Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage
DPWH Department Order No. 033-17 establishes guidelines for streamlining the Master Plan and feasibility studies for flood control and drainage in the Philippines, in alignment with the Disaster Risk Reduction and Management Act (RA 10121). The Order emphasizes a holistic approach to disaster risk management, prioritizing the planning of flood control projects based on design flood frequencies and incorporating non-structural measures like watershed management and flood hazard mapping. It outlines the responsibilities of the UPMO-Flood Control Management Cluster and Regional Offices in conducting these studies, ensuring coordination to avoid duplication. A Steering Committee and Technical Working Group will oversee and monitor the studies, while procurement processes for consulting services will be standardized to maintain uniformity. The guidelines take immediate effect.
Quick Answers
- What is Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage about?
- DPWH Department Order No. 033-17 establishes guidelines for streamlining the Master Plan and feasibility studies for flood control and drainage in the Philippines, in alignment with the Disaster Risk Reduction and Management Act (RA 10121). The Order emphasizes a holistic approach to disaster risk management, prioritizing the planning of flood control projects based on design flood frequencies and incorporating non-structural measures like watershed management and flood hazard mapping. It outlines the responsibilities of the UPMO-Flood Control Management Cluster and Regional Offices in conducting these studies, ensuring coordination to avoid duplication. A Steering Committee and Technical Working Group will oversee and monitor the studies, while procurement processes for consulting services will be standardized to maintain uniformity. The guidelines take immediate effect.
- What type of law is DPWH Department Order No. 033-17?
- Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage (DPWH Department Order No. 033-17) is a Philippine Other Rules and Procedures enacted by the Congress of the Philippines.
- When was Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage enacted?
- Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage (DPWH Department Order No. 033-17) was enacted on Mar 16, 2017.
- What is the citation for Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage?
- Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage, DPWH Department Order No. 033-17, Mar 16, 2017 (Philippines)
Law Information
- Reference Number
- DPWH Department Order No. 033-17
- Date Enacted
- Category
- Other Rules and Procedures
- Subcategory
- Department of Public Works and Highways
- Jurisdiction
- Philippines
- Enacting Body
- Congress of the Philippines
Full Law Text
March 16, 2017
DPWH DEPARTMENT ORDER NO. 033-17
| SUBJECT | : | Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage |
One of the policies enshrined in the IRR of RA 10121 or the Disaster Risk Reduction and Management Act is to ''Adopt a disaster risk reduction and management approach that is holistic, comprehensive, integrated and proactive in lessening the socio-economic and environmental impacts of disasters including climate change and promote the involvement and participation of all sectors and all stakeholders concerned, at all levels, especially the community". It is then critical that the flood control and drainage structures are carefully planned and designed, and the flood control projects have a flood control plan, based on the forecasted river phenomenon which is likely to occur as a result of the discharges corresponding to the design flood frequencies. Moreover, the Master Plan shall promote non-structural measures such as watershed management, flood hazard mapping, warning and evacuation system, land use planning, zoning for high risk areas, etc.
The Master Plan incorporates the flood control policy, strategy, target flood magnitude and main infrastructure works, etc. in the river system. Feasibility studies of prioritized projects proposed in the Master Plan are conducted within the framework of socio-economic importance. cSEDTC
In order to accelerate the conduct of master plan and feasibility studies which shall serve as basis for priority flood control and drainage studies, the UPMO-Flood Control Management Cluster (UPMO-FCMC) and the Regional Offices (ROs)/District Engineering Offices (DEOs) shall pursue the conduct of these studies, in coordination with the Planning Service. The Planning Service shall ensure no duplication in the conduct of these studies between UPMO and ROs/DEOs.
The following guidelines are set and prescribed, consistent with existing laws and management policies of the Department.
1. Under the DPWH Performance Governance System (PGS) Scorecard being developed for 2017-2022, the 120 priority principal river basins as identified under the JICA-Assisted Nationwide Flood Risk Assessment Study (NaFRA Study) will be prioritized.
2. Areas of Responsibilities between the UPMO-FCMC and ROs will be as follows:
|
Responsible Office |
River Basins |
|
UPMO-FCMC |
Major River Basins and Principal River Basins traversing two (2) or more ROs. |
|
Regional Offices (ROs)/District Engineering Offices (DEOs) |
Principal River including drainage in flood affected areas in a region. |
Note: Major River Basins — Drainage area of more than 1400 sq. km.
3. A Steering Committee (SC) and Technical Working Group (TWG) shall be created to provide direction and guidance; monitor the progress of the study; and review and evaluate the results and recommendations of the study.
4. Considering the limited expert local consultants, award for each consulting firm shall not be limited to one (1) contract. However, strict monitoring of overlapping of consulting personnel shall be conducted by the Procurement Service for Consultancy Services and the proposed TWG. SDAaTC
5. The Terms of Reference (TOR), Approved Budget for the Contract (ABC) and criteria for the selection of consultants will be approved based on the delegated authorities of the ROs. Only in the case that the cost of consulting services is above the RO delegated authority shall the TOR, ABC and selection criteria be endorsed for approval by the DPWH Central Office.
6. The templates for the TOR, ABC and selection criteria will be jointly formulated by the Planning Service, Bureau of Design, Bureau of Construction, UPMO-FCMC and representatives from the ROs to provide uniformity in the procurement of consulting services.
This Order takes effect immediately.
(SGD.) MARK A. VILLARSecretary
Cite This Law
Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage, DPWH Department Order No. 033-17, Mar 16, 2017 (Philippines)
Guidelines for Streamlining River Basin Master Plan and Feasibility Study of Flood Control and Drainage, DPWH Department Order No. 033-17 (Phil. 2017)
Related Laws
- Flood Control and Drainage/Slope Protection Projects PoliciesDPWH Department Order No. 023-15 • Feb 20, 2015 • Other Rules and Procedures
- Guidelines on River Dredging Operations for Flood ControlDPWH Department Order No. 139-14 • Dec 1, 2014 • Other Rules and Procedures
- Creating the River Basin Control OfficeExecutive Order No. 510 • Mar 5, 2006 • Presidential Issuances
- Declaring DENR's River Basin Control Office as Lead Agency in Developing the Country's River BasinsExecutive Order No. 816 • Jul 6, 2009 • Presidential Issuances
- Creation of the Cagayan River Basin Project Management OfficeExecutive Order No. 747 • Aug 1, 2008 • Presidential Issuances
- Formulation of an Integrated Plan of Action for Flood Control and Drainage Programs of the GovernmentLetter of Instructions No. 408 • May 29, 1976 • Presidential Issuances
Browse More Other Rules and Procedures
Explore other laws in the Other Rules and Procedures category.