The Department of Agrarian Reform (DAR) issued Memorandum Circular No. 04-14 on July 30, 2014, outlining guidelines for managing landholdings in the CARPER Land Acquisition and Distribution (LAD) Database. The circular emphasizes the need to review and evaluate low-priority landholdings to determine their classification for either inclusion or deduction from the database, facilitating the completion of land acquisition and distribution by 2016. It mandates transparency and stakeholder involvement throughout the documentation process, including public posting of relevant information. The memorandum also establishes a framework for provincial and regional teams to assess and recommend actions on landholdings, ensuring an efficient and accountable approach to agrarian reform.
Quick Answers
- What is Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database about?
- The Department of Agrarian Reform (DAR) issued Memorandum Circular No. 04-14 on July 30, 2014, outlining guidelines for managing landholdings in the CARPER Land Acquisition and Distribution (LAD) Database. The circular emphasizes the need to review and evaluate low-priority landholdings to determine their classification for either inclusion or deduction from the database, facilitating the completion of land acquisition and distribution by 2016. It mandates transparency and stakeholder involvement throughout the documentation process, including public posting of relevant information. The memorandum also establishes a framework for provincial and regional teams to assess and recommend actions on landholdings, ensuring an efficient and accountable approach to agrarian reform.
- What type of law is DAR Memorandum Circular No. 04-14?
- Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database (DAR Memorandum Circular No. 04-14) is a Philippine Other Rules and Procedures enacted by the Congress of the Philippines.
- When was Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database enacted?
- Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database (DAR Memorandum Circular No. 04-14) was enacted on Jul 30, 2014.
- What is the citation for Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database?
- Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database, DAR Memorandum Circular No. 04-14, Jul 30, 2014 (Philippines)
Law Information
- Reference Number
- DAR Memorandum Circular No. 04-14
- Date Enacted
- Category
- Other Rules and Procedures
- Subcategory
- Department of Agrarian Reform
- Jurisdiction
- Philippines
- Enacting Body
- Congress of the Philippines
Full Law Text
July 30, 2014
DAR MEMORANDUM CIRCULAR NO. 04-14
| TO | : | All DAR Regional Directors |
| All Provincial Agrarian Reform Program Officers | ||
| All Municipal Agrarian Reform Program Officers | ||
| All Persons Concerned | ||
| SUBJECT | : | Guidelines Governing Landholdings that are for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database |
PREFATORY STATEMENT
The Department of Agrarian Reform (DAR) is mandated to complete the acquisition and distribution of the remaining CARP-covered landholdings (LHs) in 2016. The CARPER LAD Database, however, shows that there is a significant proportion of LHs that are tagged as low priority. The documentation and processing of these LHs have been temporarily stalled due to legal, technical, operational and administrative issues. In many instances, these LHs are not targeted for distribution; hence, these are just set aside. However, those landholdings which are subject of requests for coverage shall be given priority in the documentation and processing.
There are also instances when certain LHs not previously included in the CARPER LAD Database are identified by either the DAR field personnel or other stakeholders and are validated to be coverable. In such cases, these LHs are added to the CARPER LAD Database.
In view of the foregoing, there is an urgent need to conduct the review and evaluation of the LHs tagged in CARPER LAD Database as low priority to determine which among them will remain classified as low priority, be transformed into workable, or for deduction so that the remaining balance could be firmed up immediately for the purpose of planning and programming of the LAD targets. Likewise, a review and validation of newly identified LHs has to be undertaken to identify which LHs are for inclusion to the CARPER LAD Database.
In all levels of the documentation, processing and evaluation of subject LHs, transparency shall be observed to provide all stakeholders the opportunity to participate in the process. Thus, the necessary support of all concerned agencies, civil society organizations (CSOs), landowners, and agrarian reform beneficiaries (ARBs) is of utmost importance.
This Memorandum Circular (MC) is issued to provide guidelines for the processing and evaluation of LHs for inclusion in and deduction from the CARPER LAD Database after compliance of certain requirements.
SECTION 1. Coverage. —
This MC shall cover all landholdings that are tagged as low priority or which are for deduction from the CARPER LAD Database as well as newly identified LHs found to be coverable under CARP which are for inclusion in the CARPER LAD Database.
SECTION 2. Definition of Terms. —
1. CARPER LAD Database — refers to DAR's inventory of all agricultural LHs officially adopted by the Presidential Agrarian Reform Council Executive Committee (PARC ExCom) as the CARPER LAD Balance of the DAR as of July 1, 2009, and all LHs not initially included but subsequently identified, validated and added to it. These LHs in the database have either been distributed to agrarian reform beneficiaries (ARBs), retained by landowners, found to be not coverable under CARP or are still part of the balance as of January 1, 2014 for DAR's acquisition and distribution to ARBs.
2. Low Priority Landholdings — refer to agricultural landholdings in the CARPER LAD Database which exhibit characteristics that may render them not coverable under CARP during the LAD process. As such, these LHs shall be tagged as low priority LHs upon submission of supporting documents stipulated under Annex A (Matrix of Supporting Documents for LHs to be Declared as Low Priority and for Deduction from the CARPER LAD Database) of this MC. They shall remain in the LAD CARPER Database until declared as deducted by a final and executory order of the Regional Director or the Secretary.
3. Deducted Landholdings — refer to LHs listed in the CARPER LAD Database but have been found to be not coverable under CARP as evidenced by final and executory decisions/orders from the appropriate government entity and have been previously approved for deduction by the then LAD Technical Review Committee (LAD-TRC) pursuant to MC No. 8, Series of 2010, and those to be approved by the Regional Director or the Secretary pursuant to this MC. Those found to be either distributed before July 1, 2009 or with duplicate record in the LAD CARPER Balance as reflected in the LTI OpTool can be deducted from the database without the need for supporting documents. TECcHA
4. Landholdings for Inclusion — refer to newly identified agricultural LHs which were not included in the PARC ExCom-approved CARPER LAD Balance but have been validated to be coverable under CARP. These will be added to the CARPER LAD Database pursuant to the procedures under this MC.
5. High LAD Provincial Agrarian Reform Offices — refer to DAR Provincial Offices (DARPOs) with LAD balances of above 13,000 hectares. Twenty-two (22) DARPOs fall under this category and comprise 77% of the areas in the overall LAD balance. (See Annex B — List of High LAD and Low LAD Provincial Offices)
6. Low LAD Provincial Agrarian Reform Offices — refer to DAR Provincial Offices with LAD balances of 13,000 hectares and below. Fifty-three (53) DARPOs fall under this category and comprise 23% of the areas in the overall LAD balance. (See Annex-B — List of High LAD and Low LAD Provincial Offices)
7. LTI Operational Tool (OpTool) — is a web-based custom application designed to increase the efficiency and effectiveness in working with land tenure improvement (LTI) data. It is a new consolidated repository of LTI data from all sources. It makes data available to all authorized users through the internet.
SECTION 3. CARPER LAD Balance Updating. —
The CARPER LAD Balance represents the gross area that will be documented and processed pursuant to existing guidelines on LAD. However, some areas have to be deducted when found to be non-CARPable during the preliminary ocular inspection (pre-OCI) by the Municipal Agrarian Reform Program Officers (MARPOs) or during the conduct of DAR-Land Bank of the Philippines (LBP) Joint Field Investigation (JFI). In addition, portions of CARPable lands are projected to be retained by the landowners who have not yet exercised their right of retention. Thus, there is a need to update the CARPER LAD Balance on an annual basis, the process of which shall be integrated with the Department's year-end assessment framework. The CARPER LAD Balance Updating Report which would show the consolidated output will be generated by the OpTool. This shall be presented to the PARC ExCom for approval.
The CARPER LAD Balance formula is:
| Beginning LAD Balance (as of the beginning of | ||
| Reporting Period) | ||
| Less: | Deducted LHs (during the Reporting Period) | |
| Add: | Included LHs (Newly Identified LHs Validated to be | |
| Coverable during the Reporting Period) | ||
| Equals: | Sub-Total (for Distribution) | |
| Less: | LAD Accomplishment for the year | |
| • | EP/CLOA awarded | |
| • | LO's retention areas | |
| • | Non-CARPable areas (e.g., roads, canal, rivers, etc.) | |
| Equals: | Ending LAD Balance as of end of Reporting Period | |
| Less: | Low Priority LHs | |
| Equals: | Ending Workable Balance (as of End of Reporting | |
| Period) |
Where:
| Beginning Balance | = | No. of LHs and area (has.) as of the |
| beginning of the reporting period | ||
| Deducted LHs | = | No. of LHs and area (has.) as defined in |
| Item 3, Sec. 2 hereof | ||
| Included LHs | = | No. of LHs and area (has.) as defined in |
| Item 4, Sec. 2 hereof | ||
| LAD Accomplishment | = | No. of LHs and area with EP/CLOA |
| awarded for the period, retention areas, | ||
| and Non-CARPable areas (e.g., roads, | ||
| canal, rivers, etc.) | ||
| Low Priority LHs | = | No. of LHs and area (has.) as defined in |
| Item 2, Sec. 2 hereof |
SECTION 4. Provincial Review and Validation of Landholdings for Inclusion in or Deduction from the CARPER LAD Balance. —
Within seven (7) days from the issuance of this MC, the Provincial Agrarian Reform Program Officer II (PARPO II) shall convene or re-organize the Provincial Task Force on Problematic Landholdings (PTFPL) created pursuant to MC No. 9, Series of 2011.
In addition to the functions stated under MC 9, Series of 2011, the PTFPL shall:
1. Review and validate LHs for deduction and newly identified LHs for inclusion in the CARPER LAD Database in accordance with Section 6 hereof; and
2. Submit to the RD the report including recommendations and actions to be taken on landholdings found to be low priority, for inclusion in or for deduction from the CARPER LAD Database.
SECTION 5. Regional LAD Balance Evaluation Team (RLBET). —
In lieu of the LAD-TRC created under Special Order (SO) No. 627, Series of 2012, a Regional LAD Balance Evaluation Team (RLBET) shall be created and be composed of Regional Officers/personnel to be headed by the RD.
The RLBET shall have the following functions:
1. Review and evaluate the reports and recommendations of the PTFPL, including the Provincial Agrarian Reform Coordinating Committee (PARCCOM) Resolution on the same;
The RLBET may also be tasked to review and evaluate those reports and recommendations from other regions, as may be directed by the Undersecretary for Field Operations; and
2. Recommend to the concerned RD or RD of origin (as the case may be) the Approval/Disapproval of the inclusion in or deduction of LHs from the CARPER LAD Database using CARPER LAD Form 71 and 71-A and transmit same to the RD concerned or RD of origin.
SECTION 6. Procedures in the Processing of LHs for Inclusion in and Deduction from the CARPER LAD Balance. —
Immediately upon the issuance of this MC, the following shall be undertaken:
1. The PARPO shall:
1.1 Direct the LTI OpTool Administrator to generate and distribute copies to PTFPL members of the list of LHs tagged as low priority, including the specific reasons for tagging them as such, as well as the list of those LHs for inclusion in the CARPER LAD Database identified by the DAR and other stakeholders, and form a Secretariat to prepare the supporting documents therefor, as provided in Annex A (Matrix of Required Supporting Documents).
1.2 Within two (2) days from the receipt of the updated list of low priority LHs, and list of LHs for inclusion:
1.2.1 Convene the PTFPL to do an initial analysis and evaluation of the subject LHs on whether they can be transformed into workable ones or be instead considered for deduction, do an initial review of said LHs for inclusion in the CARPER LAD Database, and identify which of the LHs are already covered by PARCCOM resolutions previously submitted to the DAR Central Office LAD Technical Review Committee (now dissolved, with its functions assumed by the RLBET), and which LHs are not;
1.2.2 Provide the PARCCOM with the list of LHs not covered by previous resolutions, together with the supporting documents prepared by the Secretariat, with the request to do an initial review and recommendation thereof prior to the conduct of a Joint PTFPL-PARCCOM deliberation thereon to be convened by the PARPO; and IaDcTC
1.2.3 Simultaneous with the provision of the list to the PARCCOM, cause the posting of the list of LHs for inclusion in and deduction from the CARPER LAD Database in the bulletin boards of barangay and municipal halls for seven (7) days, as well as in the bulletin boards of the DARPO and DAR Municipal Offices (DARMO) where the properties are located (CARPER LAD Form No. 72), which list should be prominently labelled and located in front or in the lobby of the offices where it can be seen by the public; likewise, the PARPO shall send copies of the list to all concerned civil society organizations (CSOs) operating in the area, after which the Municipal/City Administrator,Barangay Captain/Secretary, BARC Chairman, MARPO, and PARPO II shall thereupon issue their corresponding Certification of Posting Compliance (CARPER LAD Form No. 72-A); in this regard, any person who may have concerns or wish to be clarified on the subject LH may submit their comments/protests/petitions to the DAR Regional Office within the seven (7) day period of posting.
Any protest/petition shall be resolved as an Agrarian Law Implementation (ALI) case pursuant to DAR AO No. 2, Series of 2003, entitled, "2003 Rules for Agrarian Law Implementation Cases".
Pending final and executory resolution of the ALI case, the landholding will be treated as low priority for land acquisition and distribution.
1.3 Within seven (7) days from receipt of the List by the PARCCOM, convene the Joint DAR-PTFPL and PARCCOM to deliberate and decide on which landholdings would require field verification. AcDHCS
2. The PTFPL and PARCCOM shall jointly:
2.1 Conduct and complete the joint field verification on the LHs, in coordination with the BARC or, in the absence, thereof, the Barangay Council; and
2.2 Deliberate on the findings of the field verification and pass a resolution containing the recommendation on which LHs are for deduction or inclusion, and which LHs are to be maintained as low priority as there are still problems that have to be addressed before documentation and processing of the landholdings can proceed.
3. The PARPO shall then submit the results of the review and recommendations (CARPER LAD Form No. 71 — Results of Review of Low Priority LHs in the CARPER LAD Database and CARPER LAD Form No. 71A — Results of Review of Newly Identified LHs for inclusion in the CARPER LAD Database), including the following supporting documents specified in Annex A (i.e., titles, certifications, photos of the LH, Joint PTFPL-PARCCOM Resolution for inclusion and deduction), to the RLBET, through the Regional Director, for evaluation and approval, which entire process at the provincial level shall be completed within thirty (30) days for low LAD provincial offices and sixty (60) days for high LAD provincial offices; moreover, the DARPOs may submit partial outputs provided that the review of the entire list should not exceed 30 or 60 days, as the case may be (Refer to Annex B — List of High LAD Provincial Offices and Low LAD Provincial Offices).
4. The Regional Director (RD) shall:
4.1 Within five (5) working days from receipt of the recommendations of the Joint PTFPL-PARCCOM submitted by the PARPO, convene the RLBET to:
4.1.1 evaluate and act on the findings of the Joint PTFPL-PARCCOM, as well as on the comments, petitions or protests from stakeholders, by filling up the appropriate column(s) on CARPER LAD Form Nos. 71 and 71A;
4.1.2 prepare a Resolution for landholdings which are approved for inclusion in or deduction from the CARPER LAD Database; and
4.1.3. prepare and send replies to the stakeholders who submitted comments, petitions, or protests.
The Undersecretary for Field Operations, as part of his oversight function, may direct a DAR office from other regions to evaluate the findings of the PTFPL. Likewise, in case of voluminous workload, the RD may also submit a request to the Undersecretary for assistance from other regions in the evaluation of the PTFPL's findings. Within seven (7) days from the receipt of the request, the Undersecretary for Field Operations shall identify and direct a particular RLBET of another region to assist the requesting RD.
Within three (3) days from receipt of the action from the Undersecretary for Field Operations, the requesting RD or RD who has supervision over the PARPO whose Joint PTFPL-PARCCOM recommendations the Undersecretary wants to be reviewed by another region, shall forward the said recommendations, together with the pertinent documents, to the reviewing RD identified by the Undersecretary for Field Operations.
Within five (5) working days from receipt of the recommendation by the PARPO, the reviewing RD shall convene the RLBET to:
a. evaluate and act on the Joint findings of the PTFPL-PARCCOM by filling up the appropriate column(s) on CARPER LAD Form Nos. 71 and 71A; and
b. transmit its findings and recommendations to the requesting RD.
The RD concerned shall act on the recommendation of the reviewing RLBET and prepare a Resolution for landholdings which are approved for inclusion in or deduction from the CARPER LAD Database.
4.2 Transmit the list of LHs found to be either workable, low priority, and for inclusion in or deduction from the CARPER LAD Database (CARPER LAD Form Nos. 71 and 71A) to the DARPO for updating in the LTI OpTool, furnishing a copy thereof to the BLTI. EaCSHI
4.2.1 The PARPO shall, upon receipt of the said list of LHs found to be either workable, low priority, and for inclusion in or for deduction from the CARPER LAD Database from the RD, direct the:
a. LTI OpTool Administrator to update the LTI OpTool; and
b. CARPO-Operations and MARPOs concerned to proceed with the documentation of the LHs found to be workable.
4.3 Submit the RLBET Resolution for landholdings approved for inclusion in or deduction from the CARPER LAD Database, including all supporting documents, to the BLTI, on account of which the latter shall prepare a summary list of all Resolutions for submission to the Undersecretary for Field Operations, copy furnished the PARC Secretariat and all CSOs listed in the database of the Public Affairs and Media Relations Service (PAMRS).
The BLTI shall conduct further validation through spot audit of LHs for deduction. The CSOs may participate in the conduct of the spot audit.
4.4 With respect to cases pending at the DARRO, direct the Chief of the Regional Legal Division to facilitate the review of the same, and prepare a resolution within fifteen (15) days for the RD's approval; otherwise, prepare a Memorandum on why the case cannot yet be resolved, and furnish a copy of the Resolution to the DARCO Special Legal Team through its Regional point person.
Provide the DARCO Special Legal Team with the list of LHs with cases pending at the DAR Central Office (DARCO), Office of the President (OP), Court of Appeals (CA), or Supreme Court (SC), in order to facilitate the resolution or follow-up of these cases. CIcEHS
4.5 The BLTI shall prepare an updated CARPER LAD Database as of the end of the year which shall be submitted to the PARC Executive Committee (ExCom), through the PARC Secretariat, for approval.
SECTION 7. Monitoring and Reporting. —
The monitoring of the status of subject LHs at all levels shall be through the LTI OpTool. Hence, the PARPOs shall ensure that the said database is regularly updated through the web-based LTI OpTool.
The PARPO, in coordination with the PARCCOM, shall regularly monitor the status of the subject LHs and, if necessary, convene the PTFPL to address issues that may crop up during the documentation of the LHs which have been transformed into workable LHs. If necessary, he shall seek the assistance of other agencies concerned to facilitate the resolution of issues.
Based on the LTI OpTool, the BLTI shall generate using the OpTool, the Landholding Balance Reports, accomplishment and other reports needed by the management for inclusion in the annual agency performance report.
Likewise, the Field Operations Office through the BLTI shall furnish the major CARP stakeholders (i.e., Congressional Oversight Committee on Agrarian Reform (COCAR), CSOs, etc.) with copies of the said reports including the low-priority LHs which shall also be posted in the DAR website.
SECTION 8. Transitory Provision. —
Upon the issuance of this MC, the BLTI, which has assumed custody over all the documents submitted by PARPOs to the DARCO LAD-TRC Secretariat, shall transmit to the RLBET all PARCCOM Resolutions undergoing review and evaluation by the LAD-TRC, together with all the supporting documents, for their review and evaluation pursuant to Section 5 of this MC. Consequently, the RLBET shall process the same following the procedures laid down under the aforementioned Section.
SECTION 9. Repealing Clause. —
This MC modifies or repeals all issuances or portions thereof that are inconsistent herewith.
SECTION 10. Effectivity Clause. —
This MC shall take effect immediately.
Diliman, Quezon City, July 30, 2014.
(SGD.) VIRGILIO DE LOS REYESSecretaryDepartment of Agrarian Reform
ANNEX A
Matrix of Supporting Documents for LHs to be Deducted from the CARPER LAD Balance
|
Reason for
|
Deduction
|
|
Required Documents as
|
|
Required Documents for
|
Legal Bases
|
|
Deduction
|
Code
|
|
Low Priority
|
|
Deduction
|
|
|
|
(For OpTool)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| LH with 18% slope | C01 | • | MARPO's Pre-OCI Report | • | CENRO Certification that | Section 10 RA |
| and above, and | (CARPER LAD Form 1) | the entire landholding is | 6657, as | |||
| undeveloped | indicating that the entire | located within an 18% | amended | |||
| landholding is | slope and above | |||||
| undeveloped as of June | ||||||
| 15, 1988 | • | MAO/PAO certification | ||||
| that the entire | ||||||
| landholding is not | ||||||
| • | GE Certification (CARPER | agriculturally developed | ||||
| LAD Form 1B) that the | ||||||
| entire landholding is | • | In case of EO 407/448 | ||||
| located within an 18% | lands, Letter of Rescission | |||||
| slope and above | of the Deed of Transfer | |||||
| (DOT) | ||||||
| LH within | C02 | • | GE Certification | • | CENRO Certification that | Section 10 RA |
| watershed; | (Amended CARPER LAD | the entire landholding is | 6657, as | |||
| national park | Form 1B) that the | within watershed area | amended | |||
| property has been | and/or national park | |||||
| projected in the land | ||||||
| classification map and | • | Certified true copy of the | ||||
| found to be within a | projection map | |||||
| watershed area or | ||||||
| national park. | • | In case of EO 407/448 | ||||
| lands, Letter of Rescission | ||||||
| of the Deed of Transfer | ||||||
| (DOT) | ||||||
| LH within | C03 | • | GE Certification | • | CENRO Certification that | CA 141 |
| timberland; | (Amended CARPER LAD | the entire landholding is | ||||
| unclassified public | Form 1B) that the | within timberland or | ||||
| forest | property has been | unclassified public forest | ||||
| projected in the LC Map | area | |||||
| and found to be within | ||||||
| timberland or unclassified | • | Certified true copy of the | ||||
| public forest. | projection map | |||||
| • | In case of EO 407/448 | |||||
| lands, Letter of Rescission | ||||||
| of the Deed of Transfer | ||||||
| (DOT) for particular LH | ||||||
| covered by the Deed of | ||||||
| Transfer (DOT) | ||||||
| LH within river; | C04 | • | MARPO's Pre-OCI Report | • | CENRO Certification that | Section 10 RA |
| swampy | indicating that the entire | landholding is within the | 6657, as | |||
| landholding is within river | river or swampy area | amended | ||||
| or swampy area | ||||||
| • | MAO/PAO Certification | |||||
| • | GE Certification (CARPER | that the land is not | ||||
| LAD Form 1B) that the | suitable for agricultural | |||||
| entire LH is within river or | crop production | |||||
| swampy area | ||||||
| • | In case of EO 407/448 | |||||
| lands, Letter of Rescission | ||||||
| of the Deed of Transfer | ||||||
| (DOT) for particular LH | ||||||
| covered by the Deed of | ||||||
| Transfer (DOT) | ||||||
| LH used for | C05 | • | MARPO's Investigation | • | PARPO Certification that | Section 10, RA |
| infrastructure | Report with photos | LH has been verified to be | 6657 | |||
| actually, directly and | ||||||
| • | GE Certification (CARPER | exclusively used for | ||||
| LAD Form 1B) that the LH is | infrastructure | |||||
| entirely used for | ||||||
| infrastructure | ||||||
| LH is silted; rocky | C07 | • | GE Certification (CARPER | • | MAO/PAO Certification | A.O. 7, S. of |
| LAD Form 1B) that the | that the land is not | 2011 as | ||||
| entire LH is silted or rocky | suitable for agricultural | amended | ||||
| crop production | ||||||
| • | MARPO's Investigation | |||||
| Report indicating that the | • | In case of EO 407/448 | ||||
| entire LH is silted or rocky | lands, Letter of Rescission | |||||
| of the Deed of Transfer | ||||||
| (DOT) particular LH | ||||||
| covered by the Deed of | ||||||
| Transfer (DOT) | ||||||
| LH is within | C08 | • | MARPO's Investigation | • | Final and Executory Order | DOJ Opinion |
| zonified areas prior | Report that the LH is not | of Exemption/Exclusion | No. 44; A.O. 1, | |||
| to 1988, except PD | covered under PD 27 | from CARP Coverage | S. 2002 | |||
| 27 lands; built-up | ||||||
| zone; industrial | • | GE Certification (CARPER | • | In case of EO 407/448 | ||
| zone; residential | LAD Form 1B) that LH is | lands, Letter of Rescission | ||||
| area/home lots; | within zonified areas as | for particular LH covered | ||||
| school expansion | built-up zone; industrial | by the Deed of Transfer | ||||
| zone; residential area/home | (DOT) | |||||
| lots; school expansion and | ||||||
| other non-agricultural uses | ||||||
| prior to June 15, 1988, | ||||||
| except PD 27 lands. | ||||||
| • | Zoning Administrator | |||||
| Certification that there is | ||||||
| a zoning ordinance prior | ||||||
| to June 15, 1988 | ||||||
| classifying the area, | ||||||
| where the LH is located, | ||||||
| as non-agricultural. | ||||||
| Legally converted | C09 | • | GE Certification (CARPER | • | Certified true copy of | AO 1 S. 2002 |
| lands/With Order | LAD Form 1B) that the | Order of Conversion with | ||||
| of Conversion | land referred to in the | Finality | ||||
| conversion order is the | ||||||
| same as that referred to. | • | In case of EO 407/448 | ||||
| lands, Letter of Rescission | ||||||
| for particular LH covered | ||||||
| by the Deed of Transfer | ||||||
| (DOT) | ||||||
| Illegally converted | C10 | • | MARPO OCI Report | • | Final and Executory Order | AO 1 S. 2002 |
| lands | indicating that the entire | or decision (by the Court | ||||
| LH has been illegally | or Administrative bodies) | |||||
| converted | on the illegal conversion | |||||
| with penalty. | ||||||
| • | DA Certification that the | |||||
| land can no longer be | ||||||
| used for agricultural | ||||||
| purposes | ||||||
| With Order of | C11 | • | Copy of the Order of | • | Certificate of Finality on | A.O. 3 s. 2003; |
| Retention | Retention | the Order of Retention | A.O. 7, S. 2011 | |||
| Landholdings | C12 | • | MARPO's Investigation | • | Order of Exemption/ | Section 10 RA |
| entirely devoted to | Report | Exclusion with finality | 6657 as | |||
| livestock, poultry, | amended | |||||
| swine; fishpond | • | PARPO Certification that | ||||
| the entire LH is actually, | ||||||
| directly and exclusively | ||||||
| devoted to livestock, | ||||||
| poultry, swine; fishpond | ||||||
| A & D lands | C14 | • | Note: no longer | Joint DAR- | ||
| classified after | deductible. Proceed with | DENR AO 3, S. | ||||
| 1984 unless | the documentation | 2014 | ||||
| proclaimed as | pursuant to DAR-DENR | |||||
| Settlement area | JAO 3, S. 2014 | |||||
| or under litigation | ||||||
| Road lots | C15 | • | Note: if only a portion of | • | PARPO Certification | DOJ Opinion |
| the LH, segregate and | No. 44 | |||||
| proceed with | ||||||
| documentation pursuant | ||||||
| to AO 7, S. 2011 | ||||||
| LO has manifested | C16 | • | Certified copy of LO's | • | Certificate of Retention, | AO 3 s. 2003 |
| intention to | Manifestation filed | or | AO 7 s. 2011 | |||
| exercise right of | before the DAR within | |||||
| retention for the | the prescribed period | • | Certificate of Finality on | |||
| entire LH | the Order of Retention | |||||
| LO died before | C18 | • | LO's Death Certificate and | • | PARPO's Certification of | AO 1, S. 1989 |
| June 15, 1988 and | NSO-authenticated Birth | Retention | AO 3, S. 2003 | |||
| the heirs have | Certificates of the heirs | AO 7, S. 2011 | ||||
| manifested the | • | RD's Order of Retention | ||||
| intention to file | • | Certified copy of Heirs' | ||||
| application for | Manifestation filed | • | Affidavit of Heirship or | |||
| retention for the | before the DAR within | Extra Judicial | ||||
| entire LH | the prescribed period | Settlement of Estates | ||||
| • | Assessor's certification | |||||
| on the aggregate area of | ||||||
| the heir/s | ||||||
| LH with titles | C22 | • | Copies of Titles (both the | AO 1, 1989 | ||
| cancelled prior to | cancelled & active title) | AO 3, S. 2012 | ||||
| June 15, 1988. | ||||||
| (These refer to LHs | ||||||
| with current and | ||||||
| cancelled titles | ||||||
| both captured in | ||||||
| the database) | ||||||
| Lands for public use | C24 | • | MARPO's investigation | • | Deed of Conveyance to | Section 10, RA |
| (school, market, | report indicating that | LGUs or government | 6657 as | |||
| etc.) | the LH is for public use | office | amended | |||
| (school, market, etc.), | ||||||
| with photos | • | Copy of Proclamation | ||||
| or Court Order | ||||||
| • | In case of EO 407/448 | |||||
| lands, Letter of | ||||||
| Rescission for particular | ||||||
| LH covered by the | ||||||
| Deed of Transfer (DOT | ||||||
| LH with Homestead | C25 | • | Copy of Homestead | • | PARPO Certification | AO 7 S. 2011 |
| Patent & original | patent | |||||
| homesteader/heir | ||||||
| is still the actual | • | MARPO's OCi report | ||||
| occupant/ | including a Sworn | |||||
| cultivator | Affidavit of the | |||||
| homesteader or | ||||||
| patentee/heir that | ||||||
| he/she is still the actual | ||||||
| occupant/cultivator | ||||||
| • | GE Certification that the | |||||
| land is the same as that | ||||||
| for which a patent or | ||||||
| title had been issued | ||||||
| LH with Handog | • | Copy of Title/Patent | • | CENRO Certification | ||
| Titulo issued after | indicating that it was | that the LH was | ||||
| June 1988 | issued after June 15, | awarded through CARP | ||||
| 1988; | ||||||
| Untitled Private | C27 | • | Note: Proceed with | • | Approved survey plan | DAR-DENR JAO |
| Agricultural Lands | documentation | 03, S. 2014 | ||||
| (UPALs) above 12 | pursuant to DAR-DENR | |||||
| hectares | JAO 03, S. 2014 | |||||
| — (involving several | • | Only the excess of the | ||||
| LHs of an LO) | titling limit of 12 or 24 | |||||
| hectares will be | ||||||
| deductible | ||||||
| LH under VLT, 5 | C28 | • | Order of Disapproval by RD | • | Certificate of Finality | AO 7, S 2011 |
| hectares and below, | ||||||
| disapproved by the | ||||||
| Regional Director | ||||||
| (RD) | ||||||
| Landholding cannot | C29 | • | MARPO's Investigation | • | DENR Certification that | AO 3 S 2012 |
| be located on the | Report | the technical | ||||
| ground | description of such LH | |||||
| • | DAR GE Certification that | as stated in the title | ||||
| the land cannot be | cannot be located in | |||||
| located after verification | the base map | |||||
| of the technical | ||||||
| description in the title | • | In case of EO 407/448 | ||||
| lands, Letter of | ||||||
| Rescission for particular | ||||||
| LH covered by the | ||||||
| Deed of Transfer (DOT) |
CARPER LAD FORM 1-B
Geodetic Engineer Certification
CARPER LAD FORM NO. 71
Results of the Review of Low Priority Landholdings in the CARPER LAD Database
CARPER LAD FORM NO. 71-A
Results of the Review of Newly Identified Landholdings for Inclusion in the CARPER LAD Database
CARPER LAD FORM NO. 72
Notice on Landholdings for Inclusion in or for Deduction from the CARP Coverage/LAD Database
CARPER LAD FORM NO. 72-A
Certificate of Posting Compliance
Cite This Law
Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database, DAR Memorandum Circular No. 04-14, Jul 30, 2014 (Philippines)
Guidelines Governing Landholdings for Inclusion in or Deduction from the Carper Land Acquisition and Distribution Database, DAR Memorandum Circular No. 04-14 (Phil. 2014)
Related Laws
- Amendments to the Revised Rules and Procedures Governing Acquisition and Distribution of Private Agricultural LandsDAR Administrative Order No. 04-14 • May 7, 2014 • Other Rules and Procedures
- Guidelines and Procedures on the Parcelization of Landholdings with Collective Certificates of Land Ownership AwardDAR Administrative Order No. 02, s. 2019 • Mar 29, 2019 • Other Rules and Procedures
- Clarificatory Guidelines Governing the Identification, Screening and Selection of Farmworker Beneficiaries for Haciendas, Commercial Farms or Plantations Pursuant to R.A. No. 6657, as AmendedDAR Memorandum Circular No. 06-14 • Dec 2, 2014 • Other Rules and Procedures
- Guidelines on ARB Carding and Identification System and its Mainstreaming in Land Acquisition and Distribution ProcessDAR Administrative Order No. 03-08 • Jun 16, 2008 • Other Rules and Procedures
- Revised Rules and Procedures on the Acquisition and Distribution of Private Agricultural Lands Under R.A. No. 6657, as AmendedDAR Administrative Order No. 07-11 • Sep 30, 2011 • Other Rules and Procedures
- Guidelines in the Disposition of Untitled Privately-Claimed Agricultural LandsJoint DAR-DENR Administrative Order No. 03-14 • Mar 26, 2014 • Other Rules and Procedures
Browse More Other Rules and Procedures
Explore other laws in the Other Rules and Procedures category.
View All Other Rules and ProceduresNeed Help Understanding This Law?
Ask our AI assistant to explain provisions, implications, or related laws.
Ask AI About This Law