PSE Circular for Brokers No. 2034-99
PSE Circular for Brokers No. 2034-99 • Philippine Stock Exchange • Circulars for Brokers • Aug 16, 1999
Full text
August 16, 1999 PSE CIRCULAR FOR BROKERS NO. 2034-99 DAILY DRILLING BULLETIN SULTAN SA BARONGIS-1 WELL (Cotabato Basin ) Over the weekend, the PNOC-Exploration Corporation conducted wireline logging and installed the 7-inch casing. The operator is currently setting the blow-out preventer prior to drilling ahead the 6-inch hole. The well remains at a depth of 1,545 feet. (SGD.) GRISELDA J. G. BAUSA Director Energy Resource Development Bureau
Ask what this means for your situation
The assistant quotes the passage it relies on and links the source, so you can check every figure it gives you.