Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services
The LTFRB Memorandum Circular No. 034-17 establishes guidelines for the implementation of Premium Point-to-Point Bus Services in the Philippines, as authorized under Executive Order No. 202. It outlines specifications for bus units, including requirements for emissions, accessibility features, and passenger amenities, such as on-board Wi-Fi and automated fare collection systems. The circular also details the operational conditions, including designated stops and maximum headways during peak hours. Additionally, it sets forth qualification requirements for applicants seeking to operate these services, including legal, technical, and financial documentation. The memorandum aims to enhance public transportation safety, efficiency, and convenience in urban areas.
Quick Answers
- What is Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services about?
- The LTFRB Memorandum Circular No. 034-17 establishes guidelines for the implementation of Premium Point-to-Point Bus Services in the Philippines, as authorized under Executive Order No. 202. It outlines specifications for bus units, including requirements for emissions, accessibility features, and passenger amenities, such as on-board Wi-Fi and automated fare collection systems. The circular also details the operational conditions, including designated stops and maximum headways during peak hours. Additionally, it sets forth qualification requirements for applicants seeking to operate these services, including legal, technical, and financial documentation. The memorandum aims to enhance public transportation safety, efficiency, and convenience in urban areas.
- What type of law is LTFRB Memorandum Circular No. 034-17?
- Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services (LTFRB Memorandum Circular No. 034-17) is a Philippine Other Rules and Procedures enacted by the Congress of the Philippines.
- When was Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services enacted?
- Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services (LTFRB Memorandum Circular No. 034-17) was enacted on Dec 27, 2017.
- What is the citation for Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services?
- Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services, LTFRB Memorandum Circular No. 034-17, Dec 27, 2017 (Philippines)
Law Information
- Reference Number
- LTFRB Memorandum Circular No. 034-17
- Date Enacted
- Category
- Other Rules and Procedures
- Subcategory
- Land Transportation Franchising and Regulatory Board
- Jurisdiction
- Philippines
- Enacting Body
- Congress of the Philippines
Full Law Text
December 27, 2017
LTFRB MEMORANDUM CIRCULAR NO. 034-17
| SUBJECT | : | Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services |
Pursuant to Section 5 of Executive Order No. 202 empowering the Board "to prescribe and regulate routes of service, economically viable capacities and zones or areas of operation of public land transportation services provided by motorized vehicles in accordance with the public land transportation development plans and programs approved by the Department of Transportation and Communications" and "to formulate, promulgate, administer, implement and enforce rules and regulations on land transportation public utilities, standards of measurements and/or design, and rules and regulations requiring operators of any public land transportation service to equip, install and provide in their utilities and in their stations such devices, equipment facilities and operating procedures and techniques as may promote safety, n protection, comfort and convenience to persons and property in their charges as well as the safety n of persons and property within their areas of operations," the following implementing guidelines of Department Order No. 2015-018 on the Opening of Premium Point-to-Point Bus Service are hereby promulgated. HTcADC
I. PREMIUM POINT-TO-POINT BUS SERVICE
|
Bus Body Make |
: |
a) Single deck or double-deck (11-13 meters in length). Requirement for Double-deck unit is for MUCEP * area ** only. Coach (9-11 meters in length) for Packages 1 and 3 only; |
|
|
|
b) With external color/branding as specified by the Board; |
|
|
|
c) Euro IV or better emission standard or clean alternative fuel with equivalent or better emissions (e.g., electric or hybrid vehicles); |
|
|
|
d) Low floor/Low entry (0.28m-0.38m) with space for one passenger with wheelchair, plus foldable or retractable wheelchair ramp at exit; |
|
|
|
e) Maximum of four (4) reclining seats per row. |
|
Ventilation |
: |
Air-conditioned. |
|
Routes |
: |
As authorized by DOTr. |
|
Fare |
: |
As authorized by the Board. |
|
Operating conditions |
: |
a) Service with scheduled trips and designated off-street stops for loading/unloading passengers. Designated off-street stops for loading/unloading passengers may be distributed within the origin and destination; |
|
|
|
b) No loading/unloading of passengers outside of designated off-street stops; |
|
|
|
c) With on-board CCTV, 4 cameras, continuous recording of minimum past 72 hours of bus operations; |
|
|
|
d) With vehicle tracking via on-board GNSS devices compliant with Board's specifications and driver console enabling two-way communication; |
|
|
|
e) With free wi-fi for all passengers; |
|
|
|
f) With on-board automated bus arrival electronic display and announcement system; |
|
|
|
g) With automatic fare collection system as one of the options for payment; |
|
|
|
h) Drivers under fixed salary, with no compensation linked to ridership, but with incentives for better customer service, no traffic violation and reduction of accidents; |
|
|
|
i) With facility for advance ticketing and seat booking via mobile phone and internet; |
|
|
|
j) With lay-over area/garage sufficient to accommodate all units (space provision of at least 40 sqm. per unit for 11-13 meter bus and at least 30 sqm. per unit for 9-11 meter coach plus 30% of garage area for circulation; this should be over and above existing garage/depot space of their current bus fleet). |
II. ADDITIONAL PACKAGE OF ROUTES FOR SELECTION
Pursuant to the Memoranda dated 17 April 2017 and 22 June 2017 duly signed by DOTr Secretary Arthur P. Tugade and Undersecretary Anneli P. Lontoc, including clarificatory instructions from DOTr, the additional fourteen (14) franchise packages for Premium Point-to-Point Bus Service, with a total of twenty-four (24) routes, are listed below. Each package will be awarded to one (1) qualified Applicant. A qualified Applicant may be selected for more than one (1) package. The terms and conditions of these packages will be subject to review at least 6 months after the commencement of operations:
Package 1
1. PASIG (CITY PROPER)-ORTIGAS CBD
|
Route Length |
: |
Approximately 5 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Thirty Pesos (Php30.00) |
2. PASIG (CITY PROPER)-MAKATI CBD
|
Route Length |
: |
Approximately 9 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Fifty-Five Pesos (Php55.00) |
Package 2
1. PASAY-MAKATI CBD
|
Route Length |
: |
Approximately 7 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Forty-Five Pesos (Php45.00) |
2. LAS PIÑAS-MAKATI CBD
|
Route Length |
: |
Approximately 18 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Fifteen Pesos (Php115.00) |
Package 3
1. TAGUIG (CITY PROPER)-ORTIGAS CBD
|
Route Length |
: |
Approximately 11 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Seventy Pesos (Php70.00) |
2. TAGUIG (CITY PROPER)-MAKATI CBD
|
Route Length |
: |
Approximately 9 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Fifty-Five Pesos (Php55.00) |
Package 4
1. SUCAT-LAWTON
|
Route Length |
: |
Approximately 20 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Twenty Five Pesos (Php125.00) |
2. ALABANG-LAWTON
|
Route Length |
: |
Approximately 28 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Eighty Pesos (Php180.00) |
Package 5
1. BACOOR-MAKATI CBD
|
Route Length |
: |
Approximately 18 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Ten Pesos (Php110.00) |
2. IMUS-MAKATI CBD
|
Route Length |
: |
Approximately 24 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Fifty Pesos (Php150.00) |
Package 6
1. NOVELETA-MAKATI CBD
|
Route Length |
: |
Approximately 25 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Sixty Pesos (160.00) |
2. DASMARIÑAS-MAKATI CBD (VIA DAANGHARI)
|
Route Length |
: |
Approximately 38 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Two Hundred Forty Pesos (Php240.00) |
Package 7
1. MALOLOS-NORTH EDSA
|
Route Length |
: |
Approximately 38 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Two Hundred Forty Pesos (Php240.00) |
2. BOCAUE/STA. MARIA-NORTH EDSA
|
Route Length |
: |
Approximately 27 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Seventy Pesos (Php170.00) |
3. MALABON/NAVOTAS-PASAY (VIA R10)
|
Route Length |
: |
Approximately 19 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Twenty Pesos (Php120.00) |
Package 8
1. NAIA-ALABANG
|
Route Length |
: |
Approximately 17 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Ten Pesos (Php110.00) |
2. NAIA-STA. ROSA, LAGUNA
|
Route Length |
: |
Approximately 30 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Ninety Pesos (Php190.00) |
Package 9
1. NAIA-CUBAO
|
Route Length |
: |
Approximately 16 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
One Hundred Pesos (Php100.00) |
2. NAIA-ORTIGAS CBD
|
Route Length |
: |
Approximately 11 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Seventy Pesos (Php70.00) |
Package 10
CLARK-MALOLOS, BULACAN (special stop at Mabalacat, Pampanga)
|
Route Length |
: |
Approximately 70 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
15 units |
|
One-way Fare |
: |
Two Hundred Ten Pesos (Php210.00) |
|
|
: |
Twenty Pesos (Php20.00) for Mabalacat |
Package 11
CLARK-TARLAC CITY, TARLAC (special stops at Mabalacat, Pampanga and Bamban, Tarlac)
|
Route Length |
: |
Approximately 38 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
20 units |
|
One-way Fare |
: |
One Hundred Fifteen Pesos (Php115.00) |
|
|
: |
Twenty Pesos (Php20.00) for Mabalacat |
|
|
: |
Forty Pesos (Php40.00) for Bamban |
Package 12
CLARK-SAN JOSE, NUEVA ECIJA (special stop at Cabanatuan, Nueva Ecija)
|
Route Length |
: |
Approximately 106 kilometers |
|
Specific Endpoint Stops |
: |
Proposed by the Applicant |
|
Maximum Headway One Year after Start of Operation |
: |
10 minutes during peak hours in the direction of rider demand and 30 minutes during off peak hours |
|
Authorized Units |
: |
20 units |
|
One-way Fare |
: |
Three Hundred Twenty Pesos (Php320.00) |
|
|
|
Two Hundred Forty Five Pesos (Php245.00) for Cabanatuan |
Peak hours are defined as 6:00 am to 8:00 am and 5:00 pm to 7:00 pm. A minimum of twenty five percent (25%) of the required units should be in service within three (3) months from Notice of Selection. A minimum of fifty percent (50%) of the required units should be in service within six (6) months from Notice of Selection. A minimum of seventy five percent (75%) of the required units should be in service within nine (9) months from Notice of Selection. The remainder of the required fleet should be in service within a year from Notice of Selection. At least twenty-five percent (25%) of the fleet should be double-decker units except for packages/routes wherein the roads and geographical conditions (i.e., mountainous terrains) may warrant the inappropriate use of double-decker units. The selected operator will be required to operate an interim service under special permit using either its own units or leased/chartered units. DETACa
III. QUALIFICATION REQUIREMENTS
Applicants must submit all the Legal, Technical, and Financial Capability Qualification Documents (collectively referred to as "Qualification Documents") provided below.
1. Legal Qualification
a) Filipino citizen who is at least eighteen (18) years old:
a.1) Certified true copy of Birth Certificate duly issued by the Philippine Statistics Authority.
b) Filipino domestic juridical entity with a primary purpose to provide transportation services:
b.1) if corporation or partnership, Certified True Copies of Certificate of Filing/Registration, Articles and By-laws, and latest General Information Sheet duly issued/received by the Securities and Exchange Commission;
b.2) if joint ventures or consortia of local firms, Certified True Copies of Certificate of Filing/Registration, Articles and By-laws, latest General Information Sheet duly issued/received by the Securities and Exchange Commission and proof that the members of the consortium have bound themselves jointly and severally to assume responsibility for the project. The withdrawal of any member of the consortium prior to the implementation of the project could be a ground for the cancellation of the accreditation;
b.3) n if cooperative, Certified True Copies of Certificate of Registration, Articles and By-laws, and latest Cooperative Annual Performance Report duly issued/received by the Cooperative Development Authority.
2. Technical Qualification
The Applicant must provide the following:
a) Schematic Diagram of the unit with seating configuration;
b) Proposed delivery schedule of the units with notarized Certification from supplier, assembler, or manufacturer, if based in the Philippines; if based outside of the Philippines, the Certification must be authenticated by a Philippine Consulate/Embassy;
c) Detailed map of the proposed route with location of specific off-street loading and unloading areas;
d) Copies of Letters of Support from property owners/managers regarding access to, or use of, each off-street loading and unloading area in the route map;
e) Scale map showing location and area of proposed garage/depot with separate space provision of at least 40 sqm. per unit plus 30% garage area for circulation; this should be over and above the existing garage/depot space of their current bus fleet; and,
f) Evidence of access to proposed garage/depot space (land ownership papers; or Letter of Support from property owners/managers regarding access to, or use of, bus depot site, in case Applicant is selected).
3. Financial Capability Qualification
The Applicant must provide the following:
a) Original or Certified true copy of Audited Financial Statement dated not earlier than 31 December 2016, stamped "received" by the Bureau of Internal Revenue or its Authorized Agent Banks.
b) Documents to prove that the applicant has available financial resources equivalent to or exceeding the amount of Php10 million pesos multiplied by the total number of vehicles for the package or packages above that the Applicant is applying for. Proof of available financial resources is primarily determined by the Applicant's Net Worth. If the Applicant's Net Worth is insufficient to cover the financial requirement of the package/s that the applicant intends to undertake, the same may be augmented by a credit line in favor of the applicant issued by a domestic universal or commercial bank duly licensed by the Bangko Sentral ng Pilipinas. Said credit line shall expressly state that same is earmarked to finance the required bus fleet under the package/s which the applicant intends to operate; and,
c) In case of joint ventures or consortia, proof of ability to provide the financial capability requirement measured in terms of the combined net worth of the members or a set-aside deposit equivalent to or exceeding the financial capability requirement as above mentioned. Set-aside deposit dedicated for the project (i.e., Point-to-Point Package/s applied for) cannot be withdrawn unless used for the package and must be duly certified by the depository bank;
d) Financial projections for the first five (5) years of operations, showing detailed revenues and costs, as well as projected demand, including assumptions made. ATICcS
IV. SUBMISSION OF QUALIFICATION DOCUMENTS
The Applicant shall submit one (1) original copy and two (2) photocopies containing a Table of Contents and bound together in ring binders or folders sealed in an envelope or a box and appropriately addressed and marked as follows:
|
LAND TRANSPORTATION FRANCHISING AND REGULATORY BOARD |
|
Premium Point-to-Point Bus Service |
|
QUALIFICATION DOCUMENTS |
|
PACKAGES APPLIED FOR: |
|
_____ Package 1 |
|
_____ Package 2 |
|
_____ Package 3 |
|
_____ Package 4 |
|
_____ Package 5 |
|
_____ Package 6 |
|
_____ Package 7 |
|
_____ Package 8 |
|
_____ Package 9 |
|
_____ Package 10 |
|
_____ Package 11 |
|
_____ Package 12 |
|
[NAME AND ADDRESS OF APPLICANT) |
|
DO NOT OPEN BEFORE ___________ |
The Qualification Documents must be submitted between 9:00 am and 2:00 pm (Philippine Standard Time) on Wednesday, January 31, 2018 at the Office of the Executive Director. Each set of the Qualification Documents submitted by an Applicant shall be numbered in the order received and stamped with the date and time of receipt.
Filing or submission of Qualification Documents after 2:00 pm on January 31, 2018 shall not be accepted.
A Pre-Qualification Conference will be held on Wednesday, January 10, 2018 at 2:00 pm.
V. THE PRE-QUALIFICATION COMMITTEE AND ITS PROCESS
A Pre-Qualification Committee for the Pre-Qualification Process is created:
|
Chairperson |
: |
LTFRB Executive Director |
|
Vice Chairperson |
: |
DOTr Assistant Secretary (Road Transport and Infrastructure) |
|
Member |
: |
LTFRB NCR Regional Director |
|
Member |
: |
LTFRB Legal Division Chief |
|
Member |
: |
LTFRB ISMD Division Chief |
Immediately after 2:00 pm on January 31, 2018, the Committee will begin the opening proceedings by announcing the names of the Applicants who have submitted Qualification Documents and any such other details as it may consider appropriate. The Committee will then proceed with the opening of the envelopes/boxes of each Applicant, one at a time and in the order in which the same are received. The Applicant or any duly authorized representative for each Applicant present during the opening proceedings shall register confirming their attendance.
VI. EVALUATION OF QUALIFICATION DOCUMENTS
The Committee shall examine the Qualification Documents within seven (7) days after the Submission Date of Qualification Documents. The detailed evaluation of the compliance by the Applicant with the Legal, Technical and Financial Capability Qualification Requirements shall be based solely upon the Qualification Documents submitted. The Committee may seek clarification from the Applicants on the form and contents of their Qualification Documents. The Committee may also make inquiries with any person, government authority, client organization, officer, director, employee or other agent of any Applicant or Affiliate of any of these for the purpose of clarifying any matter included in its Qualification Documents.
All submitted information and any clarifications requested by the Committee shall be assessed against the criteria for qualification as set out above and generally rated on a "PASS-or-FAIL" basis. An applicant will be rated as "QUALIFIED" if each criterion is rated "PASSED" and each required Qualification Document and attachment is completely submitted. The Applicant will be disqualified if any criterion is rated "FAILED" or if any required Qualification Document or attachment is missing. If there are two (2) or more qualified Applicants for a package, a public "lottery" with the presence of the qualified Applicants will determine which Applicant will be processed further. TIADCc
The Committee shall submit to the Board its recommendation for the latter's approval, which may issue a notice of selection.
The Applicant selected for each of the packages will be directed to submit an Application for the Issuance of a Certificate of Public Convenience with the Board together with all the documentary requirements for New CPC in accordance with LTFRB's Revised Citizen's Charter. Fifty percent (50%) of the allocated units per package should be available before the CPC shall be granted by the Board.
VII. ISSUANCE OF SPECIAL PERMIT FOR INTERIM SERVICE
The Applicant selected will be required to operate an interim service within fifteen (15) days from Notice of Selection with a minimum number of vehicles specified in the table below and compliant with the specifications in this section. The Applicant will be permitted to use either its own units or units that are leased or chartered from other operators, manufacturers or dealers. In its submission, the Applicant is required to include an Annex entitled "Annex A: Plan for (Route) Interim Service" which should contain (a) the list of the bus units that will be used in the interim service containing the name of the owner/operator, the make of the bus, and year model; (b) copies of the official receipts and certificates of registration of the units; and (c) passenger insurance documents for the said units.
For this purpose and pursuant to the above-mentioned DOTr Memorandum, the following guidelines shall govern the issuance of the Special Permits.
A. The Minimum and Maximum Number of Vehicles Required for the Interim Service and the One-Way Fare for Each Route Are the Following:
|
|
Route |
One-Way Fare (Maximum) |
Minimum Number of Vehicles (2/3 of Authorized Units) |
Maximum Number of Vehicles (Authorized Units) |
|
Package 1 |
Pasig (City Proper)-Ortigas CBD |
Php30.00 |
10 |
15 |
|
|
Pasig (City Proper)-Makati CBD |
Php55.00 |
10 |
15 |
|
Package 2 |
Pasay-Makati CBD |
Php45.00 |
10 |
15 |
|
|
Las Piñas-Makati CBD |
Php115.00 |
10 |
15 |
|
Package 3 |
Taguig (City Proper)-Ortigas CBD |
Php70.00 |
10 |
15 |
|
|
Taguig (City Proper)-Makati CBD |
Php55.00 |
10 |
15 |
|
Package 4 |
Sucat-Lawton |
Php125.00 |
10 |
15 |
|
|
Alabang-Lawton |
Php180.00 |
10 |
15 |
|
Package 5 |
Bacoor-Makati CBD |
Php110.00 |
10 |
15 |
|
|
Imus-Makati CBD |
Php150.00 |
10 |
15 |
|
Package 6 |
Noveleta-Makati CBD |
Php160.00 |
10 |
15 |
|
|
Dasmariñas-Makati CBD (via Daanghari) |
Php240.00 |
10 |
15 |
|
|
Malolos-North EDSA |
Php240.00 |
10 |
15 |
|
Package 7 |
Bocaue/Sta. Maria-North EDSA |
Php170.00 |
10 |
15 |
|
|
Malabon/Navotas-Pasay (via R10) |
Php120.00 |
10 |
15 |
|
Package 8 |
NAIA-Alabang |
Php110.00 |
10 |
15 |
|
|
NAIA-Sta. Rosa, Laguna |
Php190.00 |
10 |
15 |
|
Package 9 |
NAIA-Cubao |
Php100.00 |
10 |
15 |
|
|
NAIA-Ortigas CBD |
Php70.00 |
10 |
15 |
|
Package 10 |
Clark-Malolos, Bulacan (with limited stop at Mabalacat, Pampanga) |
Php210.00 (Mabalacat: 20.00) |
10 |
15 |
|
Package 11 |
Clark-Tarlac City, Tarlac (with limited stop at Mabalacat, Pampanga) |
Php115.00 (Mabalacat: 20.00; Bamban: 40.00) |
13 |
20 |
|
Package 12 |
Clark-San Jose, Nueva Ecija (with limited stop at Cabanatuan) |
Php320.00 (Cabanatuan: 245.00) |
13 |
20 |
The fares provided in the Table above are the maximum. Any reduction in fare shall be subject to the prior approval of the Board.
B. Bus Specifications:
1. Only the units authorized by the Board for use in the interim service must be deployed by the Applicant for use in the interim service.
2. The units must at least be air-conditioned, 9-13 meters in length, equipped with wi-fi internet connection, maximum four (4) seats per row, not more than 5 years old, and free of exterior dents, major blemishes or discoloration that could mar the external appearance of the vehicle.
3. The Board may reject vehicles with features or appearance that are not in keeping with the desired higher standards service.
4. Prior to operation, the vehicles should affix identifying markings/stickers as authorized by the Board for easy identification by riders and traffic enforcers.
C. Operating Conditions:
1. Peak hours shall be 6:00 am to 8:00 am and 5:00 pm to 7:00 pm; the interim should have a maximum headway of 30 minutes during peak hours for vehicles moving in the direction of passenger demand.
2. Applicants may offer at the time of their application more units than the above minimum number for a particular route, but not exceeding the number of authorized units per route. SDAaTC
VIII. REPEALING CLAUSE AND EFFECTIVITY
All other issuances inconsistent herewith are deemed modified or superseded accordingly.
This Memorandum circular shall take effect immediately following its publication in at least one newspaper of general circulation. Let three (3) copies hereof be filed with the UP Law Center pursuant to Presidential Memorandum Circular No. 11, dated 09 October 1992.
SO ORDERED.
Quezon City, Metro Manila, December 27, 2017.
(SGD.) ATTY. MARTIN B. DELGRA IIIChairman
(SGD.) ENGR. RONALDO F. CORPUSBoard Member
(SGD.) ATTY. AILEEN LOURDES A. LIZADABoard Member
Attested by:
(SGD.) ATTY. CARL SHA JEMIMAH F. MARBELLAOIC-Executive Director
Footnotes
* Metro Manila Urban Transportation Integration Study Update and Capacity Enhancement Project.
** As defined by the Department of Transportation (DOTr).
n Note from the Publisher: Written as "safely" in the original document.
n Note from the Publisher: Written as "b.2)" in the original document.
Cite This Law
Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services, LTFRB Memorandum Circular No. 034-17, Dec 27, 2017 (Philippines)
Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus Services, LTFRB Memorandum Circular No. 034-17 (Phil. 2017)
Related Laws
- Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus ServicesLTFRB Memorandum Circular No. 001-17 • Jan 20, 2017 • Other Rules and Procedures
- Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus ServicesLTFRB Memorandum Circular No. 2019-10 • Mar 5, 2019 • Other Rules and Procedures
- Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus ServicesLTFRB Memorandum Circular No. 014-17 • Jun 22, 2017 • Other Rules and Procedures
- Implementing Guidelines on the Opening of Proposed Additional Premium Point-to-Point Bus ServicesLTFRB Memorandum Circular No. 025-17 • Oct 13, 2017 • Other Rules and Procedures
- Implementing Guidelines of Department Order No. 2015-011 on the Opening of Airport Bus ServiceLTFRB Memorandum Circular No. 022-15 • Jul 1, 2015 • Other Rules and Procedures
- Amendment to Memorandum Circular No. 2017-001LTFRB Memorandum Circular No. 007-17 • Mar 29, 2017 • Other Rules and Procedures
Browse More Other Rules and Procedures
Explore other laws in the Other Rules and Procedures category.