Skip to main content

An Ordinance Amending the Fees Imposed in Annex A Under Section 10 of Municipal Ordinance No. 98-020-023

Orion Municipal Tax Ordinance No. 04-010-014 • Local Tax Ordinances • Bataan • Oct 19, 2004

Full text

October 19, 2004 Excerpts from the Minutes of the Regular Session of the Sangguniang Bayan of Orion, Bataan Held at the Session Hall of the Orion Municipal Legislative Building on October 19, 2004 ORION MUNICIPAL TAX ORDINANCE NO. 04-010-014 AN ORDINANCE AMENDING THE FEES IMPOSED IN ANNEX A UNDER SECTION 10 OF MUNICIPAL ORDINANCE NO. 98-020-023 ENTITLED "AN ORDINANCE REGULATING THE PROCESSING AND APPROVAL OF SUBDIVISION PLANS AND CREATING THE PROPER COMMITTEES, AND ESTABLISHING THE BASIC PROCEDURES AND OTHER REQUIREMENTS ESSENTIAL TO THIS FUNCTION" AND ADOPTING THE HLURB 2004 REVISED SCHEDULE OF FEES AND PENALTIES Sponsors: Hon. Luz D. Austria, Hon. Isagani B. de Leon, Hon. Donaldo R. Chan, Hon. Edward T. Seeckts, Hon. Eugenia E. Mariano, Hon. Angelita C. Santos WHEREAS, Municipal Ordinance No. 98-020-023, entitled "An Ordinance Regulating the Processing and Approval of Subdivision Plans and Creating the Proper Committees, and Establishing the Basic Procedures and Other Requirements Essential to this Function" was enacted based on the provisions of RA 7160, otherwise known as the Local Government Code of 1991; WHEREAS, the said ordinance imposed fees and fines in accordance with the provisions of HLURB Memorandum Circular No. 4, Series of 1991; WHEREAS, the HLURB issued Resolution No. 760 on February 18, 2004 approving the 2004 Revised Schedule of Fees, which was endorsed by the Hon. Antonio L. Raymundo Jr., Municipal Mayor, for consideration by this august body; WHEREAS, the existing schedule of fees contained in the ordinance has seen its days and needs proper adjustments; On motion duly seconded, be it, RESOLVED, that the Sangguniang Bayan of Orion, Bataan, in regular session duly assembled, hereby resolves to enact, on third and final reading, this Ordinance amending the fees imposed in Annex A under Section 10 of Municipal Ordinance No. 98-020-023; SECTION 1. The Annex A of Section 10 of Municipal Ordinance No. 98-020-023 is hereby amended to read as follows: I. Zoning/Locational Clearance A. Residential Structures, single attached/detached, the project cost of which is: 1. PhP100,000.00 and below PhP200.00 2. Over PhP100,000.00 To PhP200,000.00 400.00 3. Over PhP200,000.00 500.00 + 1/10 of 1% in excess of PhP200,000.00 B. Apartment/Townhouses 1. Project cost of PhP500,00.00 n PhP1,000.00 and below 2. Over PhP500,000.00 1,500.00 To PhP2.0 M 3. Over PhP2.0 M 2,500.00 + 1/10 of cost in excess of PhP2.0 M, Regardless of the Number of Doors C. Dormitories 1. Project cost of PhP2.0 M PhP2,500.00 And below 2. Project cost over PhP2.0 M 2,500.00 + 1/10 of cost in excess of PhP2.0 M, Regardless of the Number of Doors D. Institutional, the project cost of which is: 1. PhP2.0 M and below PhP2,000.00 2. Over PhP2.0 M 1,000.00 + 1/10 of 1% of cost in Excess of PhP2.0 M E. Commercial, Industrial, Agro-Industrial, the project cost of which is: 1. PhP100,000.00 and below PhP1,000.00 2. Over PhP100,000.00 To PhP500,000.00 1,500.00 3. Over PhP500,000.00 To PhP1.0 M 2,000.00 4. Over PhP1.0 M to PhP2.0 M 3,000.00 5. Over PhP2.0 M 5,000.00 + 1/10 of 1% of cost in Excess of PhP2.0 M F. Special Uses/Special Projects, the project cost of which is: 1. PhP2.0 M and below PhP5,000.00 2. Over PhP2.0 M 5,000.00 + 1/10 of 1% of cost in Excess of PhP2.0 M G. Alteration/Expansion (Affected areas/cost of expansion only) Same as Original Application AIHTE II. Subdivision & Condominium Projects/Activities (under PD 957) A. Approval of Subdivision Plan (Including Townhouses) 1. Preliminary Approval & PhP250.00/ha. Or a fraction thereof Location Clearance (PALC) Subdivision Development Plan (PSDP) * Inspection Fee 1,000.00/ha. Regardless of density (DP, CR/LS, ETD, COC, etc.) a. Final Approval and Development 2,000.00/ha. Regardless of density Permit a. n Additional Fee on floor area of house or building sold with The Lot 2.00/sq.m. b. Inspection Fee (not applicable 1,000.00/ha. Regardless of density for projects already inspected (DP, CR/LS, ETD, COC, etc.) for PALC application) 3. n Alteration of Plans Same as Final Approval and Development Permit 4. Certificate of Registration 2,000.00 Processing Fee 5. License to sell (per saleable lots) 150.00 * Additional on floor area of House or building sold with the lot PhP10.00/sq.m. - Inspection Fee 1,000.00/ha. regardless of Density (DP, CR/LS, ETD, COC, etc.) 6. Certificate of Completion (per hectare) * Certificate Fee 150.00 * Processing Fee 2,000.00/ha. regardless of Density 7. Extension of time to develop 350.00 * Inspection Fee (affected/unfinished areas only) 1,000.00/ha. regardless of Density B. Approval of Condominium Project (under PD 957) Final Approval and Development Permit 1. Processing Fee PhP5.00/sq.m. a. Land Area 200.00/floor b. Number of Floors 4.00/sq.m. c. Building Areas 12.00/sq.m. of GFA * Inspection Fee Same as Final Approval and Development Permit 2. Alteration of Plan Same as Final Approval and Development Permit 3. Conversion (affected areas only) Same as Final Approval and Development Permit 4. Certificate of Registration Processing Fee 2,000.00 5. License to Sell a. Residential (saleable areas) 12.00/sq.m. b. Commercial/Office (saleable areas) 25.00/sq.m. 6. Extension of Time to Develop 350.00 * Inspection Fee 12.00/sq.m. of GFA 7. Certificate of Completion * Processing Fee 150.00 * Inspection Fee 12.00/sq.m. of GFA III. Projects Under BP 220 A. Subdivision 1. Preliminary Approval and Locational Clearance a. Socialized housing PhP75.00 for the first ten (10) Hectares b. Economic housing 150/ha. for the first five (5) has. * Inspection Fee a. Socialized housing 200.00/ha. b. Economic housing 500.00/ha. 2. Final Approval and Development Permit * Processing Fee a. Socialized housing 500.00/ha. b. Economic housing 1,000.00/ha. * Inspection Fee a. Socialized housing 200.00/ha. b. Economic housing 500.00/ha. 3. Alteration of Plan Same as Final Approval and (affected areas only) Development Permit 4. Building Permit (Floor area of housing unit) 5.00/sq.m. 5. Certificate of Registration * Application Fee a. Socialized housing 350.00 b. Economic housing 500.00 6. License to Sell (per saleable lot) a. Socialized housing 20.00/lot b. Economic housing 50.00/lot (Additional Fee on floor area of Houses/building sold w/lot) 2.00/sq.m. * Inspection Fee a. Socialized housing 200.00/ha. b. Economic housing 500.00/ha. 7. Extension of Time to Develop * Filing Fee a. Socialized housing 350.00 b. Economic housing 350.00 * Inspection Fee (affected/unfinished Areas only) a. Socialized housing 200.00/ha. b. Economic housing 500.00/ha. 8. Certificate of Completion (Per hectare or a fraction of land Area) * Certificate Fee a. Socialized housing 150.00 b. Economic housing 150.00 * Processing Fee a. Socialized housing 200.00/ha b. Economic housing 500.00/ha 9. Occupancy Permit 2.00/sq.m. * Inspection Fee (saleable floor area of the housing unit) a. Socialized housing 5.00/sq.m. b. Economic housing 5.00/sq.m. B. Condominium 1. Preliminary Approval and Locational Clearance PhP500.00 2. Final Approval and Development Permit a. Total land area 5.00/sq.m. b. Number of floor 100.00/flr. c. Building area 2.00/sq.m. of GFA * Inspection Fee 2.00/sq.m. of GFA 3. Alteration of Plan Same as Final Approval and (Affected areas only) Development Permit 4. Certificate of Registration 500.00 5. License to sell 5.00/sq.m. 6. Extension of Time to Develop 350.00 * Inspection Fee (Fax P2 x % of Remaining Development Cost) 2.00/sq.m. of saleable area 7. Certificate of Completion a. Certificate Fee 150.00 b. Processing Fee 3.00/sq.m. of GFA IV. Approval of Industrial/Commercial Subdivision A. Preliminary Approval and PhP300.00/ha. Locational Clearance * Inspection Fee 1,000.00/ha. Regardless of Location B. Final Approval and Development Permit 5,000.00/ha. Regardless of Location * Inspection Fee 1,000.00/ha. Regardless of Location (Project already inspected for PALC application may not be inspection fee) C. Alteration of Plan (affected areas only) Same as Final Approval and Development Permit D. Certification of Registration 2,000.00 E. License to Sell 2.00/sq.m. of the land area * Inspection Fee 1,000.00/ha. Regardless of Land area F. Extension of Time to Develop 350.00 * Inspection Fee 1,000.00/ha. Regardless of Location G. Certificate of Completion 1. Industrial 350.00/ha. Regardless of Location 2. Commercial 500.00/ha. Regardless of Location V. Approval of Farmlot Subdivision A. Preliminary Approval and PhP200.00/ha. Locational Clearance * Inspection Fee 500.00/ha. B. Final Approval and Development Permit * Inspection Fee 500.00/ha. (Project already inspected for PALC application may not be charged Inspection fee) C. Alteration of Plan Same as Final Approval and (Affected areas only) Development Permit D. Certificate of Registration 2,000.00 E. License to Sell 500.00/lot * Inspection Fee 1,000.00/lot F. Extension of Time to Develop 350.00 * Inspection Fee 1,000.00/ha. G. Certificate of Completion a. Certificate Fee 150.00 b. Processing Fee 1,000.00/ha. VI. Approval of Memorial Park/Cemetery Project/Columbarium A. Preliminary Approval and Locational Clearance 1. For Memorial Projects 500.00/ha 2. For Cemeteries 200.00/ha 3. Columbarium 2,500.00/ha * Inspection Fee 1. Memorial Projects 1,000.00/ha 2. Cemeteries 500.00/ha 3. Columbarium 12.00/sq.m. of GFA B. Final Approval and Development Permit 1. Memorial Projects 2.00/sq.m. 2. Cemeteries 1.00/sq.m. 3. Columbarium 200.00/floor 4.00/sq.m. of GFA 5.00/sq.m. of Land area * Inspection Fee (Project already inspected for PALC application may not be charged Inspection fee) 1. Memorial Projects 1,000.00/ha. 2. Cemeteries 500.00/ha. 3. Columbarium 12.00/sq.m. of GFA C. Alteration of Plan Same as Final Approval and Development Permit D. Certificate of Registration 2,000.00 E. License to Sell PhP500.00/lot 1. Memorial Projects Apartment Type 20.00/per unit 2. Cemeteries 20.00/tomb 3. Columbarium 50.00/vault * Inspection Fee (Project already inspected for PALC application may not be charged Inspection fee) 1. Memorial Projects 1,000.00/ha. 2. Cemeteries 500.00/ha. 3. Columbarium F. Extension of Time to Develop * Inspection Fee (affected/ unfinished areas only) 1. Memorial Projects 1,000.00/ha. 2. Cemeteries 500.00/ha. 3. Columbarium 12.00/sq.m. of the Remaining GFA G. Certificate of Completion * Certificate Fee 150.00 * Processing Fee 1. Memorial Projects 1,000.00/ha. 2. Cemeteries 500.00/ha. 3. Columbarium 4.00/sq.m. of GFA VII. Other Transaction/Certifications A. Application/Request for: 1. Advertisement Approval PhP500.00 2. Cancellation/Reduction of 2,000.00 Performance Bond 3. Lifting of Suspension of 2,000.00 License to Sell 4. Exemption from Cease 150.00 and Desist Order 5. Clearance to Mortgage 1,000.00 6. Lifting of Cease and Desist Order 2,000.00 7. Change of Name/Ownership 1,000.00 8. Voluntary cancellation of CR/LS 1,000.00 9. Revalidation/Renewal of Permit 50% of assessed current (condominium) Processing fees including Inspection fee B. Other Certifications 1. Zoning Certifications 500.00/ha. 2. Certification of Town Plan/ Zoning Ordinance Approval 150.00 3. Certificate of New Rights/Sales 150.00 4. Certificate of Registration (Form) 150.00 5. License to Sell (Form) 150.00 6. Certificate of Creditable Withholding Tax (maximum of 5 lots per certificate) 150.00 7. Others to include: a. Availability of records/ public request of copies/ research works PhP200.00 b. Certification of no records on file c. Certification of with or without CR/LS 200.00 d. Certified true/Xerox copy of documents (report size) 1. Document of five (5) pages or less 30.00 2. Every additional page 3.00 e. Photo copy of documents 2.00 VIII. Registration of Dealers/Brokers/Salesmen A. Dealers/Brokers PhP500.00 B. Salesmen/Agent 200.00 IX. Homeowners Association Fees 1. Registration of HOA Examination/Registration a. Articles of Incorporation PhP650.00 b. By-laws 650.00 c. Books 200.00 2. Amendments a. Articles of Incorporations 500.00 b. By-laws 500.00 3. Dissolution of Homeowners Association 500.00 4. Certificate of new set of officers 350.00 5. Other Certifications 150.00 * Inspection Fee (CMP Project) 500.00/ha. X. Legal Fees A. Filing Fee PhP1,000.00 B. Additional Fee for claims (For refund, damages, Attorney's fees. Etc.) 1. Not more than PhP20,000.00 120.00 2. More than PhP20,000.00 but less than PhP80,000.00 400.00 3. PhP80,000.00 or more but less than PhP100,000.00 600.00 4. PhP100,000.00 or more but less than PhP150,000.00 1,000.00 5. For each PhP1,000.00 in excess of PhP150,000.00 5.00 C. Petition for Review 2,000.00 D. Pauper-Litigants are exempt from payment of legal fees 1. Those whose gross income is not more than PhP5,000.00 per month and is residing Within Metro Manila 2. Those whose gross income is not more than PhP4,000.00 per month and is residing Outside Metro Manila 3. Those who do not own real property E. Government Agencies and its instrumentalities are Exempted from paying legal fees F. Local Governments and government owned or controlled corporations with or without independent Characters are not exempted from paying legal fees XI. UPLC Legal Research Fee Computation of LRF for the University of the Philippines Law Center (UPLR Fee) Remains at 1% of every fee charged but shall in no case be lower than 10.00 XI. n Research/Service Fee (50% discount for students) A1. Photocopy (maps: Subd./Condo.Plans) PhP100.00 2. Hard Copy from Diskettes 30.00 minimum: (License to sell data) 5.00/page in excess of 5 3. Electronic File 500.00/diskette; Additional 50.00 for Rush job 4. Electronic File (Land use Maps available) 1,000.00 5. Certified True Copy (Map/Land Use Plan) 100.00 B. Sale of Forms, Publications, etc. 1. Pro forma-Articles of Incorporation and By Laws 120.00 2. Books and other HLURB publications a. CLUP Guidelines VOLUME I Demography 120.00 VOLUME II Social Sector 380.00 VOLUME III Economic Sector 380.00 VOLUME IV Infrastructure & 250.00 Utilities Sector VOLUME V Land Use 300.00 VOLUME VI Local Administration 100.00 VOLUME VII Mapping 250.00 VOLUME VIII Report Writing 50.00 VOLUME IX Plan review, Adopting and Approval Process 230.00 VOLUME X Model Zoning Ordinance 150.00 b. PD 957 200.00 c. BP 220 200.00 d. Planning Strategies & Guidelines 200.00 RESOLVED FURTHER, that copies of this Ordinance be forwarded to the Sangguniang Panlalawigan, through the Hon. Benjamin Alonzo, Provincial Vice Governor and Presiding Officer, for their review and favorable approval; RESOLVED FURTHERMORE, that copies of this Ordinance be sent to the twenty-three (23) barangays , through their respective Barangay Captains, for posting in conspicuous places within their areas of jurisdiction; RESOLVED FINALLY, that copies of this Ordinance be furnished the Hon. Antonio L. Raymundo Jr., Municipal Mayor, the Municipal Treasurer, the Municipal Engineer, the MPDC, the Provincial Treasurer and the Commission on Audit for their information and appropriate action. Enacted unanimously. October 19, 2004. I hereby certify that the Sangguniang Bayan of Orion duly enacted the foregoing Ordinance on the date specified therein. CARLOTA T. VALERIO Secretary to the Sangguniang Bayan ATTESTED TO BE ENACTED: VIRGILIO B. ISIDRO Municipal Vice Mayor and Presiding Officer APPROVED: ANTONIO L. RAYMUNDO JR. Municipal Mayor Date _______________ n Note from the Publisher: Copied verbatim from the official copy.

Ask what this means for your situation

The assistant quotes the passage it relies on and links the source, so you can check every figure it gives you.