The Philippine Department of Public Works and Highways (DPWH) issued Department Order No. 117-17, which outlines revised guidelines for determining major and similar categories of work in infrastructure contracts. It mandates that prospective bidders must have completed a Single Largest Completed Contract (SLCC) similar to the contract being bid, valued at a minimum of 50% of the Approved Budget for the Contract (ABC). The order defines various categories of works, eligibility requirements for bidders, and specific qualifiers that may be required based on the nature of the contract. Moreover, it establishes procedures for verifying work experience and compliance during the bidding process, aiming to enhance transparency and efficiency in public procurement. This order supersedes previous related directives and takes effect 15 days after publication.
September 14, 2017
DPWH DEPARTMENT ORDER NO. 117-17
| SUBJECT | : | Revised Guidelines for the Determination of Major and Similar Categories of Work and Eligibility Requirements for Work Experience in the Procurement of Infrastructure Contracts |
In compliance with Section 23.4.2.4 of Implementing Rules and Regulations of Republic Act 9184 stating that "the Prospective Bidder must have completed a Single Largest Completed Contract (SLCC) that is similar to the contract to be bid, and whose value, adjusted to current prices using the Philippine Statistics Authority (PSA) consumer price indices, must be at least fifty percent (50%) of the Approved Budget for the Contract (ABC) to be bid," the concerned DPWH Procuring Entities and Implementing Units shall use the guidelines in this Department Order to determine the work experience on contracts similar to the contract to be bid that a bidder/contractor must possess to be considered eligible to bid for an infrastructure contract involving different categories of works.
A. DEFINITION OF TERMS:
The following terms shall be interpreted in this Department Order as defined:
1. Major Category of Works — the main classification of works, for purposes of evaluation of eligibility for civil works, according to type of infrastructure and kind of work performed — e.g., road construction, or bridge rehabilitation, etc.
2. Similar Category of Works — a kind of work whose classification is considered to be comparable to the major category of works for purposes of evaluation of eligibility for civil works.
3. Construction — the process of building a new infrastructure or facility, such as road, bridge, flood control or building.
4. Improvement — the betterment of existing infrastructure through upgrading, widening, or strengthening (e.g., retrofitting) in order to increase its original design capacity or performance.
5. Rehabilitation — a grouping of types of works which restore structural capacity and performance, and/or enhance safety. These types of works are applicable to infrastructure in poor or bad condition. In the case of pavement, this shall not extend to the subgrade. In the case of flood control, this includes dredging.
6. Retrofitting — a grouping of types of work associated with strengthening of existing structures to comply with the latest standards, usually with the aid of new technology or introduction of new features to the old design.
7. Maintenance — an activity undertaken to keep or restore an asset to good working condition.
8. Qualifier — an additional specific requirement on Major or Similar Categories of Work, to be required from the bidders at the bidding stage, to show that they have the necessary expertise and experience to undertake the project (e.g., an extraordinarily large embankment volume, soft ground treatment, long tunnel using tunnel boring machine (TBM), or bridge retrofitting using special jacking technology).
9. Contract — is an enforceable agreement between two or more participants or persons.
B. LIST OF MAJOR CATEGORIES OF WORKS AND SIMILAR CATEGORIES OF WORKS AND VERIFICATION OF QUALIFIERS
1. In the procurement of infrastructure contracts, the DPWH Procuring Entities and Implementing Units concerned shall use the Major Categories of Works and Similar Categories of Works listed in ANNEX A. In determining the work experience of a contractor for a particular contract which involves a given set of Major Categories of Works (columns 1 and 2), the Procuring Entity shall consider the contractor's relevant work experience, not only for the Major Category of Work itself, but also for the corresponding Similar Categories of Works (columns 3 and 4) listed in ANNEX A.
2. Similar Categories of Work with asterisk marks (*) in column 4 of ANNEX A refer to those used in the DPWH Civil Works Application (CWA) prior to the adoption of the Department Order (DO) No. 14, series 2017.
3. Examples of Qualifiers, as defined in item A-8 above, are given in ANNEX B.
4. The verification or validation of compliance with the Qualifiers shall be undertaken during the post-qualification of the bidder with the Lowest Calculated Bid, and not during the Eligibility Check.
C. CRITERIA FOR DETERMINATION OF MAJOR/SIMILAR CATEGORIES OF WORKS AND ELIGIBILITY REQUIREMENTS FOR WORK EXPERIENCE
1. For a contract involving a single category of works (i.e., type of infrastructure and kind of work) — e.g., road construction, or bridge retrofitting, or flood control rehabilitation — the following criteria shall be adopted:
a. The Major Category of Works is the single category itself.
b. To be eligible to bid for the contract, a bidder/contractor must have done a Single Largest Completed Contract (SLCC) containing a category of work which is the same as or similar to the Major Category of Works, and whose total SLCC cost is at least 50% of the Approved Budget for the Contract (ABC) to be bid.
2. For a contract to be bid involving multiple categories of works — e.g., combination of road construction, bridge retrofitting, and flood control rehabilitation — the following criteria shall be adopted:
a. Each category of works whose cost is at least 40% of the ABC shall be considered a Major Category of Works. In case no category of works is at least 40% of the ABC, the category with the highest percentage cost of the ABC shall be considered as the only Major Category of Work. If there are more than one category with the highest percentage cost less than 40% of ABC (say both 39% of the ABC), both categories shall be considered "Major Categories of Work."
b. To be eligible to bid for the contract, a bidder/contractor must have done a Single Largest Completed Contract (SLCC) complying with the following work experience requirements:
(1) The contractor must have undertaken a SLCC similar to the contract to be bid. To be so considered similar, the SLCC must contain categories of work which are the same as or similar to the Major Categories of Works of the contract to be bid.
(2) The total cost of the SLCC must be at least 50% of the total ABC to be bid.
ANNEX C shows an illustrative example in the determination of Major Categories of Works and in checking the work experience eligibility for a contract involving multiple categories of works.
D. PROCEDURE IN THE DETERMINATION OF MAJOR AND SIMILAR WORK CATEGORIES AND IN THE ELIGIBILITY CHECK USING THE CIVIL WORKS APPLICATION
1. Section 30.1 of the 2016 Implementing Rules and Regulations of the Republic Act 9184 states, among others, "The BAC shall open the first envelopes (technical envelopes) in public to determine each bidder's compliance with the documents required to be submitted for eligibility and for the technical requirements as prescribed in the said IRR." After opening the first envelope, the BAC shall simultaneously conduct the electronic eligibility check and preliminary examination of the Technical components of the bids.
2. For electronic eligibility check of a specific contract to be bid, the BAC with the assistance of the Technical Working Group, through the CWA, shall encode the Contract Profile (Form DPWH-INFRA 08) submitted by the Implementing Office — i.e., Major Category(ies) of Works, unit of measure, dimensions, and cost estimate per category of the ABC. The estimated cost of each Major Category of Work should include the cost of the minor items related to or proportionately distributed to it. The proportionate distribution shall be based on the weighted percentage of the major items. The corresponding Similar Category(ies) of Work for each Major Category of Work shall be automatically selected by the CWA based on ANNEX A.
3. In case a bidder is already enrolled in the CWA and submits, together with its technical bid, the updated documents — i.e., Class "A" and Class "B" documents, the BAC shall immediately forward copies of Class "A" and Class "B" documents (stamped Certified True Copy by the BAC Secretariat of the procuring entity), for updating to the Procurement Service to encode into the CWA the appropriate data and information — e.g., PCAB License, SLCC, Net Financial Contracting Capacity (NFCC), etc. — from the submitted Eligibility Documents. Without interrupting the bidding process, the BAC shall manually evaluate bidder's eligibility as to their submitted Class "A" and Class "B" Documents. If found passed in the preliminary examination and eligibility evaluation, the BAC shall proceed with the opening of the bidder's 2nd Envelope. Consequently, the BAC shall conduct the electronic eligibility processing of the previously enrolled bidders in the CWA. The BAC shall also declare that upon approval of the application of registration and unlocking of subject contract ID in the CWA, the bidder will be subjected to electronic eligibility processing. Result of latest electronic eligibility processing shall prevail over the manual eligibility evaluation.
4. In case a bidder is not previously enrolled in the CWA and submits its Eligibility Documents — i.e., Class "A" and Class "B" Documents — as part of its bid, the BAC shall do the same process indicated in the above Item 3.
5. In both cases (Items D-3 and D-4), the CWA program will then electronically process and compare (a) the bidder's work experience eligibility data in the CWA — i.e., the value of the bidder's SLCC for Major and Similar Categories of Works — against (b) the eligibility requirements for the contract derived from the Contract Profile earlier entered into the CWA — using the criteria in Item C above. The computer program will automatically determine if the bidder meets the work experience eligibility requirements.
6. The CWA will show the validity date of the legal documents and its corresponding registration/certificate numbers. As to financial aspects, the CWA will automatically compute the Net Financial Contracting Capacity of a bidder.
7. The Lowest Calculated Bid shall undergo post-qualification in order to determine whether the bidder concerned complies with and is responsive to all the requirements and conditions as specified in the Bidding Documents. During the post-qualification, the BAC shall verify, validate, and ascertain all statements made and documents submitted by the bidder with the Lowest Calculated Bid, using non-discretionary criteria, as stated in the Bidding Documents.
8. The category of work used during the Eligibility Check shall be the same category when the project is completed, accepted and included in the database under the contractor's list of completed projects. This category shall be reflected in the Contractor's Information (CI) which is attached to the Contractor's Registration Certificate (CRC).
E. DETERMINATION OF A QUALIFIER
As defined in item C.2.a above, each category of works whose cost is at least 40% of the ABC shall be considered a Major Category of Works. However, for Categories of Work costing less than 40% but not less than 30% of the ABC, the Procuring Entity shall specify in the Bidding document, specifically in the Eligibility Data Sheet (EDS), a Qualifier for the contract to be bid.
The Procuring Entity shall also specify a Qualifier for the Contract to be bid, if the Contract to be bid contains items requiring Special Technology or Large Volume of Works.
F. MODIFICATION OF MAJOR AND SIMILAR CATEGORIES OF WORK
The Committee on the Evaluation on Major Work Categories in the Civil Works Application, under D.O. 120 series of 2015, is hereby authorized to modify any item in the Table of Major Work and Similar Categories of Work in Annex A of this Department Order, as well as other related Annexes therein, as necessary to suit changes in construction industry practices.
G. EFFECTIVITY
This Order supersedes Department Order Nos. 139 and 173, series of 2016, and Department Order No. 14, series 2017 and shall take effect fifteen (15) calendar days after publication thereof in a newspaper of general circulation.
(SGD.) MARK A. VILLAR
Secretary
ANNEX A
Major and Similar Categories of Works
|
Category of |
Work Description |
Similar Category |
Similar Category of Work Description |
|
BCB |
Bridges: Construction — Bailey |
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
|
BRTSDP |
Bridges: Retrofitting — Steel (Superstructure) — with Driven Piles |
||
|
BRHSCP |
Bridges: Rehabilitation — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRTSCP |
Bridges: Retrofitting — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
||
|
BRTCDP |
Bridges: Retrofitting — Concrete (Superstructure) — with Driven Piles |
||
|
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BRTCCP |
Bridges: Retrofitting — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
||
|
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
||
|
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
|
BRTSDP |
Bridges: Retrofitting — Steel (Superstructure) — with Driven Piles |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
BRHSCP |
Bridges: Rehabilitation — Steel (Superstructure) — with Cast-in-Place Piles |
|
BRTSCP |
Bridges: Retrofitting — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
|
BRTCDP |
Bridges: Retrofitting — Concrete (Superstructure) — with Driven Piles |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
|
BRTCCP |
Bridges: Retrofitting — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
|
BRTSDP |
Bridges: Retrofitting — Steel (Superstructure) — with Driven Piles |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BRHSCP |
Bridges: Rehabilitation — Steel (Superstructure) — with Cast-in-Place Piles |
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
|
BRTSCP |
Bridges: Retrofitting — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
|
BRTCDP |
Bridges: Retrofitting — Concrete (Superstructure) — with Driven Piles |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
|
BRTCCP |
Bridges: Retrofitting — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRTSDP |
Bridges: Retrofitting — Steel (Superstructure) — with Driven Piles |
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
|
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRTSCP |
Bridges: Retrofitting — Steel (Superstructure) — with Cast-in-Place Piles |
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
|
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRTCDP |
Bridges: Retrofitting — Concrete (Superstructure) — with Driven Piles |
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
|
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRTCCP |
Bridges: Retrofitting — Concrete (Superstructure) — with Cast-in-Place Piles |
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
|
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCCWOP |
Bridges: Construction — Concrete (Superstructure) — without Piles |
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
|
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
||
|
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BRTCDP |
Bridges: Retrofitting — Concrete (Superstructure) — with Driven Piles |
||
|
BRTCCP |
Bridges: Retrofitting — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCSWOP |
Bridges: Construction — Steel (Superstructure) — without Piles |
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
|
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
||
|
BRHSCP |
Bridges: Rehabilitation — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRTSDP |
Bridges: Retrofitting — Steel (Superstructure) — with Driven Piles |
||
|
BRTSCP |
Bridges: Retrofitting — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BRHCWOP |
Bridges: Rehabilitation — Concrete (Superstructure) — without Piles |
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
|
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BRTCDP |
Bridges: Retrofitting — Concrete (Superstructure) — with Driven Piles |
||
|
BRTCCP |
Bridges: Retrofitting — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRHSWOP |
Bridges: Rehabilitation — Steel (Superstructure) — without Piles |
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
|
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRTSDP |
Bridges: Retrofitting — Steel (Superstructure) — with Driven Piles |
||
|
BRTSCP |
Bridges: Retrofitting — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRTCWOP |
Bridges: Retrofitting — Concrete (Superstructure) — without Piles |
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
|
|
|
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
|
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
||
|
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
BRTSWOP |
Bridges: Retrofitting — Steel (Superstructure) — without Piles |
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
|
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
||
|
BRHSCP |
Bridges: Rehabilitation — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCP |
Bridges: Construction — with Bored Pile * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
RCA |
Roads: Construction — Asphalt |
RRA |
Roads: Rehabilitation — Asphalt |
|
RCG |
Roads: Construction — Gravel |
RCA |
Roads: Construction — Asphalt |
|
RCP |
Roads: Construction — PCCP |
||
|
RRA |
Roads: Rehabilitation — Asphalt |
||
|
RRP |
Roads: Rehabilitation — PCCP |
||
|
RRG |
Roads: Rehabilitation — Gravel * |
||
|
RCP |
Roads: Construction — PCCP |
RRP |
Roads: Rehabilitation — PCCP |
|
RCTP |
Roads: Construction — Tunnel — PCCP |
||
|
RRA |
Roads: Rehabilitation — Asphalt |
RCA |
Roads: Construction — Asphalt |
|
RRP |
Roads: Rehabilitation — PCCP |
RCP |
Roads: Construction — PCCP |
|
RCTP |
Roads: Construction — Tunnel — PCCP |
||
|
RCTP |
Roads: Construction — Tunnel — PCCP |
|
None |
|
RCSPNS |
Roads: Construction — Slope Protection using non-structural measures (e.g., vetiver, coconet, other vegetation) |
FCSPNS |
Flood Control: Construction — Slope Protection using non-structural measures (e.g., vetiver, coconet, other vegetation) |
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
RCSPS |
Roads: Construction — Slope Protection using Structural Measures (e.g., Revetment, Retaining structures, Wirenet) |
FCSPS |
Flood Control: Construction — Slope Protection using Structural Measures (e.g., Revetment, Retaining structures, Wirenet) |
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
RM |
Roads: Maintenance |
RCA |
Roads: Construction — Asphalt |
|
RCP |
Roads: Construction — PCCP |
||
|
RRA |
Roads: Rehabilitation — Asphalt |
||
|
RRP |
Roads: Rehabilitation — PCCP |
||
|
MRB |
Maintenance of Roads and Bridges * |
||
|
RCG |
Roads: New Construction — Gravel * |
||
|
RRG |
Roads: Rehabilitation — Gravel * |
||
|
BM |
Bridges: Maintenance |
BCB |
Bridges: Construction — Bailey |
|
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
||
|
BCCWOP |
Bridges: Construction — Concrete (Superstructure) — without Piles |
||
|
BCSCP |
Bridges: Construction — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BCSDP |
Bridges: Construction — Steel (Superstructure) — with Driven Piles |
||
|
BCSWOP |
Bridges: Construction — Steel (Superstructure) — without Piles |
||
|
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
||
|
BRHCWOP |
Bridges: Rehabilitation — Concrete (Superstructure) — without Piles |
||
|
BRHSCP |
Bridges: Rehabilitation — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRHSDP |
Bridges: Rehabilitation — Steel (Superstructure) — with Driven Piles |
||
|
BRHSWOP |
Bridges: Rehabilitation — Steel (Superstructure) — without Piles |
||
|
BRTCCP |
Bridges: Retrofitting — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
BRTCDP |
Bridges: Retrofitting — Concrete (Superstructure) — with Driven Piles |
||
|
BRTCWOP |
Bridges: Retrofitting — Concrete (Superstructure) — without Piles |
||
|
BRTSCP |
Bridges: Retrofitting — Steel (Superstructure) — with Cast-in-Place Piles |
||
|
BRTSDP |
Bridges: Retrofitting — Steel (Superstructure) — with Driven Piles |
||
|
BRTSWOP |
Bridges: Retrofitting — Steel (Superstructure) — without Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BRC |
Bridges: Rehabilitation — Concrete * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
BRP |
Bridges: Rehabilitation — with Bored Piles * |
||
|
BCB |
Bridges: Construction — Bailey * |
||
|
BRB |
Bridges: Rehabilitation — Bailey * |
||
|
BCS |
Bridges: Construction — Steel * |
||
|
BRS |
Bridges: Rehabilitation — Steel * |
||
|
BRR |
Bridges: Rehabilitation — Retrofitting * |
||
|
MRB |
Maintenance of Roads and Bridges * |
||
|
TEMS |
Traffic Engineering and Management System (including Road Safety Devices) |
TEG |
Traffic Engineering: Guardrails * |
|
TEP |
Traffic Engineering: Pavement Markings * |
||
|
TEP-P |
Traffic Engineering: Profiled Markings * |
||
|
TEP-S |
Traffic Engineering: Pavement Studs * |
||
|
TES |
Traffic Engineering: Signalization * |
||
|
TEA |
Traffic Engineering: Signage * |
||
|
BICWPLCDP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Driven Piles (1 to 5 Storeys) |
BICWPHCDP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Driven Piles |
|
BIL |
Buildings: Industrial Plant-Low rise * |
||
|
BIM |
Buildings: Industrial Plant-Medium rise * |
||
|
BIH |
Buildings: Industrial Plant-High rise * |
||
|
BICWPLCCP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Cast-in-Place Piles (1 to 5 Storeys) |
BICWPHCCP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Cast-in-Place Piles |
|
BIL |
Buildings: Industrial Plant — Low rise * |
||
|
BIM |
Buildings: Industrial Plant — Medium rise * |
||
|
BIH |
Buildings: Industrial Plant — High rise * |
||
|
BICWOPLC |
Buildings: Construction — without Piles — Low Rise — Concrete (Frame) (1 to 5 Storeys) |
BICWPHCCP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Cast-in-Place Piles |
|
BICWPLCCP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Cast-in-Place Piles |
||
|
BICWPHCDP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Driven Piles |
||
|
BICWPLCDP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Driven Piles |
||
|
BICWOPHC |
Buildings: Construction — without Piles — High Rise — Concrete (Frame) |
||
|
BIL |
Buildings: Industrial Plant — Low Rise * |
||
|
BIH |
Buildings: Industrial Plant — High Rise * |
||
|
BIM |
Buildings: Industrial Plant — Medium Rise * |
||
|
BICWPHCDP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Driven Piles (6 and above Storeys) |
BIH |
Buildings: Industrial Plant — High Rise * |
|
BICWPHCCP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Cast-in-Place Piles (6 and above Storeys) |
BIH |
Buildings: Industrial Plant — High Rise * |
|
BICWOPHC |
Buildings: Construction — without Piles — High Rise — Concrete (Frame) (6 and above Storeys) |
BICWPHCCP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Cast-in-Place Piles |
|
BICWPHCDP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Driven Piles |
||
|
BIH |
Buildings: Industrial Plant — High Rise * |
||
|
BICWPLSDP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Steel (Frame) — Driven Piles (1 to 5 Storeys) |
BICWPHSDP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Driven Piles |
|
BIL |
Buildings: Industrial Plant — Low rise * |
||
|
BIM |
Buildings: Industrial Plant — Medium rise * |
||
|
BIH |
Buildings: Industrial Plant — High rise * |
||
|
BICWPLSCP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Cast-in-Place Piles (1 to 5 Storeys) |
BICWPHSCP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Cast-in-Place Piles |
|
BIL |
Buildings: Industrial Plant — Low rise * |
||
|
BIM |
Buildings: Industrial Plant — Medium rise * |
||
|
BIH |
Buildings: Industrial Plant — High rise * |
||
|
BICWOPLS |
Buildings: Construction — without Piles — Low Rise — Steel (Frame) (1 to 5 Storeys) |
BICWPHSCP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Cast-in-Place Piles |
|
BICWPLSCP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Cast-in-Place Piles |
||
|
BICWPHSDP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Driven Piles |
||
|
BICWPLSDP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Driven Piles |
||
|
BICWOPHS |
Buildings: Construction — without Piles — High Rise — Steel (Frame) |
||
|
BIH |
Buildings: Industrial Plant — High rise * |
||
|
BIL |
Buildings: Industrial Plant — Low rise * |
||
|
BIM |
Buildings: Industrial Plant — Medium rise * |
||
|
BICWPHSDP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Driven Piles (6 and above Storeys) |
BIH |
Buildings: Industrial Plant — High rise * |
|
BICWPHSCP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Cast-in-Place Piles (6 and above Storeys) |
BIH |
Buildings: Industrial Plant — High rise * |
|
BICWOPHS |
Buildings: Construction — without Piles — High Rise — Steel (Frame) (6 and above Storeys) |
BICWPHSCP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Cast-in-Place Piles |
|
BICWPHSDP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Driven Piles |
||
|
BIH |
Buildings: Industrial Plant — High rise * |
||
|
BIR |
Buildings: Repair |
BIRTH |
Buildings: Retrofitting — High Rise |
|
BIRTL |
Buildings: Retrofitting — Low Rise |
||
|
BICWPLCDP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Driven Piles |
||
|
BICWPHCDP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Driven Piles |
||
|
BICWPLCCP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Cast-in-Place Piles |
||
|
BICWPHCCP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Cast-in-Place Piles |
||
|
BICWPLSDP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Driven Piles |
||
|
BICWPHSDP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Driven Piles |
||
|
BICWPLSCP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Cast-in-Place Piles |
||
|
BICWPHSCP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Cast-in-Place Piles |
||
|
BICWOPLS |
Buildings: Construction — without Piles — Low Rise — Steel (Frame) |
||
|
BICWOPHS |
Buildings: Construction — without Piles — High Rise — Steel (Frame) |
||
|
BICWOPLC |
Buildings: Construction — without Piles — Low Rise — Concrete (Frame) |
||
|
BICWOPHC |
Buildings: Construction — without Piles — High Rise — Concrete (Frame) |
||
|
BIL |
Buildings: Industrial Plant — Low Rise * |
||
|
BIM |
Buildings: Industrial Plant — Medium Rise * |
||
|
BIH |
Buildings: Industrial Plant — High Rise * |
||
|
MBG |
Maintenance of Buildings * |
||
|
BIRTL |
Buildings: Retrofitting — Low Rise |
BICWPLCDP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Driven Piles |
|
BICWPHCDP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Driven Piles |
||
|
BICWPLCCP |
Buildings: Construction — with Piles — Low Rise — Concrete (Frame) — Cast-in-Place Piles |
||
|
BICWPHCCP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Cast-in-Place Piles |
||
|
BICWPLSDP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Driven Piles |
||
|
BICWPHSDP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Driven Piles |
||
|
BICWPLSCP |
Buildings: Construction — with Piles — Low Rise — Steel (Frame) — Cast-in-Place Piles |
||
|
BICWPHSCP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Cast-in-Place Piles |
||
|
BICWOPLS |
Buildings: Construction — without Piles — Low Rise — Steel (Frame) |
||
|
BICWOPHS |
Buildings: Construction — without Piles — High Rise — Steel (Frame) |
||
|
BICWOPLC |
Buildings: Construction — without Piles — Low Rise — Concrete (Frame) |
||
|
BICWOPHC |
Buildings: Construction — without Piles — High Rise — Concrete (Frame) |
||
|
BIL |
Buildings: Industrial Plant — Low Rise * |
||
|
BIH |
Buildings: Industrial Plant — High Rise * |
||
|
BIM |
Buildings: Industrial Plant — Medium Rise * |
||
|
BIRTH |
Buildings: Retrofitting — High Rise |
BICWPHCDP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Driven Piles |
|
BICWPHCCP |
Buildings: Construction — with Piles — High Rise — Concrete (Frame) — Cast-in-Place Piles |
||
|
BICWPHSDP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Driven Piles |
||
|
BICWPHSCP |
Buildings: Construction — with Piles — High Rise — Steel (Frame) — Cast-in-Place Piles |
||
|
BICWOPHS |
Buildings: Construction — without Piles — High Rise — Steel (Frame) |
||
|
BICWOPHC |
Buildings: Construction — without Piles — High Rise — Concrete (Frame) |
||
|
BIH |
Buildings: Industrial Plant — High Rise * |
||
|
FCG |
Flood Control: Construction — Gates |
FCP |
Flood Control: Construction — Pumping Station |
|
FCDG |
Flood Control: Construction — Dam with Gates |
||
|
FHP |
Flood Control: Hydraulics — Pumping Station * |
||
|
FCDG |
Flood Control: Construction — Dam with Gates |
FCP |
Flood Control: Construction — Pumping Station |
|
FHP |
Flood Control: Hydraulics — Pumping Station * |
||
|
FCRB |
Flood Control: Construction — Retarding Basin |
FCD |
Flood Control: Construction — Dams |
|
FCDKL |
Flood Control: Construction — Dike/Levees |
||
|
FCCE |
Flood Control: Construction — Channel Excavation |
||
|
FHD |
Flood Control: Hydraulics — Dams * |
||
|
FCSP |
Flood Control: Construction — Shore Protection (Seawall, Breakwater) |
PCCWDP |
Ports/Harbors: Construction — Causeway/Wharf — with Driven Piles |
|
PCCWCP |
Ports/Harbors: Construction — Causeway/Wharf — with Cast-in-Place Piles |
||
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
PHW |
Ports/Harbors: Wharf * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
FCSPNS |
Flood Control: Construction — Slope Protection using non-structural measures (e.g., vetiver, coconet, other vegetation) |
RCSPNS |
Roads: Construction — Slope Protection using non-structural measures (e.g., vetiver, coconet, other vegetation) |
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
FCSPS |
Flood Control: Construction — Slope Protection using Structural Measures (e.g., Revetment, Retaining structures, Wirenet) |
RCSPS |
Roads: Construction — Slope Protection using Structural Measures (e.g., Revetment, Retaining structures, Wirenet) |
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
FCD |
Flood Control: Construction — Dams |
FCRB |
Flood Control: Construction — Retarding Basin |
|
FCDKL |
Flood Control: Construction — Dikes/Levees |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
FCDG |
Flood Control: Construction — Dam with Gates |
||
|
FMDRE |
Flood Control: Maintenance — Dredging, Desilting, River Rechanneling/Excavation Works |
FCRB |
Flood Control: Construction — Retarding Basin |
|
FCCE |
Flood Control: Construction — Channel Excavation |
||
|
HD |
Harbors: Dredging |
||
|
MFC |
Maintenance: Flood Control * |
||
|
FHG |
Flood Control: Hydraulics — Dredging * |
||
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
FCCE |
Flood Control: Construction — Channel Excavation |
FMDRE |
Flood Control: Maintenance — Dredging, Desilting, River Rechanneling/Excavation Works |
|
HD |
Harbors: Dredging |
||
|
FHG |
Flood Control: Hydraulics — Dredging * |
||
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
HD |
Harbors: Dredging |
FMDRE |
Flood Control: Maintenance — Dredging, Desilting, River Rechanneling/Excavation Works |
|
FCCE |
Flood Control: Construction — Channel Excavation |
||
|
FHG |
Flood Control: Hydraulics — Dredging * |
||
|
FCN ** |
Flood Control: Construction — Drainage (Closed and open) Conduits |
RCP |
Roads: Construction — PCCP |
|
RCA |
Roads: Construction — Asphalt |
||
|
RRP |
Roads: Rehabilitation — PCCP |
||
|
RRA |
Roads: Rehabilitation — Asphalt |
||
|
WSL2&3 |
Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point) |
||
|
FHN |
Flood Control: Hydraulics — Drainage * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
FCP |
Flood Control: Construction — Pumping Station |
FHP |
Flood Control: Hydraulics — Pumping Station * |
|
FCG |
Flood Control: Construction — Gates |
||
|
FCDG |
Flood Control: Construction — Dam with gates |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
FCDKL |
Flood Control: Construction — Dikes/Levees |
FCD |
Flood Control: Construction — Dams |
|
FCRB |
Flood Control: Construction — Retarding Basin |
||
|
FCSP |
Flood Control: Construction — Shore Protection (Seawall, Breakwater) |
||
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
PHW |
Ports/Harbors: Wharf * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
FCDG |
Flood Control: Construction — Dam with Gates |
||
|
FCBPS |
Flood Control: Construction — Bank Protection Structure |
FCSP |
Flood Control: Construction — Shore Protection (Seawall, Breakwater) |
|
FHR |
Flood Control: Hydraulics — River Control * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
PHW |
Ports/Harbors: Wharf * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
WSL1 |
Water Supply (Level 1): Construction (Shallow Wells/Rainwater Collectors) |
WSL2&3 |
Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point) |
|
|
|
FHW |
Flood Control: Hydraulics — Water Supply * |
|
WSL2&3 |
Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point) |
FCN |
Flood Control: Construction — Drainage (Closed and open) |
|
FHW |
Flood Control: Hydraulics — Water Supply * |
||
|
PCCWDP |
Ports/Harbors: Construction — Causeway/Wharf — with Driven Piles |
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
PHW |
Ports/Harbors: Wharf * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
PCCWCP |
Ports/Harbors: Construction — Causeway/Wharf — with Cast-in-Place Piles |
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
|
BCC |
Bridges: Construction — Concrete * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
PHW |
Ports/Harbors: Wharf * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
PMCWDP |
Ports/Harbors: Maintenance — Causeway/Wharf — with Driven Piles |
BCCDP |
Bridges: Construction — Concrete (Superstructure) — with Driven Piles |
|
BRHCDP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Driven Piles |
||
|
PCCWDP |
Ports/Harbors: Construction — Causeway/Wharf — with Driven Piles |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
PHW |
Ports/Harbors: Wharf * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
PMCWCP |
Ports/Harbors: Maintenance — Causeway/Wharf — with Cast-in-Place Piles |
BCCCP |
Bridges: Construction — Concrete (Superstructure) — with Cast-in-Place Piles |
|
BRHCCP |
Bridges: Rehabilitation — Concrete (Superstructure) — with Cast-in-Place Piles |
||
|
PCCWCP |
Ports/Harbors: Construction — Causeway/Wharf — with Cast-in-Place Piles |
||
|
BCC |
Bridges: Construction — Concrete * |
||
|
BCP |
Bridges: Construction — with Bored Piles * |
||
|
PHC |
Ports/Harbors: Causeway * |
||
|
PHW |
Ports/Harbors: Wharf * |
||
|
FHD |
Flood Control: Hydraulics — Dam * |
|
* Old Categories of Works which are retained in the CWA but shall not to be used as Major Categories of Works of the Contract to be Bid in the Preparation of Contract Profile (NR002). The major categories of works shall be selected from columns 1 and 2 (Category of Work Code and Work Description, respectively) |
|
** Drainage facilities along road that serves to remove water from the road and its immediate surroundings only shall not be treated as separate flood control category (FCN) |
In applying the Major and Similar Categories of Work given in Annex A, the following types of infrastructure are considered similar to the basic types of each other.
|
Basic Types |
Similar Types |
|
Road |
Highway, tollway, expressway, airport runway, taxiway |
|
Bridge |
Flyover, viaduct, elevated railway, interchange, piers and ports |
|
Building |
School, hospital, housing, commercial building, industrial building, warehouse |
|
Tunnel |
Subway, mining tunnel, subsurface aqueduct |
|
Water Supply |
Irrigation dam, power dam |
ANNEX B
Examples of Qualifier
Note: The contents of this ANNEX B are illustrative examples of Qualifiers and not necessarily to be adopted for specific projects. Actual Qualifiers to be used shall be recommended on a project-to-project basis by the concerned implementing office, depending on the requirements of the particular projects under consideration.
|
CATEGORY |
EXAMPLE OF QUALIFIER |
|
Bridges: Construction — Steel — with Driven Piles |
Must include major structural steel components of both substructure and superstructure (e.g., piles, girders, truss members) comprising at least a total of say 20% of project cost. |
|
Bridges: Construction — Steel — with Cast-in-Place Piles |
Must include major structural concrete components of both substructure and superstructure (e.g., piles, girders, truss members) comprising at least 20% of the item of work of the project. |
|
Bridges: Construction — Concrete — with Driven Piles |
Must include major structural components of both substructure and superstructure (e.g., piles, girders, truss members) comprising at least 20% of the item of work of the project. |
|
Bridges: Construction — Concrete — with Cast-in-Place Piles |
Must include major structural components of both substructure and superstructure (e.g., piles, girders, truss members) comprising at least 20% of the item of work of the project |
|
Roads: Construction — PCCP |
Must have completed reconstruction and reblocking including base course covering 50% of the item of work of the project. May include Airport Runways, taxiways and Aprons. |
|
Tunnel: Construction |
Must have completed underground/subsurface facilities using Tunnel Boring Machine: Construction (Subway, Mining, Water Irrigation Aqueduct). |
|
Roads: Construction — Slope Protection using Structural Measures (e.g., Revetment, Retaining structures, Wirenet) |
Bidder must have completed: 1. At least one (1) contract that is similar to the following works among others: a. Stone Masonry b. Retaining Wall c. Grouted Riprap d. Geosynthetic 2. Similar slope protection works with at least 50% of the item of work of the project. |
|
Traffic Engineering and Management System |
Must have completed channelization, signalization, traffic signs, road furniture, barricades, highway/road lighting |
|
Relocation of Utilities (specific scope of works) |
Included in this new category are the installation, removal/relocation of electrical posts, water utilities, transmission lines, telephone utilities, communication towers, etc. |
|
Flood Control: Construction — Gates |
Specify the type of gate (e.g., sluice gate, navigational gate, tidal gate and weir, flap gate) |
|
Flood Control: Construction — Retarding Basin |
Bidder must have completed at least one (1) similar contract on earthmoving (excavation and embankment) involving at least 50% of the item of work of the project. |
|
Flood Control: Construction — Shore Protection (Seawall, Breakwater) |
Bidder must have completed: 1. At least one (1) contract that is similar to the following ports and harbors projects to be bid, and; 2. Similar shore protection works with at least 50% of the item of work of the projects a. Coastal Dike b. Causeway c. Wharf |
|
Flood Control: Construction — Slope Protection using non-structural measures (e.g., vetiver, coconet, other vegetation) |
Bidder must have completed: 1. At least one (1) contract that is similar to the following measures among others: a. Coconet (Sodding) b. Vetiver Grass 2. Similar slope protection works with at least 50% of the item of work of the project. |
|
Flood Control: Construction — Slope Protection using Structural Measures (e.g., Revetment, Retaining structures, Wirenet) |
Bidder must have completed: 1. At least one (1) contract that is similar to the following works among others: a. Concrete Revetment b. Gabion Revetment c. Wire net d. Stone Masonry e. Retaining Wall/Floodwall f. Grouted Riprap g. Geosynthetic 2. Similar slope protection works with at least 50% of item of work of the project. |
|
Flood Control: Construction — Dams |
Bidder must have completed: 1. At least one (1) contract that is similar to the following sediment control (sabo) dam and irrigation projects to be bid, and; 2. Similar sediment control (sabo) dam and irrigation works with at least 50% of the item of work of the project. a. Sediment Control (Sabo) Dam b. Irrigation Dam c. Small Water Impounding Management (SWIM) Dam (Height <15m) d. Water Supply/Flood Control Dams (Height >15m) e. Specify requirements for height and volume for special projects e.g., Concrete Dam with at least 50% of the required volume of concrete. |
|
Flood Control: Maintenance — Dredging, Desilting, River Rechanneling/Excavation Works |
Bidder must have an experience on: 1. Completed at least one (1) contract that has similar channel excavation/dredging projects to be bid, and; 2. Similar channel excavation/dredging works with at least 50% of items of work of the project. |
|
Flood Control: Construction — Channel Excavation |
Must have completed similar channel excavation/dredging works with at least 50% of volume of work of the project. |
|
Harbors: Dredging |
Must have completed similar channel excavation/dredging works with at least 50% of volume/quantity of work of the project. |
|
Flood Control: Construction — Drainage (Closed and open) |
Must have completed road construction with drainage component or water supply (Levels 2 & 3): construction with water pipe or sewer pipes |
|
Flood Control: Construction — Pumping Station |
Must have experience in electromechanical works |
|
Flood Control: Construction — Dikes/Levees |
Include the type of material (concrete, gabion, etc.) |
|
Water Supply (Level 1): Construction |
Bidder must have an experience on similar flood control projects and water supply projects with 50% of items of work of the project, e.g.: a. Deepwell b. Reservoir c. Water Works System d. Water Source Development e. Water Treatment System f. Water tank |
|
Water Supply (Level 2 & 3): Construction |
Must have completed Pressurized Pipes/Closed Conduits |
|
Ports/Harbors: Construction — Causeway/Wharf — with Driven Piles |
Bidder must have similar experience on bridge construction/river control and shore protection projects with 50% of items of work of the project, e.g.: a. Causeway b. Wharfs c. Apron d. RORO landings |
ANNEX C
Example in Determining Major Categories of Works and Work Experience Eligibility for Contract with Multiple Categories of Works
In the case of a contract consisting of multiple categories of works, the following hypothetical example illustrates the process in determining the Major Categories of Works of that contract and in checking the work experience eligibility of a bidder for the contract, using the rules prescribed in this Department Order (DO).
Given:
The contract to be bid consists of three categories of works with the following characteristics:
Contract to be Bid
|
Category |
Approved Budget |
% of |
Classification |
|
FCCE |
P40M |
47.06% |
Major |
|
FCSPS |
P42M |
49.41% |
Major |
|
TEMS |
P3M |
3.53% |
|
|
|
P85M |
|
|
In accordance with DO _________, for the contract to be bid, FCCE and FCSPS are considered the Major Categories of Works since their respective costs are more than 40% of the ABC.
Problem:
Determine if the following bidders' Single Largest Completed Contracts (SLCC's) meet the eligibility requirements for work experience for the contract to be bid.
Given:
|
Bidder |
Total Amount |
Category/ies of Works |
Amount of each |
|
A |
65M |
FCCE |
10M |
|
FCSPS |
15M |
||
|
BCSWOP |
60M |
||
|
B |
45M |
FHR |
45M |
|
C |
100M |
FCSPS |
45M |
|
TEMS |
55M |
||
|
D |
30M |
FCCE |
10M |
|
FCSPS |
20M |
Analysis:
Bidder A:
The SLCC of bidder A is similar to the contract to be bid because it contains categories of works (FCCE and FCSPS) same as the Major Categories of Works of the contract to be bid. Also, the total cost of the SLCC, which is P65M, is greater than 50% of the ABC or P42.5M. Hence, the SLCC of bidder A meets the eligibility requirements for work experience for the contract to be bid.
Bidder B:
The SLCC of bidder B is similar to the contract to be bid because its single category (FHR) is similar to both Major Categories of Works of the contract to be bid which are FCCE and FCSPS. Also, the total cost of the SLCC, which is P45M, is greater than 50% of the ABC or P42.5M. Hence, the SLCC of bidder B meets the eligibility requirements for work experience for the contract to be bid.
Bidder C:
The SLCC of bidder C contains a category of work (FCSPS) which is the same as one of the Major Categories of Works (FCSPS), however it does not contain the category of work which is the same as or similar to the other Major Category of Works (FCCE). Hence, the SLCC of Bidder C is not similar to the contract to be bid. Consequently, the SLCC of bidder C does not meet the eligibility requirements for work experience for the contract to be bid.
Bidder D:
The SLCC of bidder D is similar to the contract to be bid because it contains categories of works (FCCE and FCSPS) which are the same as the Major Categories of Works of the contract to be bid. However, the total cost of the SLCC, which is P30M, is less than 50% of the ABC or P42.5M. Hence, the SLCC of bidder D does not meet the eligibility requirements for work experience for the contract to be bid.
Revised Guidelines for the Determination of Major and Similar Categories of Work and Eligibility Requirements for Work Experience in the Procurement of Infrastructure Contracts, DPWH Department Order No. 117-17, Sep 14, 2017 (Philippines)
Revised Guidelines for the Determination of Major and Similar Categories of Work and Eligibility Requirements for Work Experience in the Procurement of Infrastructure Contracts, DPWH Department Order No. 117-17 (Phil. 2017)
Explore other laws in the Other Rules and Procedures category.
View All Other Rules and ProceduresAsk our AI assistant to explain provisions, implications, or related laws.
Ask AI About This Law