the School Shop, central elementary | |||
| school of Bangar | 2,000.00 | |||
| 12. | For the construction of two additional rooms in | |||
| the San Fernando Intermediate School | 4,000.00 | |||
| 13. | For the repair of the Sta. Teresa Elementary | |||
| School, Tubao | 2,000.00 | |||
| 14. | For the construction of the Gusing Elementary | |||
| School, Naguilian | 2,000.00 | |||
| 15. | For the repair of the Guesset Elementary | |||
| School, Naguilian | 2,000.00 | |||
| 16. | For the construction of the Magungunay | |||
| Elementary School, Naguilian | 2,000.00 | |||
| 17. | For the construction of the Bal-lay Elementary | |||
| School, Bauang | 2,000.00 | |||
| 18. | For the construction of the Wenceslao | |||
| Elementary School, Caba | 3,000.00 | |||
| 19. | For the repair of the Sto. Tomas | |||
| Elementary School | 1,000.00 | |||
| 20. | For the completion of the Udiao Elementary | |||
| School, Rosario | 1,000.00 | |||
| LEYTE | ||||
| 1. | For the construction of the Sabang Elementary | |||
| School, Palompon | 2,000.00 | |||
| 2. | For the Matag-ob Elementary School, Palompon | 2,000.00 | ||
| 3. | For the Culaba Elementary School, Caibiran | 2,000.00 | ||
| 4. | For the Bohol Elementary School, Caibiran | 2,000.00 | ||
| 5. | For the Maripipi Domestic Science Building | 2,000.00 | ||
| 6. | For the Cawayan Domestic Science Building | 2,000.00 | ||
| 7. | For the Portobello Elementary School, Merida | 2,000.00 | ||
| 8. | For the Bosale Elementary School, Biliran | 2,000.00 | ||
| 9. | For the Mahalit Elementary School, Merida | 2,000.00 | ||
| 10. | For the repair of the Cabucgayan Elementary | |||
| School, Biliran | 500.00 | |||
| 11. | For the repair of the Gotosan Elementary | |||
| School, Calubian | 500.00 | |||
| 12. | For the repair of the Villalon Elementary | |||
| School, Calubian | 500.00 | |||
| 13. | For the repair of the Villahermosa Elementary | |||
| School, Calubian | 500.00 | |||
| 14. | For the repair of the Villanueva Elementary | |||
| School, Calubian | 500.00 | |||
| 15. | For the repair of the Quiot Elementary | |||
| School, Merida | 500.00 | |||
| 16. | For the repair of the Lico Elementary | |||
| School, Naval | 500.00 | |||
| 17. | For the repair of the Jamuraon | |||
| Elementary School, Naval | 500.00 | |||
| 18. | For the construction of the Bantiqui Elementary | |||
| School, Merida | 2,000.00 | |||
| 19. | For the construction of the Tolingon Elementary | |||
| School, Merida | 2,000.00 | |||
| 20. | For the construction of two additional rooms | |||
| in the Ormoc Elementary School | 4,000.00 | |||
| 21. | For the construction of one additional room in the | |||
| Lao Elementary School, Ormoc | 1,500.00 | |||
| 22. | For the repair of the Dolores Elementary | |||
| School, Ormoc | 500.00 | |||
| 23. | For the Mabini Elementary School, Ormoc | 2,000.00 | ||
| 24. | For the Esperanza Elementary School, | |||
| Inopacan | 2,000.00 | |||
| 25. | For the construction of additional rooms in the | |||
| Hiloñgos Elementary School | 4,000.00 | |||
| 26. | For the Baliw Elementary School Hiloñgos | 1,000.00 | ||
| 27. | For the Sta. Cruz Elementary School, Sogod | 2,500.00 | ||
| 28. | For the Binit Elementary School, Pintuyan | 2,000.00 | ||
| 29. | For the Dongon Elementary School, Maasin | 2,000.00 | ||
| 30. | For the San Rafael Elementary School, Maasin | 1,500.00 | ||
| 31. | For the Anahawan Central School | 2,500.00 | ||
| 32. | For the San Bernardo Elementary | |||
| School, Macrohon | 2,000.00 | |||
| 33. | For the Padre Burgos Elementary | |||
| School, Malitbog | 5,000.00 | |||
| 34. | For the enlargement of the Flor de Lis | |||
| Elementary School, Macrohon | 2,000.00 | |||
| 35. | For the Ichon Elementary School, Macrohon | 2,000.00 | ||
| 36. | For the Concepcion Elementary School, | |||
| Malitbog | 2,000.00 | |||
| 37. | For the Hingatunggan Elementary | |||
| School, Hinunañgan | 2,000.00 | |||
| 38. | For the construction of the Cogon | |||
| Elementary School, Palo | 2,000.00 | |||
| 39. | For the construction of one additional room in | |||
| Santa Fe Elementary School, Palo | 1,500.00 | |||
| 40. | For the construction of two additional rooms | |||
| in the Tolosa Elementary School | 3,000.00 | |||
| 41. | For the construction of the San Fernando | |||
| Elementary School, Tacloban | 3,500.00 | |||
| 42. | For the construction of the Picas Elementary | |||
| School, Abuyog | 2,000.00 | |||
| 43. | For the construction of the Rizal Elementary | |||
| School, Babatñgon | 2,000.00 | |||
| 44. | For the construction of one additional room | |||
| in the Tarragona Elementary School, Abuyog | 1,000.00 | |||
| 45. | Almeria Carpentry School, Kawayan | 2,000.00 | ||
| 46. | Caibiran Domestic Science School | 3,000.00 | ||
| 47. | Repair of the Talajid school | 500.00 | ||
| 48. | Repair of the Madao barrio school, Kawayan | 500.00 | ||
| 49. | Calubian Central School | 2,000.00 | ||
| 50. | For the Domestic Science Building in Palo | 2,000.00 | ||
| 51. | For the school building in Sua-Agay-ay, Cabalian | 1,000.00 | ||
| 52. | For the school building in Himbangan, Cabalian | 1,000.00 | ||
| 53. | For the school building in Cansirong, Lunas, | |||
| Baugo, Maasin | 1,000.00 | |||
| 54. | For the Home Economics Building in Abuyog | 1,000.00 | ||
| 55. | For the school building in Cogon, Abuyog | 1,000.00 | ||
| 56. | For the school building in Gigantangan, Naval | 2,000.00 | ||
| 57. | For the school building in Daja, San Isidro | 2,000.00 | ||
| 58. | For the school building in Inasuyan, Caibiran | 1,000.00 | ||
| 59. | For the school building in Talibong, Caibiran | 1,000.00 | ||
| 60. | For the school building in Cahandugan, Jaro | 3,000.00 | ||
| 61. | For the completion of the Liberty Elementary | |||
| School, Dulag | 1,000.00 | |||
| 62. | For the construction of the San Isidro Elementary | |||
| School, Alang-Alang | 2,000.00 | |||
| 63. | For the construction of the Pateta Elementary | |||
| School, Alang-Alang | 2,000.00 | |||
| 64. | For the construction of the Anibungon | |||
| Elementary School, Jaro | 2,000.00 | |||
| 65. | For the construction of the Sta. Ana | |||
| Elementary School, La Paz | 4,000.00 | |||
| MANILA | ||||
| 1. | For the Emilio Jacinto Elementary School | 6,000.00 | ||
| 2. | For the construction of the Santa Ana Home | |||
| Economics Building | 2,500.00 | |||
| 3. | For the construction of the Bonifacio Elementary | |||
| School Industrial Arts Shop | 2,500.00 | |||
| 4. | For the extension of the Zamora Elementary | |||
| School, Pandacan | 2,500.00 | |||
| 5. | For the construction of the Gomez School Home | |||
| Economics Building | 2,000.00 | |||
| 6. | For the construction of the Legarda School Home | |||
| Economics Building | 2,000.00 | |||
| 7. | For the construction of the Tondo Intermediate | |||
| School, Tondo | 8,000.00 | |||
| MARINDUQUE | ||||
| 1. | For the completion and repair of the Kawit | |||
| Elementary School, Boac | 1,000.00 | |||
| 2. | For the completion of the Bugnayan Elementary | |||
| School, Gasan | 500.00 | |||
| 3. | For the Dawis Elementary School, Gasan | 500.00 | ||
| 4. | For the Jupi Elementary School, Santa Cruz | 1,000.00 | ||
| 5. | For the repair of the Santa Cruz | |||
| Intermediate Building | 1,000.00 | |||
| 6. | For the completion of the Santa Cruz | |||
| shop building | 1,500.00 | |||
| 7. | For the completion of the Buyabod | |||
| Elementary School | 1,000.00 | |||
| 8. | For the completion of the Masaguisi | |||
| Elementary School | 1,000.00 | |||
| 9. | For the Polo Elementary School, Santa Cruz | 1,000.00 | ||
| 10. | For the Maniuaya Elementary School, | |||
| Santa Cruz | 1,000.00 | |||
| 11. | For the Mompong Elementary School, Santa Cruz | 1,000.00 | ||
| 12. | For the Mogpog shop building | 3,000.00 | ||
| 13. | For the Balanakan Elementary School | 1,000.00 | ||
| 14. | For the repair of the Torrijos | |||
| Elementary School | 1,000.00 | |||
| 15. | For the Torrijos shop building | 1,500.00 | ||
| 16. | For the Bagtiñgon Elementary School, | |||
| Buenavista | 500.00 | |||
| 17. | For the Malibago Elementary School, Torrijos | 500.00 | ||
| 18. | For the repair of the Mogpog | |||
| Elementary School | 1,000.00 | |||
| 19. | For the improvement and repair of the | |||
| shop building, Gasan | 1,000.00 | |||
| 20. | For the Aturan Elementary School, Santa Cruz | 500.00 | ||
| 21. | For the Dolores Elementary School, Santa Cruz | 500.00 | ||
| MASBATE | ||||
| 1. | For the Malbug Elementary School, Milagros | 1,500.00 | ||
| 2. | For the completion of the San Jacinto | |||
| primary school | 2,000.00 | |||
| 3. | For the completion of the school building | |||
| Plan No. 4, Uson, Dimasalang | 500.00 | |||
| 4. | For the construction of a carpentry shop in | |||
| Uson, Dimasalang | 1,000.00 | |||
| 5. | For the construction of a carpentry shop | |||
| in Baleno, Aroroy | 1,000.00 | |||
| MINDORO | ||||
| 1. | For the construction of the Vigo Home | |||
| Economics Building, Lubang | P1,500.00 | |||
| 2. | For the reconstruction of the Lo-oc | |||
| school building | 2,000.00 | |||
| 3. | For the repair of the Talatao Elementary | |||
| School | 500.00 | |||
| 4. | For the repair of the Agkawayan | |||
| Elementary School, Lo-oc | 1,000.00 | |||
| 5. | For the completion of the central school | |||
| in the municipality of Pinamalayan | 2,000.00 | |||
| 6. | For the reconstruction of the elementary | |||
| school building in the municipality of | ||||
| Mamburao | 2,000.00 | |||
| 7. | For the construction of a barrio school in | |||
| Lumang Bayan, municipality of Paluan | 2,000.00 | |||
| 8. | For the construction of the Calintaan | |||
| Elementary School, Sablayan | 1,000.00 | |||
| 9. | For the construction of the Baco | |||
| Elementary School | 2,000.00 | |||
| 10. | For the construction of the Mayabig | |||
| Elementary School, Baco | 500.00 | |||
| 11. | For the completion of the Naujan | |||
| Elementary School | 1,500.00 | |||
| 12. | For the repair of the Calaguimay Elementary | |||
| School, Naujan | 500.00 | |||
| 13. | For the construction of the Estrella Elementary | |||
| School, Naujan | 1,000.00 | |||
| 14. | For the construction of the Bolbog Elementary | |||
| School, Naujan | 500.00 | |||
| 15. | For the construction of the Bancoro Elementary | |||
| School, Naujan | 1,000.00 | |||
| 16. | For the construction of the Anuling Elementary | |||
| School, Pinamalayan | 1,000.00 | |||
| 17. | For the construction of the New Balete Elementary | |||
| School, Pinamalayan | 1,000.00 | |||
| MOUNTAIN PROVINCE | ||||
| 1. | For the repair of the Cervantes | |||
| Elementary School | 1,000.00 | |||
| 2. | For the repair of the Cervantes Home | |||
| Economics Cottage | 2,000.00 | |||
| 3. | For the repair of the Namip-pit Elementary | |||
| School, Ilocos Sur | 1,000.00 | |||
| 4. | For the Ableg Elementary School | |||
| Subprovince of Kalinga | 600.00 | |||
| 5. | For the Naneng Elementary School, | |||
| Subprovince of Kalinga | 500.00 | |||
| 6. | For the Toga Elementary School, | |||
| Subprovince of Kalinga | 500.00 | |||
| 7. | For the Taga Elementary School, | |||
| Subprovince of Kalinga | 700.00 | |||
| 8. | For the Cadaclan Elementary School, | |||
| Subprovince of Bontoc | 500.00 | |||
| 9. | For the Barlig Elementary School, | |||
| Subprovince of Bontoc | 500.00 | |||
| 10. | For the Maggok Elementary School, | |||
| Subprovince of Ifugao | 350.00 | |||
| 11. | For the Amduntog Elementary School, | |||
| Subprovince of Ifugao | 350.00 | |||
| 12. | For the repair of the Cabugao Elementary School | 500.00 | ||
| 13. | For the repair of the Lubuagan Elementary School | 500.00 | ||
| 14. | For the repair of the Taga Elementary School | 400.00 | ||
| 15. | For the repair of the Maneng Elementary School | 400.00 | ||
| 16. | For the repair of the Natonin Elementary School | 400.00 | ||
| 17. | For the repair of the Bontoc Elementary School | 400.00 | ||
| 18. | For the repair of the Besao Elementary School | 600.00 | ||
| 19. | For the repair of the Burnay Elementary School | 400.00 | ||
| 20. | For the repair of the Hungduan Elementary School | 400.00 | ||
| NUEVA ECIJA | ||||
| 1. | For the repair and reconstruction of Concepcion | |||
| barrio school, Cabiao | 2,000.00 | |||
| 2. | For the repair and reconstruction of San Julian | |||
| barrio school, Cabiao | 2,000.00 | |||
| 3. | For the San Francisco barrio school, | |||
| San Antonio | 500.00 | |||
| 4. | For the repair and improvement of the Bilolo | |||
| Elementary School, Zaragosa | 300.00 | |||
| 5. | For the repair of the Carmen Elementary | |||
| School, Zaragosa | 200.00 | |||
| 6. | For the completion of the Cama Juan | |||
| Elementary School, San Antonio | 300.00 | |||
| 7. | For the improvement of the Papaya barrio | |||
| school, San Antonio | 500.00 | |||
| 8. | For the repair of the Panbiñgan Elementary | |||
| School, San Antonio | 300.00 | |||
| 9. | For the repair of the San Mariano Elementary | |||
| School, San Antonio | 300.00 | |||
| 10. | For the repair of the Santa Monica Elementary | |||
| School, Aliaga | 300.00 | |||
| 11. | For the repair and improvement of the Sabit | |||
| Elementary School, Cuyapo | 300.00 | |||
| 12. | For the repair of the San Carlos | |||
| Elementary School, Aliaga | 300.00 | |||
| 13. | For the repair and improvement of the | |||
| Baloy Elementary School, Cuyapo | 300.00 | |||
| 14. | For the repair and improvement of the General | |||
| Luna Elementary School, Talavera | 300.00 | |||
| 15. | For the repair and improvement of the | |||
| Pinagpanaan school, Talavera | 300.00 | |||
| 16. | For the repair and improvement of the | |||
| Marawa Elementary School, Jaen | 500.00 | |||
| 17. | For the repair and improvement of the Rangayan | |||
| Elementary School, Muñoz | 300.00 | |||
| 18. | For the repair of the Linglingay Elementary | |||
| School, Muñoz | 300.00 | |||
| 19. | For the construction of the Concepcion | |||
| Elementary School, Zaragosa | 400.00 | |||
| 20. | For the repair and completion of the Capitan | |||
| Berong Elementary School, Guimba | 300.00 | |||
| 21. | For the repair of the Agupalo Elementary | |||
| School, Lupa | 200.00 | |||
| 22. | For the repair of the Udiao Elementary | |||
| School, Lupao | 300.00 | |||
| 23. | For the repair of the Maligaya Elementary | |||
| School, Muñoz | 300.00 | |||
| 24. | For the repair of the Santa Maria | |||
| Elementary School, Licab | 200.00 | |||
| 25. | For the San Anton Elementary School, | |||
| San Leonardo | 3,500.00 | |||
| 26. | For the San Nicolas Elementary School, Gapan | 1,000.00 | ||
| 27. | For the San Isidro Malapit Elementary School, | |||
| San Isidro | 1,000.00 | |||
| 28. | For the Bicos Elementary School, Rizal | 3,000.00 | ||
| 29. | For the Agbanawag Elementary School, Rizal | 2,500.00 | ||
| 30. | For the Picaleon Elementary School, Boñgabon | 1,500.00 | ||
| 31. | For the Santo Cristo Elementary School, Gapan | 2,500.00 | ||
| 32. | For the Licab school, Nueva Ecija | 2,000.00 | ||
| 33. | For the Maligaya school, Muñoz | 1,000.00 | ||
| 34. | For the Pulosapis school, Muñoz | 1,000.00 | ||
| NUEVA VIZCAYA | ||||
| 1. | For the repair of the old high-school building | |||
| actually used as the Bayombong | ||||
| Intermediate Building | 4,000.00 | |||
| OCCIDENTAL MISAMIS | ||||
| 1. | For the construction of the Tangub | |||
| Elementary School | 8,000.00 | |||
| 2. | For the construction of the Gango | |||
| Elementary School, Misamis | 2,000.00 | |||
| 3. | For the completion of the Macabayao | |||
| school, Jimenez | 1,000.00 | |||
| 4. | For the completion of the Jimeñez | |||
| Elementary School | 3,000.00 | |||
| 5. | For the construction of the Burgos Elementary | |||
| School, Aloran | 2,500.00 | |||
| 6. | For the construction of the Maular Elementary | |||
| School, Aloran | 2,000.00 | |||
| 7. | For the construction of the Mobod Elementary | |||
| School, Oroquieta | 2,500.00 | |||
| 8. | For the Calamba Elementary School, Plaridel | 2,500.00 | ||
| 9. | For the completion of the Unidos Elementary | |||
| School, Plaridel | 1,000.00 | |||
| 10. | For the completion of the Tudela | |||
| Elementary School | 3,000.00 | |||
| 11. | For the repair of the Baliañgao | |||
| Elementary School | 2,000.00 | |||
| 12. | For the construction of the Lo-oc Elementary | |||
| School, Plaridel | 2,000.00 | |||
| 13. | For the construction of the Lupagan Elementary | |||
| School, Clarin | 1,000.00 | |||
| 14. | For the construction of the Gata | |||
| Elementary School, Clarin | 1,000.00 | |||
| 15. | For the Malatuban Elementary School, | |||
| Lopez-Jaena | 1,000.00 | |||
| 16. | For the Manincol Elementary School, Misamis | 1,000.00 | ||
| 17. | For the Tangob shop building | 1,000.00 | ||
| 18. | For the Malibacson Elementary School, Jimenez | 500.00 | ||
| 19. | For the Lupagan Elementary School, Baliangao | 500.00 | ||
| 20. | For the construction of the Kinañgay | |||
| barrio school, Clarin | 1,000.00 | |||
| 21. | For the construction of the Kanibuñgan barrio | |||
| school, Clarin | 1,000.00 | |||
| 22. | For the construction of the Bolinsong barrio | |||
| school, Tangob | 1,000.00 | |||
| 23. | For the construction of the Villaflor barrio | |||
| school, Oroquieta | 1,000.00 | |||
| 24. | For the construction of the Binuañgan barrio | |||
| school, Oroquieta | 1,000.00 | |||
| ORIENTAL MISAMIS | ||||
| 1. | For the additional rooms in the Baliñgasag | |||
| Elementary School | 4,000.00 | |||
| 2. | For the completion of the Lagonglong | |||
| Elementary School, Baliñgasag | 2,000.00 | |||
| 3. | For the completion of the Agusan Elementary | |||
| School, Tagoloan | 2,000.00 | |||
| 4. | For the completion of the Maticao Elementary | |||
| School, Initao | 2,000.00 | |||
| 5. | For the Hubangon Home Economics | |||
| Building, Mambajao | 3,000.00 | |||
| 6. | For one additional room in the Salay | |||
| Elementary School | 2,000.00 | |||
| 7. | For the construction of the Sugbung-cogon | |||
| barrio school, Quinugitan | 1,000.00 | |||
| 8. | For the construction of the Mulogan barrio | |||
| school, Cagayan | 1,000.00 | |||
| 9. | For the construction of the Medina Home | |||
| Economics Building, Talisayan | 1,000.00 | |||
| 10. | For the construction of the Portulin barrio | |||
| school, Talisayan | 1,000.00 | |||
| 11. | For the construction of the Adubihid barrio | |||
| school, Cagayan | 1,000.00 | |||
| 12. | For the construction of the Gusa barrio | |||
| school, Cagayan | 1,000.00 | |||
| 13. | For the construction of the Libertad | |||
| barrio school, Initao | 1,000.00 | |||
| 14. | For the additional rooms in the Ipunan barrio | |||
| school, Cagayan | 1,000.00 | |||
| 15. | For the construction of the central | |||
| shop building, Cagayan | 1,000.00 | |||
| 16. | For the Initao Home Economics Building | 1,500.00 | ||
| 17. | For the Opol shop building, Cagayan | 1,500.00 | ||
| 18. | For the Agoho Home Economics | |||
| Building, Mambajao | 1,000.00 | |||
| 19. | For the Catarman Domestic Science Building | 500.00 | ||
| 20. | For the Salay Domestic Science Building | 1,000.00 | ||
| OCCIDENTAL NEGROS | ||||
| 1. | For the Hapitan Elementary School, | |||
| Escalante | 1,000.00 | |||
| 2. | For the Toboso Elementary School, | |||
| Escalante | 3,000.00 | |||
| 3. | For the Cadiz Elementary School | 2,000.00 | ||
| 4. | For the Cadiz Carpentry Shop | 2,000.00 | ||
| 5. | For the Daga Elementary School, Cadiz | 4,500.00 | ||
| 6. | For the Faraon Elementary School, Sagay | 4,500.00 | ||
| 7. | For the construction of the Atipuluan Elementary | |||
| School, Bago | 2,000.00 | |||
| 8. | For the construction of the Sibacao Elementary | |||
| School, San Enrique | 2,000.00 | |||
| 9. | For the construction of the Araal Elementary | |||
| School, La Carlota | 2,000.00 | |||
| 10. | For the construction of the Talisay | |||
| Elementary School | 3,000.00 | |||
| 11. | For the construction of the Murcia | |||
| Elementary School | 3,000.00 | |||
| 12. | For the construction of the Patic | |||
| Elementary School | 2,000.00 | |||
| 13. | For the construction of the Bacolod | |||
| Elementary School | 3,000.00 | |||
| 14. | For the repair of the Sagasa | |||
| Elementary School, Bago | 1,500.00 | |||
| 15. | For the construction of the Ayungon | |||
| Elementary School, Valladolid | 2,000.00 | |||
| 16. | For the construction of the Kinuba-an Elementary | |||
| School, Cawayan | 4,000.00 | |||
| 17. | For the construction of a school building in | |||
| Guilungan, Cawayan | 2,000.00 | |||
| 18. | For the construction of a school building in Vista | |||
| Alegre, Ilog | 2,000.00 | |||
| 19. | For the completion of the Clining Elementary | |||
| School, Cawayan | 1,000.00 | |||
| 20. | For the construction of the Hinigaran Domestic | |||
| Science Building | 1,000.00 | |||
| 21. | For the Magallon Primary School, Isabela | 3,000.00 | ||
| ORIENTAL NEGROS | ||||
| 1. | For the Batingil Elementary School, Dumaguete | P1,000.00 | ||
| 2. | For the Mangnao Elementary School, Dumaguete | 1,000.00 | ||
| 3. | For the Calamba Barrio School, Guihulñgan | 1,000.00 | ||
| 4. | For the Pulang Tubig Elementary School, | |||
| Dumaguete | 1,000.00 | |||
| 5. | For the Hilaitan barrio school, Guihulñgan | 1,000.00 | ||
| 6. | For the Ahong Elementary School, Sibulan | 1,000.00 | ||
| 7. | For the Buluk-Buluk Elementary School, | |||
| Dumaguete | 1,000.00 | |||
| 8. | For the Ayuquitan Viejo Elementary School | 1,000.00 | ||
| 9. | For the Bio-os Elementary School, Ayuquitan | 1,000.00 | ||
| 10. | For the Santa Cruz Elementary School, Tanjay | 1,000.00 | ||
| 11. | For the Polo Elementary School, Tanjay | 1,000.00 | ||
| 12. | For the Cambagyo Elementary School, Bais | 1,000.00 | ||
| 13. | For the Manjuyod Trade School | 1,000.00 | ||
| 14. | For the Malaga Elementary School, Manyugod | 1,000.00 | ||
| 15. | For the Campuyo Elementary School, | |||
| Manyugod | 1,000.00 | |||
| 16. | For the Lutay, Ba-o, Elementary School, | |||
| Tayasan | 1,000.00 | |||
| 17. | For the San Jose Elementary School, | |||
| La Libertad | 1,000.00 | |||
| 18. | For the Bancal Elementary School, | |||
| Jimalalud | 1,000.00 | |||
| 19. | For the Palimpinon Elementary School, | |||
| Luzuriaga | 2,000.00 | |||
| 20. | For the Po-o Elementary School, Lazi | 2,000.00 | ||
| 21. | For the Isugan Elementary School, Bacong | 2,000.00 | ||
| 22. | For the Candapin Elementary School, Maria | 2,000.00 | ||
| 23. | For the Bamban Elementary School, Siquijor | 5,000.00 | ||
| 24. | For the Tambisan Elementary School, San Juan | 2,000.00 | ||
| 25. | For the Lazi Central School | 2,000.00 | ||
| 26. | For the Balogo Elementary School, Luzuriaga | 2,000.00 | ||
| 27. | For the repair of the old Luzuriaga Central School | 1,000.00 | ||
| 28. | For the Zamboanguita Central School | 2,000.00 | ||
| 29. | For the Martilo barrio school, La Libertad | 1,000.00 | ||
| 30. | For the Minalonan barrio school, Maria | 3,000.00 | ||
| 31. | For the construction of the Tugaue Elementary | |||
| School, Dauin | 2,000.00 | |||
| 32. | For the Inalad Elementary School, Siaton | 2,000.00 | ||
| 33. | For the repair of the San Juan Central | |||
| School, Siaton | 1,000.00 | |||
| PALAWAN | ||||
| 1. | For the Coron Central School | 5,000.00 | ||
| 2. | For the construction of the Salvation Elementary | |||
| School, Coron | 2,000.00 | |||
| 3. | For the construction of the Mariñgian Elementary | |||
| School, Cuyo | 2,000.00 | |||
| 4. | For the construction of the Bisucay Elementary | |||
| School, Cuyo | 2,000.00 | |||
| 5. | For the construction of the Lubid Elementary | |||
| School, Cuyo | 2,000.00 | |||
| 6. | For the construction of the Taytay Domestic | |||
| Science School Building | 1,000.00 | |||
| 7. | For the construction of the Villafria Elementary | |||
| School Building, Agutaya | 1,500.00 | |||
| 8. | For the completion and repair of the Busuanga | |||
| Elementary School, Coron | 1,000.00 | |||
| 9. | For the construction of the Concepcion | |||
| Domestic Science Building, Coron | 1,000.00 | |||
| 10. | For the completion of the Del Pilar | |||
| Elementary School, Puerto Princesa | 1,000.00 | |||
| 11. | For the completion of the Bintuan | |||
| Elementary School, Coron | 1,000.00 | |||
| 12. | For the completion and repair of the | |||
| Dumaran Elementary School | 1,000.00 | |||
| 13. | For the construction of the Agutaya | |||
| Elementary School | 3,000.00 | |||
| 14. | For the construction of the Calandagan | |||
| Elementary School, Dumaran | 2,000.00 | |||
| 15. | For the repair of the Balala Elementary | |||
| School, Culion | 1,000.00 | |||
| 16. | For the construction of the Salogon Elementary | |||
| School, Brook's Point | 1,500.00 | |||
| PAMPANGA | ||||
| 1. | For the construction of the Lambac Elementary | |||
| School, Guagua | 2,000.00 | |||
| 2. | For the construction of the Bulacus Elementary | |||
| School, Masantol | 2,000.00 | |||
| 3. | For the repair of the Talba Elementary | |||
| School, Bacolor | 1,000.00 | |||
| 4. | For the repair of the Batang Elementary | |||
| School, Sexmoan | 500.00 | |||
| 5. | For the repair of the San Basilio Elementary | |||
| School, Santa Rita | 500.00 | |||
| 6. | For the construction or improvement of the | |||
| Santa Maria Elementary School, Minalin | 1,000.00 | |||
| 7. | For the construction of the Baliti-Telabastagan | |||
| Elementary School, San Fernando | 1,000.00 | |||
| 8. | For the repair or improvement of the Candating | |||
| Elementary School, Arayat | 750.00 | |||
| 9. | For the repair or improvement of the Batasan | |||
| Elementary School, Arayat | 250.00 | |||
| 10. | For the repair or improvement of the Arenas | |||
| Elementary School, Arayat | 750.00 | |||
| 11. | For the repair or improvement of the Lacmit | |||
| Elementary School, Arayat | 250.00 | |||
| 12. | For the repair or improvement of the Cauayan | |||
| Bugtong Elementary School, Candaba | 500.00 | |||
| 13. | For the repair or improvement of the Mapaniqui | |||
| Elementary School, Candaba | 500.00 | |||
| 14. | For the repair or improvement of the Balucuc | |||
| Elementary School, Apalit | 250.00 | |||
| 15. | For the repair or improvement of the San Nicolas | |||
| Elementary School, San Simon | 500.00 | |||
| 16. | For the repair or improvement of the Santa | |||
| Monica Elementary School, San Luis | 250.00 | |||
| 17. | For the repair or improvement of the San | |||
| Juan Elementary School, San Luis | 250.00 | |||
| 18. | For the repair or improvement of the Santa | |||
| Catalina Elementary School, San Luis | 250.00 | |||
| 19. | For the repair or improvement of the Santo | |||
| Domingo Elementary School, Mexico | 250.00 | |||
| 20. | For the repair or improvement of the Casinala | |||
| Elementary School, Apalit | 250.00 | |||
| 21. | For the elementary school, Santo Tomas | 1,000.00 | ||
| 22. | Construction of Macabebe Elementary School | 2,000.00 | ||
| 23. | Construction and repair of San Vicente-San | |||
| Francisco barrio school, Macabebe | 2,000.00 | |||
| 24. | Construction of Malusac barrio school, | |||
| Sexmoan | 2,000.00 | |||
| 25. | Completion of Caiñgin barrio school, | |||
| Masantol | 1,000.00 | |||
| 26. | Repair of Masantol Elementary School | 500.00 | ||
| 27. | Construction of Santa Maria barrio school, | |||
| Minalin, near Lourdes | 1,000.00 | |||
| 28. | Additional room of Minalin Elementary School | 1,000.00 | ||
| 29. | Completion of De la Paz school, San Simon | 1,000.00 | ||
| 30. | Construction of one additional room, San Simon | |||
| Elementary School | 2,000.00 | |||
| 31. | Repair of San Miguel school, San Simon | 1,000.00 | ||
| 32. | Completion of Dau barrio school, Mabalacat | 1,000.00 | ||
| 33. | Repair of school at Bical, Mabalacat | 500.00 | ||
| 34. | Repair and transfer of the elementary school from | |||
| Lacmit to Gatiawin, Arayat | 1,000.00 | |||
| 35. | Repair of Santa Lucia Elementary School, | |||
| Arayat | 500.00 | |||
| 36. | Repair of Baliti Elementary School, Arayat | 500.00 | ||
| 37. | Repair of Santo Rosario barrio school, | |||
| Magalang | 1,000.00 | |||
| 38. | Repair of San Agustin schoolhouse, Magalang | 500.00 | ||
| 39. | Construction of Santa Cruz barrio school, | |||
| Porac | 2,000.00 | |||
| 40. | Construction of Calsadang-bayu barrio | |||
| school, Porac | 2,000.00 | |||
| 41. | Construction of San Luis carpentry shop | 2,000.00 | ||
| 42. | Repair of Ebus barrio school, Guagua | 500.00 | ||
| 43. | Construction of Lara barrio school, | |||
| San Fernando | 2,000.00 | |||
| PANGASINAN | ||||
| 1. | For the completion of the San Vicente | |||
| Elementary School, Bani | 500.00 | |||
| 2. | For the construction of the Eguia | |||
| Elementary School, Dasol | 5,000.00 | |||
| 3. | For the completion of the Camagsingalan | |||
| Elementary School, Sual | 1,000.00 | |||
| 4. | For the construction of the Cayungaan | |||
| Elementary School, Agno | 2,000.00 | |||
| 5. | For the completion of the Lucap Elementary | |||
| School, Alaminos | 1,000.00 | |||
| 6. | For the completion of the Matalaba Elementary | |||
| School, Lingayen | 500.00 | |||
| 7. | For the completion of the Luna Elementary | |||
| School, Bolinao | 500.00 | |||
| 8. | For the completion of the Magalong Elementary | |||
| School, Mabini | 500.00 | |||
| 9. | For the completion of the Panacol Elementary | |||
| School, Aguilar | 500.00 | |||
| 10. | For the completion of the Toritori Elementary | |||
| School, Anda | 500.00 | |||
| 11. | For the completion of the Tonton Elementary | |||
| School, Lingayen | 500.00 | |||
| 12. | For the completion of the Bayambang Elementary | |||
| School, Infanta | 500.00 | |||
| 13. | For the completion of the Dulacao Elementary | |||
| School, Alaminos | 500.00 | |||
| 14. | For the completion of the Carot Elementary | |||
| School, Anda | 500.00 | |||
| 15. | For the construction of the Macabit | |||
| Elementary School, Bani | 500.00 | |||
| 16. | For the completion of the Concordia | |||
| Elementary School, Burgos | 500.00 | |||
| 17. | For the completion of the Tambobong | |||
| Elementary School, Dasol | 500.00 | |||
| 18. | For the completion of the Binabalian | |||
| Elementary School, Bolinao | 500.00 | |||
| 19. | For the completion of the Tondol | |||
| Elementary School, Anda | 500.00 | |||
| 20. | For the construction of the Naguelguel | |||
| Elementary School, Lingayen | 500.00 | |||
| 21. | For the barrio school of Babasit, Manaoag | 5,000.00 | ||
| 22. | For the Bugallon Elementary School, | |||
| Bugallon | 15,000.00 | |||
| 23. | For the Bulosan barrio school, Dagupan | 6,500.00 | ||
| 24. | For the barrio school of Palapar, Malasiqui | 2,000.00 | ||
| 25. | For the barrio school of Anonang, | |||
| San Fabian | 4,000.00 | |||
| 26. | For the barrio school of Aramal, San Fabian | 2,000.00 | ||
| 27. | For the construction of the Infanta | |||
| Elementary School | 8,000.00 | |||
| 28. | For the completion of the Dulag Elementary | |||
| School, Binmaley | 1,000.00 | |||
| 29. | For the reconstruction of the Gayaman | |||
| Elementary School, Binmaley | 1,500.00 | |||
| 30. | For the construction of the Bayabay | |||
| Lopez Elementary School, Binmaley | 1,500.00 | |||
| 31. | For the completion of the Caranglaan | |||
| Elementary School, Dagupan | 1,000.00 | |||
| 32. | For the completion of the Binloc Elementary | |||
| School, Dagupan | 1,000.00 | |||
| 33. | For the completion of the Bulusan Elementary | |||
| School to be known as "Don Guillermo de | ||||
| Venecia School," Dagupan | 1,000.00 | |||
| 34. | For the reconstruction of the Kasilagan | |||
| Elementary School, Mangatarem | 1,500.00 | |||
| 35. | For the completion of the Takipan | |||
| Elementary School, Mangatarem | 1,000.00 | |||
| 36. | For the reconstruction of the Cabarabuan | |||
| Elementary School, Mangatarem | 1,500.00 | |||
| 37. | For the completion of the Macarang | |||
| Elementary School, Mangatarem | 1,000.00 | |||
| 38. | For the completion of the Coliling | |||
| Elementary School, San Carlos | 1,000.00 | |||
| 39. | For the construction of the Basista | |||
| Elementary School, San Carlos | 5,000.00 | |||
| 40. | For the construction of the Talang Elementary | |||
| School, San Carlos | 1,500.00 | |||
| 41. | For the construction of the Pampang-Palaming | |||
| Elementary School, San Carlos | 1,500.00 | |||
| 42. | For the construction of the Cabueldatan Elementary | |||
| School, San Carlos | 1,500.00 | |||
| 43. | For the completion of the Agdao Elementary School, | |||
| San Carlos | 1,500.00 | |||
| 44. | For the construction of the Camambugan Elementary | |||
| School, Urbiztondo | 1,500.00 | |||
| 45. | For the construction of the Galarin Elementary | |||
| School, Urbiztondo | 1,500.00 | |||
| 46. | For the completion of the Malewar | |||
| Elementary School, Bayambang | 1,000.00 | |||
| 47. | For the barrio school of Apaya, Malasisiqui | 2,000.00 | ||
| 48. | For the completion of the Longos Elementary | |||
| School, San Fabian | 1,000.00 | |||
| 49. | For the completion of the Baloling Elementary | |||
| School, Mapandan | 1,000.00 | |||
| 50. | For the construction of the Patayac and Payas | |||
| Elementary Schools, Santa Barbara | 2,000.00 | |||
| 51. | For the completion of the Gueguesanguen | |||
| Elementary School, Mangaldan | 1,000.00 | |||
| 52. | For the completion of the Loqueb Elementary | |||
| School, Malasiqui | 1,000.00 | |||
| 53. | For the completion of the Don Pedro Elementary | |||
| School, Malasiqui | 1,500.00 | |||
| 54. | For the completion of the Bantayan Elementary | |||
| School, Mangaldan | 1,000.00 | |||
| 55. | For the completion of the Banaoang Elementary | |||
| School, Calasiao | 500.00 | |||
| 56. | For the completion of the Bansal Elementary | |||
| School, Santa Barbara | 1,000.00 | |||
| 57. | For the completion of the Maasin Elementary | |||
| School, Mangaldan | 1,000.00 | |||
| 58. | For the repair of the Santa Barbara | |||
| Elementary School | 1,000.00 | |||
| 59. | For the completion of the Bersamin Elementary | |||
| School, Alcala | 1,000.00 | |||
| 60. | For the completion of the San Pedro | |||
| Yli Elementary School, Alcala | 1,000.00 | |||
| 61. | For the improvement of the San Antonio | |||
| Elementary School, Santo Tomas | 500.00 | |||
| 62. | For the improvement of the Barañgobong | |||
| Elementary School, Villasis | 500.00 | |||
| 63. | For the improvement of the Unzad Elementary | |||
| School, Villasis | 500.00 | |||
| 64. | For the improvement of the San Jose Elementary | |||
| School, Urdaneta | 1,000.00 | |||
| 65. | For the completion of the Palguyud Elementary | |||
| School, Pozorrubio | 1,000.00 | |||
| 66. | For the completion of the San Roque Elementary | |||
| School, San Jacinto | 500.00 | |||
| 67. | For the completion of the Carusucan barrio | |||
| school, Asingan | 500.00 | |||
| 68. | For the completion of the Sanchez-Cabalitian | |||
| barrio school, Asingan | 500.00 | |||
| 69. | For the completion of the Calopaan barrio | |||
| school, Asingan | 500.00 | |||
| 70. | For the completion of the Pasileng-Toboy | |||
| barrio school, Asingan | 500.00 | |||
| 71. | For the completion of the Sobol barrio | |||
| school, Asingan | 500.00 | |||
| 72. | For the completion of the Flores barrio | |||
| school, San Manuel | 500.00 | |||
| 73. | For the completion of the San Roque | |||
| barrio school, San Manuel | 500.00 | |||
| 74. | For the completion of the San Juan | |||
| barrio school, San Manuel | 500.00 | |||
| 75. | For the completion of the Santo Domingo | |||
| barrio school, San Manuel | 500.00 | |||
| 76. | For the completion of the San Isidro barrio | |||
| school, San Nicolas | 600.00 | |||
| 77. | For the completion of the San Rafael barrio | |||
| school, San Nicolas | 400.00 | |||
| 78. | For the completion of the San Roque barrio | |||
| school, San Nicolas | 600.00 | |||
| 79. | For the completion of the Santa Maria barrio | |||
| school, San Nicolas | 400.00 | |||
| 80. | For the completion of the Legaspi barrio | |||
| school, Tayug | 500.00 | |||
| 81. | For the completion of the Carriedo barrio | |||
| school, Tayug | 500.00 | |||
| 82. | For the completion of the San Pedro barrio school, | |||
| San Quintin | 800.00 | |||
| 83. | For the completion of the Lagasit barrio | |||
| school, San Quintin | 500.00 | |||
| 84. | For the completion of the Lomayao barrio | |||
| school, San Quintin | 400.00 | |||
| 85. | For the completion of the Baligayan barrio | |||
| school, San Quintin | 400.00 | |||
| 86. | For the completion of the Bolintaguen barrio | |||
| school, San Quintin | 400.00 | |||
| 87. | For the completion of the Nagsain barrio | |||
| school, Calasiao | 1,000.00 | |||
| 88. | For the completion of the San Julian | |||
| barrio school, Malasiqui | 1,000.00 | |||
| 89. | For the repair of the Anguio barrio school, | |||
| San Fabian | 1,000.00 | |||
| 90. | For the completion of the Flores barrio | |||
| school, Umingan | 500.00 | |||
| 91. | For the completion of the Cabalitian barrio | |||
| school, Umingan | 500.00 | |||
| 92. | For the completion of the Baracbac barrio | |||
| school, Umingan | 600.00 | |||
| 93. | For the completion of the Cabangaran barrio | |||
| school, Umingan | 400.00 | |||
| 94. | For the completion of the Central Elementary | |||
| School, Santa Maria | 800.00 | |||
| 95. | For the completion of the Calditang-Samon | |||
| barrio school, Santa Maria | 700.00 | |||
| 96. | For the completion of the San Leon | |||
| barrio school, Balungao | 500.00 | |||
| 97. | For the completion of the Burgos | |||
| barrio school, Natividad | 500.00 | |||
| 98. | For the completion of the Cabalacañgan | |||
| barrio school, Rosales | 500.00 | |||
| RIZAL | ||||
| 1. | For the completion of Navotas Elementary | |||
| School | 1,500.00 | |||
| 2. | For the repair of the Tañgos barrio school, | |||
| Navotas | 1,000.00 | |||
| 3. | For the completion of Tanza barrio school, | |||
| Navotas | 1,000.00 | |||
| 4. | For the fencing and repair of the Malabon | |||
| Elementary School | 3,000.00 | |||
| 5. | For the reconstruction of Talipapa Elementary | |||
| School, Caloocan | 2,000.00 | |||
| 6. | For the construction of Hagdan-bato barrio | |||
| school, Mandaluyong | 1,000.00 | |||
| 7. | For the construction of Lamayan barrio | |||
| school, Mandaluyong | 1,000.00 | |||
| 8. | For the completion of Pateros Elementary | |||
| School | 2,000.00 | |||
| 9. | For the repair of Tipas Elementary | |||
| School, Tagig | 1,000.00 | |||
| 10. | For the construction of Napindan | |||
| barrio school, Tagig | 1,000.00 | |||
| 11. | For the completion and repairs of the | |||
| Ususan barrio school, Tagig | 500.00 | |||
| 12. | For the reconstruction of Sukat barrio | |||
| school, Muntinglupa | 500.00 | |||
| 13. | For the reconstruction of Malibay | |||
| barrio school, Pasay | 1,000.00 | |||
| 14. | For the construction of the Baclaran | |||
| Elementary School, Parañaque | 2,000.00 | |||
| 15. | For the repair of San Juan del Monte | |||
| Elementary School | 2,000.00 | |||
| 16. | For the construction of the Tambo barrio | |||
| school, Parañaque | 3,000.00 | |||
| 17. | For the completion and repair of Tagig | |||
| Elementary School | 1,000.00 | |||
| 18. | For the repair of carpentry shop and repair of | |||
| Las Piñas Elementary School | 1,000.00 | |||
| 19. | For the construction of the Punta barrio | |||
| school, Jalajala | 3,000.00 | |||
| 20. | For the construction of a barrio elementary | |||
| school for the barrios of Galas, Santos, and | ||||
| Diliman, Caloocan | 10,000.00 | |||
| 21. | For the completion of the Montalban | |||
| Elementary School | 1,500.00 | |||
| 22. | For the completion of the Burgos | |||
| Elementary School, Montalban | 1,000.00 | |||
| 23. | For the completion of the San Rafael | |||
| Elementary School, Montalban | 1,000.00 | |||
| 24. | For the completion of the Mali Elementary | |||
| School, San Mateo | 500.00 | |||
| 25. | For the reconstruction of the Rosario Elementary | |||
| School, Pasig | 500.00 | |||
| 26. | For the reconstruction of the Pineda Elementary | |||
| School, Pasig | 500.00 | |||
| 27. | For the reconstruction of the Ugong Elementary | |||
| School, Pasig | 500.00 | |||
| 28. | For the reconstruction of the Buting Elementary | |||
| School, Pasig | 500.00 | |||
| 29. | For the reconstruction of the Cainta | |||
| Elementary School | 1,000.00 | |||
| 30. | For the reconstruction of the San Juan Elementary | |||
| School, Taytay | 1,000.00 | |||
| 31. | For the repair and reconstruction of the | |||
| Bosoboso-Mambulao Elementary | ||||
| School, Antipolo | 500.00 | |||
| 32. | For the construction of the Teresa Domestic | |||
| Science School Building | 2,000.00 | |||
| 33. | For the completion of the Angono Elementary | |||
| School, Binangonan | 1,000.00 | |||
| 34. | For the construction of the Darangan Elementary | |||
| School, Binangonan | 1,000.00 | |||
| 35. | For the completion of the Jañosa Elementary | |||
| School, Binangonan | 500.00 | |||
| 36. | For the construction of two additional rooms | |||
| in the Cardona Elementary School | 3,000.00 | |||
| 37. | For the construction of two additional rooms | |||
| in the Tomas Claudio Elementary School, | ||||
| Morong | 3,000.00 | |||
| 38. | For the construction of the Baras Domestic Science | |||
| Building | 1,500.00 | |||
| 39. | For the construction of two additional rooms in the | |||
| Tanay Elementary School | 2,000.00 | |||
| 40. | For the completion of the Quisao Elementary | |||
| School, Pililla | 1,000.00 | |||
| 41. | For the construction of the Longos Elementary School, | |||
| Pililla | 2,000.00 | |||
| 42. | For the Mapandan barrio school building, Cainta | 600.00 | ||
| 43. | For the repair and extension of the Home | |||
| Economics Building, Marikina | 1,500.00 | |||
| 44. | For the construction of the Santa Ines | |||
| barrio school, Tanay | 1,500.00 | |||
| 45. | For the completion of the Pateros Elementary | |||
| School, Pateros | 1,000.00 | |||
| 46. | For the repair of the Quisao barrio | |||
| school building, Pililla | 500.00 | |||
| 47. | For the repair of the old central school | |||
| building, Morong | 900.00 | |||
| 48. | For the construction of Lamayan barrio school, | |||
| Mandaluyong | 1,000.00 | |||
| ROMBLON | ||||
| 1. | For the construction of the Tan-agan Elementary | |||
| School, Despujol | 3,000.00 | |||
| 2. | For the construction of the Limon Elementary | |||
| School, Looc | 2,500.00 | |||
| 3. | For the completion of the Cambalo Elementary | |||
| School, Cajidiocan | 1,000.00 | |||
| 4. | For the construction of the Paniqui Elementary | |||
| School, Odiongan | 2,500.00 | |||
| 5. | For the completion of the Calatrava Elementary | |||
| School, Badajoz | 1,000.00 | |||
| 6. | For the construction of the Bachawan | |||
| school, Badajoz | 2,000.00 | |||
| 7. | For the completion of the Azagra Elementary | |||
| School, San Fernando | 2,000.00 | |||
| 8. | For the construction of the Lumbang Elementary | |||
| School, Kajidiocan | 2,000.00 | |||
| 9. | For the construction of the Mayha Elementary | |||
| School, Odiongan | 2,000.00 | |||
| 10. | For the repair of the Alcantara | |||
| Elementary School, Looc | 1,500.00 | |||
| 11. | For the construction of the Tugdan Elementary | |||
| School, Looc | 2,000.00 | |||
| 12. | For the completion of the Gimbirayan | |||
| Elementary School, Looc | 1,500.00 | |||
| 13. | For the completion of the Mahabang-baybay | |||
| Elementary School, Badajoz | 500.00 | |||
| 14. | For the completion of the Concepcion | |||
| Elementary School, Badajoz | 500.00 | |||
| 15. | For the repair of the Carmen Elementary | |||
| School, Badajoz | 1,000.00 | |||
| SAMAR | ||||
| 1. | For the construction of the Sinidman Elementary | |||
| School, Oquendo | 2,000.00 | |||
| 2. | For the construction of the Monggol-boñgol | |||
| Elementary School Building, Capul | 1,000.00 | |||
| 3. | For the repair of the Capul Elementary | |||
| School Building | 1,000.00 | |||
| 4. | For the completion of the Carangian Home | |||
| Economics Building, Bobon | 800.00 | |||
| 5. | For the repair of the Bobon Elementary School | 500.00 | ||
| 6. | For the repair and completion of the Biri | |||
| Elementary School, Bobon | 500.00 | |||
| 7. | For the repair and completion of the San Antonio | |||
| Elementary School, Bobon | 500.00 | |||
| 8. | For the repair of the Dancalan Elementary | |||
| School, Bobon | 500.00 | |||
| 9. | For the completion of the Cagamutan | |||
| Elementary School, Palapag | 1,000.00 | |||
| 10. | For the completion of the Potong Elementary | |||
| School, Palapag | 500.00 | |||
| 11. | For the additional wing in the Gamay | |||
| Elementary School, Palapag | 1,000.00 | |||
| 12. | For the construction of Pangpang Elementary | |||
| School, Palapag | 1,000.00 | |||
| 13. | For the completion of the Tagabiran Elementary | |||
| School, Catubig | 1,500.00 | |||
| 14. | For the repair of the Buenavista Elementary | |||
| School, Bobon | 800.00 | |||
| 15. | For the completion of the San Rufino Elementary | |||
| School, Oquendo | 1,000.00 | |||
| 16. | For the reconstruction of the Limarayon | |||
| Elementary School, Calbayog | 1,000.00 | |||
| 17. | For window sills and other repairs in the | |||
| Bantayan Elementary School, Pambubajan | 400.00 | |||
| 18. | For the repair and completion of the | |||
| Mondragon Elementary School | 500.00 | |||
| 19. | For the completion of the Enriqueta Elementary | |||
| School, Lavezares | 500.00 | |||
| 20. | For the construction of the San Miguel | |||
| Elementary School, Lavezares | 1,000.00 | |||
| 21. | For the completion of the San Agustin | |||
| Nuevo Elementary School, Basey | 1,000.00 | |||
| 22. | For the construction of the Bangon Elementary | |||
| School, Calbiga | 2,000.00 | |||
| 23. | For the completion of the Blanca Aurora | |||
| Elementary School, Gandara | 1,000.00 | |||
| 24. | For the improvement of the Caparangasan | |||
| Elementary School, Gandara | 1,000.00 | |||
| 25. | For the construction of the Balatguti | |||
| Elementary School, Santo Niño | 2,000.00 | |||
| 26. | For the improvement of the Libucan | |||
| Elementary School, Tarangnan | 1,000.00 | |||
| 27. | For the completion of the Buaya Elementary | |||
| School, Villareal | 1,000.00 | |||
| 28. | For the improvement of Tutobigan Elementary | |||
| School, Wright | 1,000.00 | |||
| 29. | For the improvement of the Inalad Elementary | |||
| School, Wright | 1,000.00 | |||
| 30. | For the extension of the Silanga Elementary | |||
| School, Catbalogan | 2,000.00 | |||
| 31. | For the construction of the Guin-ansan | |||
| Elementary School, Almagro | 2,000.00 | |||
| 32. | For the San Jorge Elementary School, Gandara | 1,000.00 | ||
| 33. | For the Santa Elena Elementary School, Gandara | 1,000.00 | ||
| 34. | For the Dapdap Elementary School, Tarangnan | 1,000.00 | ||
| 35. | For the construction of the Mercedes and | |||
| Guinsurongan Elementary Schools, Catbalogan | 3,000.00 | |||
| 36. | For the Motiong Elementary School, Wright | 1,000.00 | ||
| 37. | For the Biri Elementary School, Calbiga | 1,000.00 | ||
| 38. | For the completion of the San Antonio Elementary | |||
| School, Basey | 1,000.00 | |||
| 39. | For the Iquiran Elementary School, Zumarraga | 1,000.00 | ||
| 40. | For the Paet Elementary School, Zumarraga | 1,000.00 | ||
| 41. | For the San Eduardo Elementary School, | |||
| Santa Rita | 1,000.00 | |||
| 42. | For the completion of the Bulusao Elementary | |||
| School, Balangiga | 500.00 | |||
| 43. | For the completion of the Gigoso Elementary | |||
| School, Balangiga | 500.00 | |||
| 44. | For the completion of the Santo Niño | |||
| Elementary School, Balangiga | 500.00 | |||
| 45. | For the completion of the Quinapondan | |||
| Elementary School, Balangiga | 500.00 | |||
| 46. | For the completion of the Mercedes Elementary | |||
| School, Guiuan | 500.00 | |||
| 47. | For the completion of the Homonhon Elementary | |||
| School, Guiuan | 500.00 | |||
| 48. | For the construction of semipermanent | |||
| school buildings in Cabunga-an and | ||||
| Manungca, Santa Rita | 3,000.00 | |||
| 49. | For the construction of a central school | |||
| building, Catbalogan | 3,000.00 | |||
| 50. | For the completion of the Sulu-an Elementary | |||
| School, Guiuan | 500.00 | |||
| 51. | For the completion of the Manicani Elementary | |||
| School, Guiuan | 500.00 | |||
| 52. | For the completion of the Tubabao Elementary | |||
| School, Guiuan | 500.00 | |||
| 53. | For the repair of the Guiuan Elementary | |||
| School | 1,000.00 | |||
| 54. | For the completion of the Hernani | |||
| Elementary School | 1,000.00 | |||
| 55. | For the completion of the Pambujan | |||
| Elementary School, Hernani | 1,000.00 | |||
| 56. | For the completion of the Matarinao | |||
| Elementary School, Salcedo | 500.00 | |||
| 57. | For the completion of the Butig | |||
| Elementary School, Salcedo | 500.00 | |||
| 58. | For the completion of the Bugas | |||
| Elementary School, Borongan | 1,000.00 | |||
| 59. | For the completion of the San Miguel barrio | |||
| school, Llorente | 500.00 | |||
| 60. | For the completion of the Cagpili | |||
| Elementary School, Oras | 500.00 | |||
| 61. | For the completion of the Tubabao | |||
| Elementary School, Oras | 500.00 | |||
| 62. | For the repair of the Oras Elementary School | 1,000.00 | ||
| 63. | For the completion of the San Vicente | |||
| Elementary School, Sulat | 1,000.00 | |||
| 64. | For the extension of the Jitaasan | |||
| school building, Wright | 1,000.00 | |||
| 65. | For the completion of the San Andres | |||
| Elementary School Building, Villareal | 1,000.00 | |||
| 66. | For the completion of a school building in | |||
| Las Navas, Catubig | 1,000.00 | |||
| 67. | For the improvement of the Santo Niño | |||
| Elementary School, Basey | 1,000.00 | |||
| 68. | For the construction of Majacob Elementary | |||
| School, Tarangnan | 1,000.00 | |||
| 69. | For the extension of the Jiabong Elementary | |||
| School, Catbalogan | 1,000.00 | |||
| 70. | For the improvement of the Navatas Elementary | |||
| School, Villareal | 1,000.00 | |||
| 71. | For the construction of the Mayabay Elementary | |||
| School, Zumarraga | 1,000.00 | |||
| 72. | For the completion of the Buenavista Elementary | |||
| School, Basey | 1,000.00 | |||
| 73. | For the completion of the Nouvilas Occidental | |||
| Elementary School, Basey | 1,000.00 | |||
| 74. | For the completion of the Magallanes Elementary | |||
| School, Basey | 1,000.00 | |||
| 75. | For school building in Bongolbongol, Capul | 500.00 | ||
| 76. | For repairs of the school building in Carayman, | |||
| Calbayog | 1,000.00 | |||
| 77. | For the construction of a semipermanent school | |||
| building in San Jose de Buan | 2,000.00 | |||
| 78. | For the completion of the elementary school | |||
| building in Astorga, Zumarraga | 500.00 | |||
| 79. | For the improvement of the school building in | |||
| Santo Niño, Gandara | 1,000.00 | |||
| 80. | For the construction of the Almagro | |||
| central shop building | 1,000.00 | |||
| 81. | For the construction of the Santo Niño | |||
| central shop building | 1,000.00 | |||
| SORSOGON | ||||
| 1. | For the barrio elementary school of Payawin, | |||
| Gubat | 1,500.00 | |||
| 2. | For the completion of the Marinao Elementary | |||
| School, Bulan | 250.00 | |||
| 3. | For the construction of the San Juan Elementary | |||
| School, Bulan | 200.00 | |||
| 4. | For the reconstruction of the Buguin Elementary | |||
| School, Bulan | 200.00 | |||
| 5. | For the reconstruction of the Butag Elementary | |||
| School, Bulan | 200.00 | |||
| 6. | For the reconstruction of the Calomagon | |||
| Elementary School, Bulan | 200.00 | |||
| 7. | For the reconstruction of the Inararan Elementary | |||
| School, Bulan | 200.00 | |||
| 8. | For the reconstruction of the Matnog | |||
| Elementary School | 350.00 | |||
| 9. | For the construction of the Manbon Elementary | |||
| School, Irosin | 1,200.00 | |||
| 10. | For the construction of the Gabao Elementary | |||
| School, Irosin | 1,200.00 | |||
| 11. | For the reconstruction of the Santa Magdalena | |||
| Elementary School | 500.00 | |||
| 12. | For the reconstruction of the Talaonga Elementary | |||
| School, Santa Magdalena | 400.00 | |||
| 13. | For the construction of the Paco Elementary | |||
| School, Gubat | 1,100.00 | |||
| 14. | For the construction of the Banuang-Gorang | |||
| Elementary School, Donsol | 3,000.00 | |||
| 15. | For the repair of the Goroyan Elementary | |||
| School, Juban | 500.00 | |||
| 16. | For the construction of the Rizal Elementary | |||
| School, Sorsogon | 1,500.00 | |||
| 17. | For the repair of the San Antonio | |||
| Elementary School, Pilar | 500.00 | |||
| 18. | For the repair of the Boton Elementary | |||
| School, Casiguran | 500.00 | |||
| SURIGAO | ||||
| 1. | For the Dapa Elementary School | 4,000.00 | ||
| 2. | For the Parang Elementary School, Cantilan | 1,500.00 | ||
| 3. | For the Tubod Elementary School, Mainit | 2,000.00 | ||
| 4. | For the Sison Elementary School, Surigao | 1,000.00 | ||
| 5. | For the reconstruction of the Sapao Primary | |||
| School, Numancia, Surigao | 500.00 | |||
| 6. | For the reconstruction of the Alegria Primary | |||
| School, Numancia | 500.00 | |||
| 7. | For the reconstruction of the Burgos Primary | |||
| School, Numancia | 500.00 | |||
| 8. | For the Timamana Elementary School, Mainit | 1,000.00 | ||
| 9. | For the completion of the semipermanent | |||
| elementary school of Numancia | 2,000.00 | |||
| 10. | For the Surigao Home Economics Building | 3,500.00 | ||
| 11. | For the construction of the Zaragosa barrio | |||
| school, Surigao | 500.00 | |||
| 12. | For the construction of the Namoc barrio | |||
| school, Surigao | 500.00 | |||
| 13. | For the construction of the Cortes barrio | |||
| school, Tandag | 500.00 | |||
| 14. | For the construction of the San Isidro barrio | |||
| school, Gigaquit | 500.00 | |||
| 15. | For the Santo Niño Elementary School, Lianga | 500.00 | ||
| 16. | For the Oteiza Elementary School, Lianga | 500.00 | ||
| 17. | For the Anao-Aon Elementary School, Surigao | 500.00 | ||
| 18. | For the Mati Elementary School, Surigao | 500.00 | ||
| 19. | For the San Jose Elementary School, Surigao | 500.00 | ||
| 20. | For the Burgos Elementary School, Tandag | 500.00 | ||
| 21. | For the Malimono Elementary School, Surigao | 500.00 | ||
| 22. | For the La Paz Elementary School, Tago | 500.00 | ||
| 23. | For the Claver Primary School, Gigaquit | 1,000.00 | ||
| TARLAC | ||||
| 1. | For the Pitombayog Elementary School, Mayantoc | 500.00 | ||
| 2. | For the San Jose Elementary School, Mayantoc | 500.00 | ||
| 3. | For the Mamonit Elementary School, Mayantoc | 500.00 | ||
| 4. | For the San Bartolome Elementary School, | |||
| Mayantoc | 500.00 | |||
| 5. | For the Gerona Intermediate School, Gerona | 5,000.00 | ||
| 6. | For the Estipona Elementary School, Pura | 1,000.00 | ||
| 7. | For the San Julian Elementary School, Moncada | 500.00 | ||
| 8. | For the Mabini Elementary School, Moncada | 500.00 | ||
| 9. | For the San Agustin Elementary School, | |||
| San Manuel | 500.00 | |||
| 10. | For the Santa Ignacia Elementary School, | |||
| Santa Ignacia | 500.00 | |||
| 11. | For the reconstruction of the Bobon 2nd | |||
| Elementary School, Camiling | 2,000.00 | |||
| 12. | For the Marawi Elementary School, Camiling | 500.00 | ||
| 13. | For the Anoling Elementary School, Camiling | 500.00 | ||
| 14. | For the Libueg Elementary School, Camiling | 500.00 | ||
| 15. | For the Bobon 1st Elementary School, Camiling | 500.00 | ||
| 16. | For the Sinilian 1st Elementary School, | |||
| Camiling | 1,000.00 | |||
| 17. | For the reconstruction of the Victoria Home | |||
| Economics Building HaAIES | 2,500.00 | |||
| 18. | For the repair and completion of the Balutu | |||
| Elementary School, Concepcion | 1,000.00 | |||
| 19. | For the repair and completion of the | |||
| Macalung Elementary School, La Paz | 1,000.00 | |||
| 20. | For the repair and completion of the Tibag | |||
| Elementary School, Tarlac | 1,000.00 | |||
| 21. | For the repair of the Estacion barrio school, | |||
| Paniqui | 500.00 | |||
| 22. | For the completion of the Anao Home Economics | |||
| Building | 2,500.00 | |||
| 23. | For the completion of the San Clemente Domestic | |||
| Science Building, Tarlac | 1,000.00 | |||
| 24. | For the construction of the Pacalcal barrio | |||
| school, Bamban | 2,000.00 | |||
| 25. | For the repair and completion of the barrio school | |||
| of Mabilang, Paniqui, Tarlac | 1,000.00 | |||
| 26. | For the repair of the barrio school of | |||
| Nipaco, Paniqui, Tarlac | 200.00 | |||
| 27. | For the continuation of the construction of | |||
| the barrio school of Cabayaoasan, Paniqui | 500.00 | |||
| 28. | For the repair of the barrio school of Patalan, | |||
| Paniqui, Tarlac | 500.00 | |||
| 29. | For the repair and completion of the barrio | |||
| school of Santa Ines, Paniqui, Tarlac | 500.00 | |||
| 30. | For the repair and completion of Cariño | |||
| barrio school, Paniqui, Tarlac | 300.00 | |||
| TAYABAS | ||||
| 1. | For the Lucban Elementary School | 5,000.00 | ||
| 2. | For the construction of the Anoling Elementary | |||
| School, Infanta | 2,000.00 | |||
| 3. | For the construction of the Infanta | |||
| Elementary School | 3,500.00 | |||
| 4. | For the construction of additional rooms in | |||
| Casiguran Elementary School | 3,000.00 | |||
| 5. | For the construction of the San Jose Elementary | |||
| School, Baler | 2,000.00 | |||
| 6. | For the construction of the San Luis Elementary | |||
| School, Baler | 2,000.00 | |||
| 7. | For the construction of two additional rooms in the | |||
| elementary school building, San Narciso, Tayabas | 4,000.00 | |||
| 8. | For the construction of two rooms in the elementary | |||
| school of Agdagan, Unisan | 2,000.00 | |||
| 9. | For the construction of an elementary school in the | |||
| barrio of Aloneros, Guinayangan | 2,000.00 | |||
| 10. | For the additional rooms in the Pitogo concrete | |||
| school building | 2,000.00 | |||
| 11. | For the construction of the Polillo | |||
| Elementary School | 3,000.00 | |||
| 12. | For the Bignay Elementary School, Sariaya | 1,500.00 | ||
| 13. | For the construction of the Hondagua | |||
| Elementary School, Lopez | 3,000.00 | |||
| 14. | For the additional room in the Concepcion barrio | |||
| school, Sariaya | 1,500.00 | |||
| 15. | Construction of Sampaloc Elementary | |||
| School | 1,000.00 | |||
| 16. | Construction of Boliran Elementary | |||
| School, Tiaong | 1,000.00 | |||
| 17. | Construction of Balaybalay Elementary | |||
| School, Mauban | 1,500.00 | |||
| 18. | Construction of Santa Catalina Elementary | |||
| School, Candelaria | 1,000.00 | |||
| 19. | Construction of Piris Elementary School, | |||
| Guinayangan | 1,000.00 | |||
| 20. | Construction of Bartad Elementary | |||
| School, Gumaca | 2,000.00 | |||
| 21. | Construction of Balubad Elementary | |||
| School, Gumaca | 2,000.00 | |||
| 22. | Construction of General Luna | |||
| Elementary School | 1,000.00 | |||
| 23. | Construction of Lopez Elementary School ECaHSI | 2,000.00 | ||
| 24. | Construction of Macalelon Elementary School | 1,000.00 | ||
| 25. | Construction of Catanauan Elementary School | 2,000.00 | ||
| 26. | Construction of additional room for Candelaria | |||
| Elementary School | 2,000.00 | |||
| 27. | Construction of Cotta Elementary School, Lucena | 1,000.00 | ||
| ZAMBALES | ||||
| 1. | For the completion of the Linusugan Elementary | |||
| School, San Marcelino | 1,000.00 | |||
| 2. | For the barrio school of Bani, Masinloc | 1,000.00 | ||
| 3. | For the construction of the Bolitio Elementary | |||
| School, Santa Cruz | 1,000.00 | |||
| 4. | For the barrio school of Umaya, San Narciso | 1,000.00 | ||
| 5. | For the repair and completion of the Binabalian | |||
| Elementary School, Candelaria | 1,000.00 | |||
| 6. | For the repair of the San Antonio Elementary | |||
| School | 1,000.00 | |||
| 7. | For the repair of the La Paz Elementary School, | |||
| San Narciso | 1,000.00 | |||
| 8. | For the completion and repair of the Taltal | |||
| Elementary School, Masinloc | 1,000.00 | |||
| ZAMBOANGA | ||||
| 1. | For the Santa Maria Elementary School, | |||
| Zamboanga | 2,000.00 |
B. INVESTIGATION AND CONSTRUCTION OF ROADS AND BRIDGES
| (d) | For the investigation and survey of special road and bridge | ||||
| projects to be designated by the Secretary of Public | |||||
| Works and Communications, including the purchase, | |||||
| operation and maintenance of test-boring apparatus | 10,000.00 | ||||
| (e) | For aid for the construction and improvement of the | ||||
| following special road projects provided the provinces | |||||
| in which such projects are situated comply with the | |||||
| provisions of section 2113 of Act No. 2711, and, by a | |||||
| resolution of the provincial board, shall guarantee by | |||||
| continuing annual appropriations the establishment of | |||||
| such a system of maintenance as may be necessary in | |||||
| the judgment of the Director of Public Works, on all | |||||
| first-class roads now constructed or which may be | |||||
| constructed in the future and declared as such by the | |||||
| Director of Public Works | |||||
| 1. | Agusan-Oriental Misamis interprovincial road: | ||||
| a. | Province of Agusan | 5,000.00 | |||
| b. | Province of Oriental Misamis | 10,000.00 | |||
| 2. | Batangas-Cavite interprovincial road: | ||||
| a. | Province of Batangas (Tagaytay-Lemery | ||||
| section through barrio Payapa) | 10,000.00 | ||||
| b. | Province of Cavite | 10,000.00 | |||
| 3. | Baybay-Abuyog coast-to-coast road: | ||||
| a. | Province of Leyte | 15,000.00 | |||
| 4. | Calapan-South road: | ||||
| a. | Province of Mindoro | 10,000.00 | |||
| 5. | Catbalogan-Taft coast-to-coast road: | ||||
| Province of Samar | 15,000.00 | ||||
| 6. | Cotabato-Lanao interprovincial road: | ||||
| a. | Province of Lanao | 10,000.00 | |||
| b. | Province of Cotabato | 10,000.00 | |||
| 7. | Davao-Cotabato interprovincial road: | ||||
| a. | Province of Davao | 10,000.00 | |||
| b. | Province of Cotabato | 10,000.00 | |||
| 8. | Ilocos Norte-Cagayan interprovincial road: | ||||
| a. | Province of Ilocos Norte | 25,000.00 | |||
| b. | Province of Cagayan | 25,000.00 | |||
| 9. | Laguna-Tayabas interprovincial road: | ||||
| (Famy-Infanta section) | |||||
| a. | Province of Tayabas | 15,000.00 | |||
| b. | Province of Laguna | 10,000.00 | |||
| 10. | Capiz-Iloilo interprovincial road: | ||||
| a. | Province of Capiz (Dumalag-Calinog section) | 5,000.00 | |||
| b. | Province of Iloilo (Barotac Nuevo-Balasan section) | 5,000.00 | |||
| 11. | Legaspi-Manito coast-to-coast road, | ||||
| Province of Albay | 10,000.00 | ||||
| 12. | Ligao-Panganiban coast-to-coast road, | ||||
| Province of Albay | 5,000.00 | ||||
| 13. | For the construction of Naga-Finamba coast-to-coast | ||||
| road, Province of Camarines Sur | 8,000.00 | ||||
| 14. | Mountain Province-Nueva Vizcaya interprovincial road: | ||||
| a. | Mountain Province | 10,000.00 | |||
| b. | Province of Nueva Vizcaya | 10,000.00 | |||
| 15. | Nueva Ecija-Tayabas interprovincial road: | ||||
| a. | Province of Nueva Ecija | 15,000.00 | |||
| b. | Province of Tayabas | 15,000.00 | |||
| 16. | Oriental Misamis-Lanao interprovincial road: | ||||
| Province of Oriental Misamis | 5,000.00 | ||||
| 17. | Tayabas-Camarines Norte interprovincial road: | ||||
| a. | Province of Tayabas | 15,000.00 | |||
| b. | Province of Camarines Norte | 10,000.00 | |||
| 18. | Tagudin-Bontoc interprovincial road: | ||||
| a. | Province of Ilocos Sur | 15,000.00 | |||
| b. | Mountain Province | 10,000.00 | |||
| 19. | Zamboanga-Occidental Misamis interprovincial road | ||||
| (Pagadian-Misamis road): | |||||
| a. | Province of Zamboanga | 15,000.00 | |||
| 20. | Misamis Occidental-Zamboanga interprovincial road: | ||||
| a. | Province of Occidental Misamis | ||||
| (Oroquieta-Dapitan section) | 15,000.00 | ||||
| 21. | Mountain Province-Cagayan interprovincial road | ||||
| and bridges: | |||||
| a. | Cagayan Province | P20,000.00 | |||
| b. | Mountain Province (Bontoc-Lubuagan section) | 8,000.00 | |||
| 22. | Rizal-Laguna interprovincial road: | ||||
| a. | Province of Rizal | 10,000.00 | |||
| 23. | Albay-Camarines Sur Interprovincial road | ||||
| (Tiwi-Sangay section): | |||||
| a. | Province of Albay | 10,000.00 | |||
| b. | Province of Camarines Sur | 10,000.00 | |||
| 24. | Samar-Leyte interprovincial road: | ||||
| a. | Province of Samar | 10,000.00 | |||
| b. | Province of Leyte | 10,000.00 | |||
| 25. | Catarman-Oquendo coast-to-coast road: | ||||
| a. | Province of Samar | 10,000.00 | |||
| 26. | Capiz-Antique interprovincial road: | ||||
| a. | Province of Capiz, (Navas-Buruanga section) | 10,000.00 | |||
| 27. | Palompon-Valencia-Capoocan coast-to-coast road: | ||||
| a. | Province of Leyte | 8,000.00 | |||
| 28. | Camarines Norte-Camarines Sur interprovincial road: | ||||
| a. | Province of Camarines Sur | 10,000.00 | |||
| 29. | Rizal-Manila interprovincial road and bridges | ||||
| (Tondo-Navotas section): | |||||
| a. | Province of Rizal | 15,000.00 | |||
| 30. | Cagayan Valley road and bridges: | ||||
| a. | Nueva Ecija | 10,000.00 | |||
| b. | Nueva Vizcaya | 10,000.00 | |||
| c. | Isabela | 10,000.00 | |||
| d. | Cagayan | 10,000.00 | |||
| 31. | Malabuyok-Boljo-on coast-to-coast road: | ||||
| a. | Province of Cebu | 18,000.00 | |||
| 32. | Cagayan-Isabela interprovincial road (Enrile) | ||||
| Santa Maria-San Isidro section): | |||||
| a. | Province of Isabela | 7,000.00 | |||
| b. | Province of Cagayan | 8,000.00 | |||
| 33. | Gumaca-Mulanay coast-to-coast road: | ||||
| a. | Province of Tayabas | 10,000.00 | |||
| 34. | Ilocos Norte-Abra interprovincial road: | ||||
| a. | Province of Abra | 9,000.00 | |||
| 35. | La Castellana-Vallehermoso interprovincial road: | ||||
| a. | Province of Occidental Negros | 5,000.00 | |||
| b. | Province of Oriental Negros | 10,000.00 | |||
| 36. | Surigao-Agusan interprovincial road: | ||||
| a. | Province of Surigao | 10,000.00 | |||
| 37. | Bais-Cabancalan interprovincial road: | ||||
| a. | Province of Oriental Negros | 5,000.00 | |||
| 38. | Ormoc-Capoocan coast-to-coast road: | ||||
| a. | Province of Leyte | 10,000.00 | |||
| (f) | For the construction, completion, reconstruction | ||||
| and improvement of the following roads and bridges | |||||
| in the regularly organized provinces, provided they comply | |||||
| with the provisions of section 2113 of Act No. 2711, and, | |||||
| by resolution of the provincial board, shall guarantee by | |||||
| continuing annual appropriations the establishment of such | |||||
| a system of maintenance as may be necessary in the | |||||
| judgment of the Director of Public Works, on all first-class | |||||
| roads now constructed or which may be constructed in the | |||||
| future and declared as such by the Director of Public Works | |||||
| ABRA | |||||
| 1. | For the Dolores-San Juan-Lagayan road | 4,000.00 | |||
| and bridges | 4,000.00 | ||||
| 2. | For the Peñarrubia-Villaviciosa-Pilar road | 2,000.00 | |||
| 3. | For the Tayum-Bucay road | ||||
| ALBAY | |||||
| 1. | For the road between Lictin and Polawig | ||||
| Calolbon, Catanduanes | 2,000.00 | ||||
| 2. | For the Balza-Tanawan road, Malinao | 2,000.00 | |||
| 3. | For the Malilipot-San Isidro road, Malilipot | 2,000.00 | |||
| 4. | For the improvement of the provincial roads | ||||
| within the poblacion of Ligao | 8,000.00 | ||||
| 5. | For the survey and construction of the | ||||
| Libon-Matacong-Polangui road | 5,000.00 | ||||
| 6. | For the Virac-Magnesia road | 3,100.00 | |||
| 7. | For the construction of a bridge in the | ||||
| Pandan-Caramoran road connecting | |||||
| the poblacion of Pandan with the | |||||
| seashore | 15,000.00 | ||||
| 8. | For the construction of Rapurapu-Babatngon road | 3,500.00 | |||
| 9. | For the Malinao (Albay)-Buhi (Camarines Sur) road: | ||||
| Parapoto-Ogob-Albay section | 3,000.00 | ||||
| BATANGAS | |||||
| 1. | For the Santa Rita Junction-Santa Rita Danglayan, | ||||
| beach road | 2,000.00 | ||||
| 2. | For the Bauan-Mabini Junction-San Luis road | ||||
| via Sinala | 2,000.00 | ||||
| 3. | For the San Juan-Pinagbayanan beach road | 2,000.00 | |||
| BULACAN | |||||
| 1. | For the Biak-na-bato road, San Miguel | P2,000.00 | |||
| 2. | For the construction of the Inter-Municipal road | ||||
| connecting the barrios of Iba Este in the municipality | |||||
| of Calumpit, and Iba in the municipality of Hagonoy, | |||||
| Province of Bulacan | 2,000.00 | ||||
| CAMARINES NORTE | |||||
| 1. | For the Talisay-San Vicente road, via Santa Cruz | 3,500.00 | |||
| CAMARINES SUR | |||||
| 1. | For the construction of a suspension bridge over Lalo | ||||
| (San Vicente) River, Buhi | 2,000.00 | ||||
| CAPIZ | |||||
| 1. | Completion of Panay-Pontevedra road | 10,000.00 | |||
| CEBU | |||||
| 1. | For the coast-to-coast road beginning from the barrio | ||||
| of Valencia, Carcar, across the barrio of Zaragosa, | |||||
| Aloguinsan, which will unite with the | |||||
| Aloguinsan-Mantalongon road | 3,000.00 | ||||
| 2. | For the coast-to-coast road starting from the | ||||
| Pinamungahan Poblacion towards the barrio | |||||
| of Sibago and thence to the municipality | |||||
| of San Fernando | 3,000.00 | ||||
| 3. | For the Tabogon, Cayaan, Guadalupe | ||||
| road, Bogo | 2,500.00 | ||||
| 4. | For the Pilar road, Cawit | 2,000.00 | |||
| 5. | For the Tayud-Consolacion road | 5,000.00 | |||
| 6. | For the construction of a bridge connecting | ||||
| the barrios of Gabe, Cordova, and | |||||
| Marigondong, Opon | 10,000.00 | ||||
| ILOCOS NORTE | |||||
| 1. | For the Sarrat-Laoag road thru barrio 24, | ||||
| Sarrat | 2,000.00 | ||||
| 2. | For the San Nicolas-Paoay road | 2,500.00 | |||
| 3. | For the Laoag-Caaoacan road | 2,000.00 | |||
| ILOCOS SUR | |||||
| 1. | Poblacion-Paratong road, Narvacan | 8,000.00 | |||
| 2. | Coddog-Cadacad road, via Casilagan, Sarmingan | ||||
| and Marozo, Narvacan | 2,000.00 | ||||
| 3. | Poblacion-Pilar road, Santa Cruz | 1,000.00 | |||
| 4. | Poblacion-Rancho road, Santa | 1,000.00 | |||
| 5. | Poblacion-Lingsat road, Santa Maria | 1,000.00 | |||
| 6. | Cal-laguip Bridge, Caoayan-Vigan road | 8,000.00 | |||
| 7. | San Vicente-Budoc, San Sebastian-San | ||||
| Ildefonso road | 5,000.00 | ||||
| 8. | Mestizo Bridge, San Julian-Vigan | 5,000.00 | |||
| 9. | Dardarat, Cabugao road | 2,000.00 | |||
| 10. | Magsiñgal-Mansante road | 2,000.00 | |||
| 11. | Vigan-Camangaan-Naguilian-Caoayan road | 5,000.00 | |||
| 12. | Ayusan Norte Bridge, Vigan | 2,000.00 | |||
| 13. | For the Mankayan-Cervantes road | 5,000.00 | |||
| ILOILO | |||||
| 1. | For the improvement of the provincial road | ||||
| between Jaro and Manduriao | 3,000.00 | ||||
| 2. | Jalaud River bridge, Dingle | 10,000.00 | |||
| 3. | For the continuation of the construction of the road | ||||
| known "Quintin Salas" starting from the provincial | |||||
| road Jaro-Leganes up to the municipality of Pavia | 3,000.00 | ||||
| 4. | For the continuation of the repair of the provincial road | ||||
| from Alimodian to Ma-asin | 4,500.00 | ||||
| 5. | For the Jaro-Balabago road | 3,000.00 | |||
| LAGUNA | |||||
| 1. | For the construction of the Sabang bridge, | ||||
| Alaminos | 1,500.00 | ||||
| LEYTE | |||||
| 1. | For the Barugo-San Miguel road | 5,500.00 | |||
| 2. | Bato-Sogod road | 8,000.00 | |||
| MANILA | |||||
| 1. | For the bridge over the Matungao River to | ||||
| connect M. Roxas and Gral. Pio del Pilar | |||||
| Streets, Santa Ana | 3,500.00 | ||||
| MARINDUQUE | |||||
| 1. | For the Sayao-Balanakan road, Mogpog | 2,000.00 | |||
| 2. | For the Argao-Balanakan road, Mogpog | 2,000.00 | |||
| 3. | For the Marlanga spillway bridge, Torrijos | 3,000.00 | |||
| MOUNTAIN PROVINCE | |||||
| 1. | Baguio-Amburayan road | 5,000.00 | |||
| 2. | Ambuklao-Kayan road | 5,000.00 | |||
| MINDORO | |||||
| 1. | For the Sampaloc-Butas provincial road, Naujan | 3,000.00 | |||
| 2. | For the construction and improvement of the | ||||
| Pinagsabangan Junction-Dulong Bayan | |||||
| (Naujan road) | 3,000.00 | ||||
| NUEVA ECIJA | |||||
| 1. | For the Quezon-Guimba road | 3,000.00 | |||
| 2. | For the construction of reinforced concrete | ||||
| bridge over the Caraballo Creek connecting | |||||
| the "poblacion" of Cabanatuan | 15,000.00 | ||||
| OCCIDENTAL NEGROS | |||||
| 1. | For the San Carlos-Quezon road | P2,000.00 | |||
| 2. | For the Victorias-Daan Banwa road | 2,000.00 | |||
| 3. | For the Saravia-Tuburan road | 4,000.00 | |||
| 4. | For the Lemery-Macasilao road, Calatrava | 2,000.00 | |||
| 5. | For the Murcia-Cancilayan road | 4,500.00 | |||
| 6. | For the construction of the Pontevedra- | ||||
| Antipolo road | 9,000.00 | ||||
| 7. | For the construction of the | ||||
| La Castellana-Vallehermoso road | 10,000.00 | ||||
| 8. | For the construction of the | ||||
| Isabela-Mampahubug-Guihulngan road | 5,000.00 | ||||
| 9. | For the construction of the Kabankalan | ||||
| South road | 5,000.00 | ||||
| 10. | For asphalting the Bago-Maao provincial road | 5,000.00 | |||
| 11. | For the construction of the Victorias- | ||||
| Manapla road | 5,000.00 | ||||
| 12. | For the construction of Cadiz-Manapla road | 4,000.00 | |||
| 13. | For the construction of Murcia-Cancilayan- | ||||
| Maao road | 4,000.00 | ||||
| ORIENTAL NEGROS | |||||
| 1. | For the Tanjay-Novallas road | 5,000.00 | |||
| 2. | For the Dumaguete-Palimpinon road | 3,000.00 | |||
| 3. | For the Dumaguete South road | 3,000.00 | |||
| PALAWAN | |||||
| 1. | For the Coron-Busuanga road | 2,000.00 | |||
| 2. | For the Calawag-San Nicolas-Coron road | 1,000.00 | |||
| 3. | For the Cuyu-Suba road | 1,000.00 | |||
| 4. | For the completion of Cuyo-Igabas road | 1,000.00 | |||
| PAMPANGA | |||||
| 1. | Maintenance and improvement of | ||||
| Sto. Rosario-San Rafael-Sta. Monica | |||||
| barrio road, Macabebe | 1,000.00 | ||||
| 2. | Maintenance and improvement of | ||||
| San Roque-San Juan-Sta. Lutgarda-Sto. Niño | |||||
| barrio roads, Macabebe | 1,000.00 | ||||
| 3. | Maintenance and improvement of | ||||
| Sta. Lucia-Sta. Monica barrio roads, Sexmoan | 1,000.00 | ||||
| 4. | Maintenance and improvement of S. | ||||
| Nicolas barrio road, Masantol | 500.00 | ||||
| 5. | Construction of Sto. Domingo-Lourdes- | ||||
| San Isidro barrio roads, Minalin | 1,000.00 | ||||
| 6. | Improvement of San Miguel-Concepcion | ||||
| barrio road, San Simon | 1,000.00 | ||||
| 7. | Maintenance and improvement of Dagdag via | ||||
| Managna to Mabiga barrio road, Mabalacat | 1,000.00 | ||||
| 8. | Repair of Sapung-Bulaun road to Salu, Porac | 1,000.00 | |||
| 9. | Repair of Sta. Cruz road to Manuali, Porac | 1,000.00 | |||
| PANGASINAN | |||||
| 1. | For the construction and improvement of the road | ||||
| leading to the barrio of Cabaruan, Urdaneta, Pangasinan, | |||||
| from the Urdaneta-Sta. Barbara provincial road | |||||
| in the barrio Pinamalupdup, Urdaneta, and passing | |||||
| through the barrios of Labit and Sugcong of Urdaneta | 3,000.00 | ||||
| 2. | For the construction of the San Pablo bridge | ||||
| of Calasiao | 5,000.00 | ||||
| 3. | For the construction of the Mapandan Catablan, | ||||
| Urdaneta road | 3,000.00 | ||||
| RIZAL | |||||
| 1. | Construction of a culvert over a creek in | ||||
| calle Sumulong leading to the Antipolo | |||||
| Elementary School, Antipolo | 2,000.00 | ||||
| ROMBLON | |||||
| 1. | For the Romblon road from poblacion to Sablayan | 3,000.00 | |||
| SAMAR | |||||
| 1. | For the Lavezares-Carañgian-Bobon road | 2,000.00 | |||
| 2. | For the Lao-ang-Catubig road | 2,000.00 | |||
| 3. | For the Salcedo-Naga Pambujan road | 8,000.00 | |||
| 4. | For the Hernani-Llorente road | 5,000.00 | |||
| 5. | For the Lokilokon-San Jose de Buan road | 5,000.00 | |||
| SORSOGON | |||||
| 1. | For the Juban-Magallanes road | 14,000.00 | |||
| 2. | For the Bacon-Sugod Prieto Diaz road | 5,000.00 | |||
| 3. | For the construction of the Gabao-Golanggolang | ||||
| barrio road, Irosin | 3,500.00 | ||||
| TARLAC | |||||
| 1. | For the Santa Ignacia-Gerona road | 3,000.00 | |||
| 2. | For the Capas-Lawi road | 2,000.00 | |||
| TAYABAS | |||||
| 1. | For the Quezon-Alabat-Perez road | 2,000.00 | |||
| 2. | For the P. Burgos-Malicboy road | 2,000.00 | |||
| 3. | For the Calawag-Guinayañgan road | 2,000.00 | |||
| 4. | For the Unisan-Pitogo road | 2,000.00 | |||
| 5. | For the Unisan-Agdañgan road | 2,000.00 | |||
| 6. | For the Guinayañgan-Piris-S. Narciso road | 2,000.00 | |||
| 7. | Construction of the Tayabas-Mainit road | 3,000.00 | |||
| 8. | Construction of the Baler-Cemento road | 3,000.00 | |||
| 9. | Construction of the Sariaya-Mamala road | 3,000.00 | |||
| 10. | Construction of Sariaya-Bignay road | 3,000.00 | |||
| 11. | Construction of the Mangilag, Candelaria- | ||||
| Concepcion road, Sariaya | 3,000.00 | ||||
| 12. | For the Ilasan-Mainit road | 2,000.00 | |||
| 13. | For the Candelaria-San Isidro road | 2,000.00 | |||
| ZAMBOANGA | |||||
| 1. | For the Margosatubig-Legarda-Dina | ||||
| road, Zamboanga | 2,000.00 |
C. HYDRAULIC INVESTIGATIONS
| (g) | For making preliminary investigations and surveys | ||
| of irrigation, water supply, water power and river | |||
| control projects | 10,000.00 |
D. ARTESIAN WELLS, WATERWORKS AND PUBLIC CONVENIENCES
| (h) | For the drilling of artesian wells by the Bureau of | ||
| Public Works, including the purchase and | |||
| maintenance of well-drilling equipment, and | |||
| expenses incurred in previous years | 103,150.00 | ||
| Provided, That funds shall be appropriated by | |||
| the province or municipality concerned to cover | |||
| one-third of the cost of each well requested | |||
| before drilling operations are undertaken by the | |||
| Bureau of Public Works, and that upon | |||
| certification by the Director of Public Works, | |||
| of the cost of a well, the province or municipality | |||
| concerned shall pay its share in the Insular | |||
| Treasury; | |||
| Provided, further, That any province or municipality, | |||
| which by virtue of the provisions of this Act, shall | |||
| incur the expense of an artesian well resulting in a | |||
| failure, shall have the amount expended reimbursed | |||
| from this appropriation. | |||
| (i) | For the construction of the insular projects and | ||
| for the aid in the construction or extension of provincial | |||
| and municipal waterworks projects, drainage, sewerage, | |||
| public toilets, with their corresponding equipment, | |||
| lavatories, bidet and cisterns or public baths and public | |||
| laundries, provided the province or municipality | |||
| concerned shall appropriate funds to cover the cost | |||
| of one-third of the work and provided that, by | |||
| resolution of the respective provincial board | |||
| or municipal council, as the case may be, it shall | |||
| be guaranteed by means of continuous assignment | |||
| of funds, the establishment of a system of | |||
| maintenance and conservation necessary, at | |||
| the discretion of the sanitary official of the | |||
| province and of the district engineer. No | |||
| municipality shall be entitled to receive as aid | |||
| more than P25,000 a year, but in the case of a | |||
| provincial or municipal project benefiting two | |||
| or more municipalities, each municipality | |||
| concerned shall be entitled to the said P25,000 | P200,000.00 | ||
| Provided, That notwithstanding the above | |||
| requirements, the sum of P10,000 shall be released | |||
| for Merida Waterworks, Leyte; P20,000 for | |||
| Cavinti Waterworks, Laguna; P2,000 for | |||
| Mendez Waterworks System, Cavite; P2,000 | |||
| for the Initao Water Reservoir, Oriental Misamis; | |||
| and P3,000 for waterworks system at Silang, Cavite. |
E. RIVER PROTECTION WORKS
| (j) | For the survey, investigation, construction, maintenance | |||
| and improvement of the following river protection works | ||||
| 1. | For the maintenance, improvement and extension | |||
| of the Agno River control works, Pangasinan | 25,000.00 | |||
| 2. | For the construction of Bigaa River control | |||
| works, Bulacan | 2,500.00 | |||
| 3. | For the construction of the Wawang Palanas dyke, | |||
| Lemery, Batangas | 1,000.00 | |||
| 4. | For the construction of Abra River control works, | |||
| Bangued, Abra | 10,000.00 | |||
| 5. | For the construction of Talisay River control | |||
| works, Bataan | 10,000.00 | |||
| 6. | For the construction of Gandara River dyke, Samar | 5,000.00 | ||
| 7. | For the construction of Guinobatan dyke, Albay | 5,000.00 | ||
| 8. | For the construction of Oas River control | |||
| works, Albay | 5,000.00 | |||
| 9. | For the construction of Tolong River control | |||
| works, Oriental Negros | 5,000.00 | |||
| 10. | Pampanga River and Sexmoan River control | |||
| works, Pampanga | 20,000.00 | |||
| 11. | Maintenance of Abacan River control | |||
| works, Pampanga | 5,000.00 | |||
| 12. | Boac River revetment, Marinduque | 2,000.00 | ||
| 13. | Abra River control works, Santa, Ilocos Sur | 20,000.00 | ||
| 14. | Santa Cruz River control works, Ilocos Sur | 10,000.00 | ||
| 15. | Anilao River dyke, Ormoc, Leyte | 10,000.00 |
F. CONSTRUCTION OF LIGHTHOUSES, BUOYS AND BEACONS
| (k) | For the construction of lighthouses, buoys, beacons | ||
| and other aids to navigation | 50,000.00 |
G. CONSTRUCTION OF TELEGRAPH AND CABLE LINES AND RADIO STATIONS
| (l) | For the construction of telegraph and cable lines and | ||
| radio stations | 50,000.00 |
H. INVESTIGATION, CONSTRUCTION AND IMPROVEMENT OF PORT WORKS AND SEA WALLS
| (m) | For the investigation, construction and improvement of | ||||
| port works as follows: | |||||
| 1. | Port of Legaspi, Albay | 200,000.00 | |||
| 2. | Port of Tabaco, Albay | 45,000.00 | |||
| 3. | Port of Virac (Catanduanes), Albay | 40,000.00 | |||
| 4. | Port of Batangas, Batangas | 35,000.00 | |||
| 5. | Port of Loay, Bohol | 25,000.00 | |||
| 6. | Port of Jetafe, Bohol | 20,000.00 | |||
| 7. | Port of Tagbilaran, Bohol | 70,000.00 | |||
| 8. | Port of Ivana, Batanes | 5,000.00 | |||
| 9. | Port of Uyugan, Batanes | 5,000.00 | |||
| 10. | Port of Basco, Batanes | 20,000.00 | |||
| 11. | Port of Aparri, Cagayan | 300,000.00 | |||
| 12. | Port of Capiz, Capiz | 30,000.00 | |||
| 13. | Port of New Washington, Capiz- | 5,000.00 | |||
| 14. | Port of Toledo, Cebu | 20,000.00 | |||
| 15. | Port of Pilar, Cebu | 15,000.00 | |||
| 16. | Port of Cotabato, Cotabato | 25,000.00 | |||
| 17. | Port of Parang, Cotabato | 20,000.00 | |||
| 18. | Port of Davao, Davao | 50,000.00 | |||
| 19. | Port of San Ildefonso, Ilocos Sur | 200,000.00 | |||
| 20. | Port of Cabugao, Ilocos Sur | 80,000.00 | |||
| 21. | Port of Solvec, Ilocos Sur | 70,000.00 | |||
| 22. | Port of Currimao (Gaan Bay), Ilocos Norte | 80,000.00 | |||
| 23. | Port of Estancia, Iloilo | 15,000.00 | |||
| 24. | Port of Tacloban, Leyte | 50,000.00 | |||
| 25. | Port of Palompon, Leyte | 50,000.00 | |||
| 26. | Port of San Isidro, Leyte | 10,000.00 | |||
| 27. | Port of Iligan, Lanao | 15,000.00 | |||
| 28. | Port of Manila | 200,000.00 | |||
| 29. | Port of Santa Cruz, Marinduque | 25,000.00 | |||
| 30. | Port of Misamis, Occidental Misamis | 35,000.00 | |||
| 31. | Port of Oroquieta, Occidental Misamis | 50,000.00 | |||
| 32. | Port of Jimenez, Occidental Misamis | 25,000.00 | |||
| 33. | Port of Cagayan, Occidental Misamis | 20,000.00 | |||
| 34. | Port of Pulupandan, Occidental Negros | 40,000.00 | |||
| 35. | Port of Mambajao, Oriental Misamis | 15,000.00 | |||
| 36. | Port of Guihulngan, Oriental Negros | 30,000.00 | |||
| 37. | Port of Coron, Palawan | 20,000.00 | |||
| 38. | Port of Cuyo, Palawan | 10,000.00 | |||
| 39. | Port of Agutaya, Palawan | 5,000.00 | |||
| 40. | Port of Bacuit, Palawan | 5,000.00 | |||
| 41. | Port of Odiongan, Romblon | 70,000.00 | |||
| 42. | Carcar wharf, Cebu | 10,000.00 | |||
| 43. | Sogod wharf, Cebu | 10,000.00 | |||
| 44. | San Fernando wharf, Cebu | 15,000.00 | |||
| 45. | Port of Catbalogan, Samar | 40,000.00 | |||
| 46. | Port of Borongan, Samar | 40,000.00 | |||
| 47. | Port of Guiuan, Samar | 30,000.00 | |||
| 48. | Port of Tandag, Surigao | 25,000.00 | |||
| 49. | Port of Mauo, Allen, Samar | 20,000.00 | |||
| 50. | Port of Jolo, Sulu | 40,000.00 | |||
| 51. | Port of Jagna, Bohol | 30,000.00 | |||
| 52. | Port of Surigao, Surigao | 20,000.00 | |||
| 53. | Port of Dapa, Surigao | 20,000.00 | |||
| 54. | Port of Polillo, Tayabas | 50,000.00 | |||
| 55. | Port of Zamboanga, Zamboanga | 50,000.00 | |||
| 56. | Port of Puluan, Zamboanga | 15,000.00 | |||
| 57. | Port of Lobo, Batangas | 25,000.00 | |||
| 58. | Port of Nasugbu, Batangas | 100,000.00 | |||
| 59. | Port of Mambulao, Camarines Norte | 80,000.00 | |||
| 60. | Port of San Sebastian, Samboan, Cebu | 44,000.00 | |||
| 61. | Port of Tabuelan, Cebu | 10,000.00 | |||
| 62. | Port of Glan, Cotabato | 15,000.00 | |||
| 63. | Port of Mati, Davao | 20,000.00 | |||
| 64. | Port of Biliran, Leyte | 10,000.00 | |||
| 65. | Port of Naval, Leyte | 15,000.00 | |||
| 66. | Port of Calubian, Leyte | 10,000.00 | |||
| 67. | Port of Ormoc, Leyte | 40,000.00 | |||
| 68. | Port of Merida, Leyte | 15,000.00 | |||
| 69. | Port of Tampi, Ayuquitan, Oriental Negros | 20,000.00 | |||
| 70. | Port of Dumaguete, Oriental Negros | 15,000.00 | |||
| 71. | Port of San Esteban, Ilocos Sur | 50,000.00 | |||
| 72. | Port of Pagsañgan (Tarangnan), Samar | 15,000.00 | |||
| 73. | Port of Magallanes, Sorsogon | 30,000.00 | |||
| 74. | Nagabungan wharf, Pasuquin, Ilocos Norte | 20,000.00 | |||
| 75. | Port of Sorsogon, Sorsogon | 25,000.00 | |||
| 76. | Port of Sitanki, Sulu | 30,000.00 | |||
| 77. | Wharf at Masantol, Pampanga | 30,000.00 | |||
| 78. | Port of Mauban, Tayabas | 50,000.00 | |||
| 79. | Wharf and landing, Sexmoan, Pampanga | 30,000.00 | |||
| 80. | Port of Sibonga, Cebu | 30,000.00 | |||
| 81. | Port of Villaba, Leyte | 15,000.00 | |||
| 82. | Port of Sogod, Leyte | 10,000.00 | |||
| 83. | Port of Lilo-an, Leyte | 10,000.00 | |||
| 84. | Port of Tubigon, Bohol | 40,000.00 | |||
| 85. | Port of Leyte, Leyte | 10,000.00 | |||
| 86. | Kawayan wharf, Leyte | 5,000.00 | |||
| 87. | Wharf at Bato, Leyte | 10,000.00 | |||
| 88. | Port of Argao, Cebu | 10,000.00 | |||
| 89. | Port of Infanta, Tayabas | 35,000.00 | |||
| 90. | Port of Casiguran, Tayabas | 20,000.00 | |||
| 91. | Port of Pulangbato, Bogo, Cebu | 50,000.00 | |||
| 92. | Port of Cawayan, Catarman, Samar | 10,000.00 | |||
| 93. | Port of Zumarraga, Samar | 10,000.00 | |||
| 94. | Babatngon wharf, Leyte | 5,000.00 | |||
| 95. | Abuyug wharf, Leyte | 5,000.00 | |||
| 96. | Port of Bulan, Sorsogon | 60,000.00 | |||
| 97. | Daanbantayan wharf, Cebu | 20,000.00 | |||
| 98. | Minglanilla wharf, Cebu | 10,000.00 | |||
| 99. | Port of Cabalian, Leyte | 10,000.00 | |||
| 100. | Port of Bugtong-Bato, Ibajay, Capiz | 25,000.00 | |||
| 101. | Gubat wharf, Sorsogon | 5,000.00 | |||
| 102. | Dagupan wharf, Pangasinan | 10,000.00 | |||
| 103. | Donsol causeway and wharf, Pangasinan | 15,000.00 | |||
| 104. | San Sebastian seawall, Wright, Samar | 10,000.00 | |||
| 105. | Pola wharf, Mindoro | 10,000.00 | |||
| 106. | Atimonan seawall, Tayabas | 20,000.00 | |||
| 107. | Gabu wharf, Ilocos Norte | 10,000.00 | |||
| 108. | Aurora wharf, Tayabas | 5,000.00 | |||
| 109. | Orion seawall, Bataan | 15,000.00 | |||
| 110. | Lazi wharf, Siquijor, Oriental Negros | 10,000.00 | |||
| 111. | Malabuyuc seawall, Cebu | 10,000.00 | |||
| 112. | Mambulao seawall, Camarines Norte | 5,000.00 | |||
| 113. | Basey seawall, Samar | 35,000.00 | |||
| 114. | Mauban seawall, Tayabas | 20,000.00 | |||
| 115. | Navotas seawall, Rizal | 15,000.00 | |||
| 116. | Guinayangan seawall, Tayabas | 10,000.00 | |||
| 117. | Calauag seawall, Tayabas | 10,000.00 | |||
| 118. | Biliran seawall, Leyte | 5,000.00 | |||
| 119. | Caibiran seawall, Leyte | 5,000.00 | |||
| 120. | Abuyug seawall, Leyte | 5,000.00 | |||
| 121. | Talisay seawall, Cebu | 10,000.00 | |||
| 122. | Catarman breakwater, Samar | 6,000.00 | |||
| 123. | Allen breakwater, Samar | 3,000.00 | |||
| 124. | Lavezares wharf, Samar | 10,000.00 | |||
| 125. | Dalupirit wharf, San Antonio, Samar | 1,500.00 | |||
| 126. | Port of Poro, Cebu | 10,000.00 | |||
| 127. | For the Claveria wharf, Cagayan | 30,000.00 | |||
| 128. | Abulug seawall and hurdles, Cagayan | 30,000.00 | |||
| Provided, That subject to the approval of the Secretary | |||||
| of Public Works and Communications and with such | |||||
| security as he may require, materials derived from dredging | |||||
| may be used for filling in private property at the request | |||||
| of any landowners upon the condition that the cost | |||||
| thereof shall be paid by the owner of the land in annual | |||||
| installments not to extend over more than five years: | |||||
| Provided, further, That in case of marine accident | |||||
| caused by Government owned equipment, payment, | |||||
| which in no case shall exceed P10,000, for damages | |||||
| may be paid out of the "Port Works Fund," subject | |||||
| to the approval of the Secretary of Public Works | |||||
| and Communications. | |||||
| (n) | For the investigation and survey of port works | ||||
| projects and foreshore leases | P40,000.00 | ||||
| —————— | |||||
| Total available for appropriation under this Act, | |||||
| to be paid out of the "Port Works Fund" | |||||
| under Act 3592 | 3,934,500.00 | ||||
| ========== | |||||
| Grand total of the appropriations made in this Act: | |||||
| SEVEN MILLION, FOUR HUNDRED | |||||
| THIRTY-SEVEN THOUSAND, FIVE | |||||
| HUNDRED PESOS | P7,437,500.00 | ||||
| ========== |
SECTION 2. All balances of the several appropriations made by this Act, with the exception of the appropriations in paragraphs (d) and (g), the destination of which has not been determined by proper authority on December thirty-first, nineteen hundred and thirty-five, and all balances of appropriations remaining unexpended on December thirty-first, nineteen hundred and thirty-six, shall revert to the unappropriated funds in the Insular Treasury, and thereafter shall not be available for expenditures except upon appropriation by the Legislature: Provided, however, That all balances of the appropriations made by this Act in paragraph (m) the destination of which has not been determined by proper authority on December thirty-first, nineteen hundred and thirty-five, and all balances of appropriations made in paragraph (m) remaining unexpended on December thirty-first, nineteen hundred and thirty-six, shall revert to the "Port Works Fund" created by Act Numbered Three thousand five hundred and ninety-two, and thereafter shall not be available for expenditure except as provided in said Act.
SECTION 3. The sums appropriated in paragraphs (d), (g), (h), (i), (k), (l), and (n) shall be distributed in the discretion of the Secretary of Public Works and Communications, but those appropriated in the other paragraphs shall be available for immediate expenditure by the Director of Public Works.
SECTION 4. This Act shall take effect on January first, nineteen hundred and thirty-five.
Approved, December 6, 1934, with the exception of the following items:
SECTION 1-A (c): Abra, items numbered 2, 4, 5, 8, 9 and 10, disapproved; Albay, items numbered 3, 7, 11, 13, 14, 21, 24, 27, 29, 30, 31, 32 and 33, disapproved; Antique, items numbered 4 and 6, disapproved; Bataan, items numbered 1, 4, 8, 9, 10, 10a and 11, disapproved; Batanes, items numbered 1 and 6, disapproved; Batangas, items numbered 1, 2, 3, 4, 10, 12, 13, 14, 15, 19, 20, 22, 24, 25, 26, 27 and 31, disapproved; Bohol, items numbered 2, 7, 8, 9, 10, 11, 13, 16, 17, 19, 20, 21, 22, 24, 25, 26, 30, 31, 32, 33, 34, 37, 38, 40, 44, 45, 46, 47, 50, 51, 52, 53, 54, 56, 57, 58, 59, 60, 62, 65, 66, 67, 68, 72, 74, 75, 78, 79, 80, 84 and 87, disapproved; Bulacan, items numbered 2, 6, 8, 10, 15, 19, 24, 28, 30, 33, 35, 36, 38, 40, 42, 43, 44, 46, 53, 54, 55 and 56, disapproved; Cagayan, items numbered 3, 5, 8, 9, 10, 11, 15, 16, 17, 18, 19, 21, 24, 25, 25a, 25b, 26, 28, 30, 32, 34, 37, 38, 40, 45 and 46, disapproved; Camarines Norte, items numbered 3, 4 and 5, disapproved; Camarines Sur, items numbered 6, 7, 10, 11 and 18, disapproved; Capiz, items numbered 3, 7, 8, 15, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 28, 29, 30, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43 and 45, disapproved; Cavite, items numbered 4, 6, 7 and 8, disapproved; Cebu, items numbered 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 16, 18, 19, 20, 23, 24, 25, 27, 30, 31, 32, 33, 36, 37, 39, 40, 41, 42, 44, 47, 48, 49, 50, 51, 53, 54, 55, 56, 58, 60, 61, 64, 65, 69, 70 and 71, disapproved; Cotabato, item numbered 1, disapproved; Ilocos Norte, items numbered 2, 3, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 17, 19, 20, 23, 25, 26, 28, 32, 33, 34, 35, 36, 41, 43, 44, 45, 46, 47, 48, 50, 53, 54, 56, 57, 60, 61, 62, 63, 64, 66, 67, 68, 69, 70, 72, 73, 75 and 76, disapproved; Ilocos Sur, items numbered 1, 4, 6, 7, 8, 19, 20, 21, 22, 27, 28, 29, 30, 31, 34, 35, 37, 38, 39, 40, 41, 42, 43, 44, 45, 48, 49, 50, 51, 54, 55, 56, 58, 61, 62, 63, 64, 69, 70, 71, 72 and 73, disapproved; Iloilo, items numbered 1, 2, 3, 7, 12, 14, 16, 17, 18, 19, 20, 23, 24, 25, 26, 28, 30, 31 and 32, disapproved; Isabela, items numbered 1, 2, 3, 5, 6, 7, 9, 10, 11, 12, 13, 14, 16, 17, 21 and 22, disapproved; Laguna, items numbered 1, 3, 5, 7, 8, 9 and 13, disapproved; La Union, items numbered 1, 2, 4, 12, 14, 16, 17 and 18, disapproved; Leyte, items numbered 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 14, 16, 17, 19, 20, 21, 24, 25, 26, 27, 28, 30, 32, 34, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 49, 50, 51, 53, 54, 55, 58, 60, 62, 63 and 64, disapproved; Manila, items numbered 4, 5, 6 and 7, disapproved; Marinduque, items numbered 3, 4, 10, 11, 12, 13, 15, 16, 17, 18, 20 and 21, disapproved; Masbate, items numbered 1 and 5, disapproved; Mindoro, items numbered 1, 6, 7, 8, 10, 13, 14, 15, 16 and 17, disapproved; Nueva Ecija, items numbered 3, 4, 7, 11, 14, 16, 19, 20, 21, 22, 23, 27, 28, 29, 30, 31, 33 and 34, disapproved; Occidental Misamis, items numbered 6, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23 and 24, disapproved; Oriental Misamis, items numbered 1, 6, 7, 9, 10, 12, 13, 14, 15, 16, 18, 19 and 20, disapproved; Occidental Negros, items numbered 1, 3, 5, 9, 11, 12, 13, 15, 16, 18 and 21, disapproved; Oriental Negros, items numbered 1, 4, 5, 6, 8, 9, 12, 15, 16, 17, 18, 25, 26, 28, 29, 30, 31 and 32, disapproved; Palawan, items numbered 1, 3, 5, 6, 9, 13, 14 and 16, disapproved; Pampanga, items numbered 1, 2, 7, 12, 21, 23, 24, 28, 30, 32, 34, 35, 39, 41 and 43, disapproved; Pangasinan, items numbered 1, 2, 3, 4, 6, 9, 10, 15, 20, 21, 24, 25, 26, 27, 30, 34, 37, 39, 40, 41, 44, 45, 47, 50, 51, 69, 70, 71, 74, 75, 77, 78, 79, 83, 84, 85, 86, 87, 89, 95, 97 and 98, disapproved; Rizal, items numbered 6, 7, 10, 11, 14, 16, 17, 18, 19, 20, 31, 32, 34, 36, 37, 38, 39, 41, 42, 44 and 48, disapproved; Romblon, items numbered 1, 2, 4, 6, 8, 9 and 11, disapproved; Samar, items numbered 1, 2, 4, 5, 7, 8, 9, 10, 11, 12, 20, 32, 34, 35, 36, 39, 42, 43, 44, 45, 48, 49, 50, 51, 52, 55, 56, 59, 63, 64, 68, 69, 71, 72, 75, 77, 78, 80 and 81, disapproved; Sorsogon, items numbered 9, 10 and 14, disapproved; Surigao, items numbered 1, 4, 5, 9, 10, 13, 15, 16, 17, 18, 22 and 23, disapproved; Tarlac, items numbered 1, 2, 3, 4, 6, 7, 9, 10, 11, 12, 13, 14, 15, 17, 24, 27, 28, 29 and 30, disapproved; Tayabas, items numbered 2, 4, 5, 6, 8, 9, 11, 13, 14, 16, 17, 19, 20, 21, 24, 25, 26 and 27, disapproved; Zambales, items numbered 3 and 4, disapproved.
SECTION 1-B (e) : Items numbered 11 and 13, disapproved.
SECTION 1-B (f): Albay, items numbered 1, 2, 3, 7, 8 and 9, disapproved; Batangas, items numbered 1, 2 and 3, disapproved; Bulacan, item numbered 2, disapproved; Camarines Norte, item numbered 1, disapproved; Camarines Sur, item numbered 1, disapproved; Cebu, items numbered 1, 2, 5 and 6, disapproved; Ilocos Norte, items numbered 1, 2 and 3, disapproved; Ilocos Sur, items numbered 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 and 12, disapproved; Iloilo, items numbered 2, 3 and 5, disapproved; Laguna, item numbered 1, disapproved; Manila, item numbered 1, disapproved; Marinduque, items numbered 1, 2 and 3, disapproved; Mindoro, items numbered 1 and 2, disapproved; Nueva Ecija, item numbered 2, disapproved; Negros Occidental, items numbered 1, 2, 3 and 4, disapproved; Oriental Negros, item numbered 1, disapproved; Palawan, item numbered 2, disapproved; Pampanga, items numbered 1, 2, 3, 4, 5, 6, 7, 8 and 9, disapproved; Pangasinan, items numbered 1, 2 and 3, disapproved; Rizal, item numbered 1, disapproved; Sorsogon, item numbered 3, disapproved; Tayabas, items numbered 6, 10, 11, 12 and 13, disapproved; ACIESH
SECTION 1-D (i): The proviso reading as follows, Provided, That notwithstanding the above requirements, the sum of P10,000 shall be released for Merida Waterworks, Leyte; P20,000 for Cavinti Waterworks, Laguna; P2,000 for Mendez Waterworks System, Cavite; P2,000 for the Initao Water Reservoir, Misamis Oriental; and P3,000 for waterworks system at Silang, Cavite", disapproved.
SECTION 1-E (j) : Items numbered 2, 6, 7 and 14, disapproved.
SECTION 1-H (m): Items numbered 35, 39, 42, 43, 44, 66, 74, 77, 79, 86, 87, 92, 95, 97, 98, 99, 101, 102, 103, 104, 106, 107, 108, 109, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125 and 128, disapproved.
Cite This Law
Public Works Act, Act No. 4180, Dec 6, 1934 (Philippines)
Public Works Act, Act No. 4180 (Phil. 1934)
Related Laws
- An Act Making Appropriations for Public WorksAct No. 3044 • Mar 10, 1922 • Statutes
- An Act Making Appropriations for Public WorksAct No. 2736 • Feb 15, 1918 • Statutes
- An Act Making Appropriations for Public WorksAct No. 3113 • Mar 19, 1923 • Statutes
- An Act Making Appropriations for Public WorksAct No. 2059 • Feb 3, 1911 • Statutes
- An Act Appropriating Funds for Public Works, Synchronizing the Same with Previous Public Works ActsRepublic Act No. 2301 • Jun 19, 1959 • Statutes
- An Act Making Appropriations for Public WorksAct No. 2786 • Dec 21, 1918 • Statutes
Browse More Statutes
Explore other laws in the Statutes category.
View All StatutesNeed Help Understanding This Law?
Ask our AI assistant to explain provisions, implications, or related laws.
Ask AI About This Law