HLURB Board Resolution No. 973, s. 2018
HLURB Board Resolution No. 973, issued on August 1, 2018, amends the implementing rules for Batas Pambansa Bilang 220 concerning socialized housing standards and requirements. It introduces new minimum lot and floor area specifications for various types of housing, aligning them with updated price ceilings set by HUDCC Resolution No. 1. Key amendments include definitions of lofts and ceiling height requirements, along with stipulations for saleable lots and pricing structures. Existing projects can utilize the new price ceiling if they secure necessary approvals and meet technical standards. Overall, these changes aim to enhance the development and affordability of socialized housing in the Philippines.
Quick Answers
- What is HLURB Board Resolution No. 973, s. 2018 about?
- HLURB Board Resolution No. 973, issued on August 1, 2018, amends the implementing rules for Batas Pambansa Bilang 220 concerning socialized housing standards and requirements. It introduces new minimum lot and floor area specifications for various types of housing, aligning them with updated price ceilings set by HUDCC Resolution No. 1. Key amendments include definitions of lofts and ceiling height requirements, along with stipulations for saleable lots and pricing structures. Existing projects can utilize the new price ceiling if they secure necessary approvals and meet technical standards. Overall, these changes aim to enhance the development and affordability of socialized housing in the Philippines.
- What type of law is HLURB Board Resolution No. 973, s. 2018?
- HLURB Board Resolution No. 973, s. 2018 (HLURB Board Resolution No. 973, s. 2018) is a Philippine Other Rules and Procedures enacted by the Congress of the Philippines.
- When was HLURB Board Resolution No. 973, s. 2018 enacted?
- HLURB Board Resolution No. 973, s. 2018 (HLURB Board Resolution No. 973, s. 2018) was enacted on Aug 1, 2018.
- What is the citation for HLURB Board Resolution No. 973, s. 2018?
- HLURB Board Resolution No. 973, s. 2018, HLURB Board Resolution No. 973, s. 2018, Aug 1, 2018 (Philippines)
Law Information
- Reference Number
- HLURB Board Resolution No. 973, s. 2018
- Date Enacted
- Category
- Other Rules and Procedures
- Subcategory
- Housing and Land Use Regulatory Board
- Jurisdiction
- Philippines
- Enacting Body
- Congress of the Philippines
Full Law Text
August 1, 2018
HLURB BOARD RESOLUTION NO. 973, s. 2018
AMENDING PERTINENT PROVISIONS OF THE REVISED IMPLEMENTING RULES AND REGULATIONS FOR BATAS PAMBANSA BILANG 220
WHEREAS, Batas Pambansa Blg. 220, Series of 1982, authorizes the Housing and Land Use Regulatory Board (HLURB) to establish and promulgate different levels of standards and technical requirements for the development of socialized housing projects in urban and rural areas from those provided in P.D. 957, P.D. 1216, P.D. 1096 and P.D. 1185; TAHIED
WHEREAS, the HLURB Board adopted, through Resolution No. 968, Series of 2018, the new tiered price ceiling for socialized subdivision projects as established and ordered in HUDCC Resolution No. 1, Series of 2018 otherwise known as "The Price Ceiling for Socialized Subdivision Projects";
WHEREAS, the same HUDCC Resolution No. 1, Series of 2018, directs the HLURB to formulate and issue the appropriate technical design and standards for socialized subdivision projects for the implementation of the new price ceilings;
WHEREFORE, BE IT RESOLVED, AS IT IS HEREBY RESOLVED, that the following amendments to the Revised Implementing Rules and Regulations (IRR) for B.P. 220, Series of 2001 be, as the same are hereby APPROVED.
1. That, the minimum lot area and floor area requirements of various types of socialized housing described in Section 5.C.2.b — Table 7. Minimum Lot Area and Section 5.C.4.a respectively, which corresponds to the new price ceiling therefor, shall be amended as follows:
|
Type of Housing |
Gross Floor Area |
Lot Area |
Price Ceiling |
|
Single Detached |
28 sq.m. with loft of at least 50% of the base structure; or
32 sq.m. – one storey; or
32 sq.m. – 2 storey structure (16 square meter per floor structure with a dimension of 4 meters x 4 meters) |
72.8 sq.m.
79.2 sq.m.
60.0 sq.m. |
P580,000.00 |
|
24 sq.m. with loft of at least 50% of the base structure; or
28 sq.m. – one storey |
66.4 sq.m.
72.8 sq.m. |
P530,000.00 |
|
|
22 sq.m. with loft of at least 50% of the base structure; or
24 sq.m. – one storey |
63.2 sq.m.
66.4 sq.m. |
P480,000.00 |
|
|
Duplex/Single Attached |
28 sq.m. with loft of at least 50% of the base structure; or
32 sq.m. – one storey; or
32 sq.m. – 2 storey structure (16 square meter per floor structure with a dimension of 4 meters x 4 meters) |
58.33 sq.m.
63.67 sq.m.
45.0 sq.m. |
P580,000.00 |
|
24 sq.m. with loft of at least 50% of the base structure; or
28 sq.m. – one storey |
53.0 sq.m.
58.33 sq.m. |
P530,000.00 |
|
|
22 sq.m. with loft of at least 50% of the base structure; or
24 sq.m. – one storey |
50.33 sq.m.
53.0 sq.m. |
P480,000.00 |
|
|
Row Houses |
28 sq.m. with loft of at least 50% of the base structure; or
32 sq.m. – one storey; or
32 sq.m. – 2 storey structure (16 square meters per floor structure with a dimension of 4 meters x 4 meters) |
40.25 sq.m.
44.25 sq.m.
30.0 sq.m. |
P580,000.00 |
|
24 sq.m. with loft of at least 50% of the base structure; or
28 sq.m. – one storey |
36.25 sq.m.
40.25 sq.m. |
P530,000.00 |
|
|
22 sq.m. with loft of at least 50% of the base structure; or
24 sq.m. – one storey |
34.25 sq.m.
36.25 sq.m. |
P480,000.00 |
2. That, a loft shall mean a partial, intermediate floor in any storey or room of a residential unit in a subdivision project having an area of one-half of the area of the room or space in which it is constructed and shall have a clear ceiling height of not less than 1.80 meters above and below it; DAEIHT
3. That, the minimum ceiling height for habitable rooms shall be measured from the finished floor line to the ceiling line, if a ceiling is not provided, a minimum headroom clearance of 2.0 meters shall be provided;
4. That, saleable lots designated as duplex/single-attached and/or row house lots shall be provided with housing components, and the price of saleable lots intended for single-detached units shall not exceed 40% of the maximum selling price for house and lot package.
5. That, all provisions in the revised IRR for BP 220 affected and/or inconsistent with the above cited amendments be revised and/or renumbered accordingly.
RESOLVED FURTHER, that socialized housing projects already issued Licenses to Sell with unsold and unconstructed units with measurements below the mandated minimum lot area and floor area requirements shall be sold at the existing price ceiling of Four Hundred Fifty Thousand Pesos (P450,000.00). However, a developer may avail of the new price ceiling provided an approved alteration of plans that conforms with the mandated technical design standards and requirements is secured from the local government unit, and an amended/new License to Sell is issued in its favor by the HLURB;
APPROVED, 01 August 2018, Quezon City. ECaTAI
(SGD.) EDUARDO DRUECO DEL ROSARIOHUDCC Chairman
(SGD.) AUSTERE A. PANADEROUndersecretary, DILG
(SGD.) LLOYD CHRISTOPHER A. LAOChief Executive Officer & Commissioner
(SGD.) DIMAS S. SOGUILONUndersecretary, DPWH
(SGD.) RIA CORAZON A. GOLEZ-CABRERACommissioner
(SGD.) SERGIO E. YAP IIAssistant Secretary, DOJ
(SGD.) MELZAR P. GALICIACommissioner
(SGD.) DANILO D. BARRAMEDADirector IV, Legal Staff, NEDA
Attested:
(SGD.) CHARITO B. LANSANGBoard Secretary
Cite This Law
HLURB Board Resolution No. 973, s. 2018, HLURB Board Resolution No. 973, s. 2018, Aug 1, 2018 (Philippines)
HLURB Board Resolution No. 973, s. 2018, HLURB Board Resolution No. 973, s. 2018 (Phil. 2018)
Related Laws
- Home Guaranty Corporation Board Resolution No. 45-2018Home Guaranty Corporation Board Resolution No. 45-2018 • Sep 13, 2018 • Other Rules and Procedures
- Resolution No. R-925, S. of 2015HLURB Administrative Order No. 004-16 • Feb 10, 2016 • Other Rules and Procedures
- Executive Committee Resolution No. 009, S. of 2016HLURB Administrative Order No. 002-17 • Apr 26, 2017 • Other Rules and Procedures
- MARINA Board Resolution No. 2018-09-01MARINA Board Resolution No. 2018-09-01 • Sep 20, 2018 • Other Rules and Procedures
- Ratifying Executive Committee Resolution No. 001, Series of 2017HLURB Board Resolution No. 950-17 • May 3, 2017 • Other Rules and Procedures
- Amending Certain Provisions of the 2004 Rules of Procedure of the Board (Board Resolution No. 765, s. 2004)HLURB Resolution No. 818-08 • Jul 21, 2008 • Other Rules and Procedures
Browse More Other Rules and Procedures
Explore other laws in the Other Rules and Procedures category.
View All Other Rules and ProceduresNeed Help Understanding This Law?
Ask our AI assistant to explain provisions, implications, or related laws.
Ask AI About This Law