Daily Drilling Bulletin
PSE Circular for Brokers No. 2326-99 • Philippine Stock Exchange • Circulars for Brokers • Sep 16, 1999
Full text
September 16, 1999 PSE CIRCULAR FOR BROKERS NO. 2326-99 DAILY DRILLING BULLETIN 16 SEPTEMBER 1999 SULTAN SA BARONGIS-2 WELL (Cotabato Basin) The PNOC-EC drilled the well to a depth of 1,084 feet, an advance of 32 feet since yesterday. The operator will continue to drill ahead and conduct coring operations. (SGD.) GRISELDA J. G. BAUSA Director Energy Resource Development Bureau DAILY DRILLING REPORT (TECHNICAL INFORMATION) REPORT No.: 06 TIME RECEIVED: 0700 HRS WELL NAME : Sultan sa Barongis-2 (SSB-2) Well DATE : 16 September 1999 CONTRACT: GSEC.73 OPERATIONS LOCATION: COTABATO BASIN TIME COVERED: 24 HRS OPERATOR: PHILIPPINE NATIONAL OIL COMPANY-EC. 100.00% PROGRAMMED DEPTH: 1.500 FEET GROUND LEVEL: 17 FEET PRESENT DEPTH: 1084 FEET DEPTH ADVANCE: 32 FEET PRESENT OPERATION: DRILLING AHEAD THE 6-INCH HOLE TESTING RECORD: FLOW TEST DEPTH INTERVAL BOPD BWPD SCFGD ______________ _________ _________ _________ PROGRAMME NEXT 24 HOURS: DRILL AHEAD AND CORE. REMARKS: ______________________________________________ ______________________________________________ APPROVED FOR RELEASE: (SGD.) GRISELDA J. G. BAUSA Director Energy Resource Development Bureau
Ask what this means for your situation
The assistant quotes the passage it relies on and links the source, so you can check every figure it gives you.